| 0001 | Mobilization (0000100000-N) | LS | 1 | $149,300 | $175,000 | $180,900 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $18,500 | $24,375 | $51,082 |
| 0003 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1.00 | $1.00 | $5.00 |
| 0004 | Undercut excavation (0057000000-E) | CY | 550 | $5.29 | $15.00 | $17.00 |
| 0005 | Grading (0063000000-N) | LS | 1 | $459,583 | $404,000 | $26,044 |
| 0006 | Borrow excavation (0106000000-E) | CY | 6,100 | $0.01 | $14.95 | $16.25 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 15 | $39.15 | $40.00 | $29.00 |
| 0008 | Select granular material (0195000000-E) | CY | 200 | $0.01 | $50.00 | $75.25 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 400 | $5.45 | $5.25 | $4.00 |
| 0010 | Temporary shoring (0199000000-E) | SF | 760 | $71.90 | $25.00 | $119.00 |
| 0011 | Generic grading item (LS) - type 2 bridge approach fill, station 15+22.40 -L- (0248000000-N) | LS | 1 | $34,475 | $60,000 | $23,000 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 128 | $44.45 | $45.00 | $42.50 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 501 | $6.25 | $7.00 | $4.50 |
| 0014 | 15" drainage pipe (0335200000-E) | LF | 24 | $132.30 | $184.00 | $107.75 |
| 0015 | 18" drainage pipe (0335300000-E) | LF | 116 | $113.88 | $163.00 | $72.25 |
| 0016 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 8 | $300.00 | $1,000.00 | $599.75 |
| 0017 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 156 | $123.41 | $130.00 | $88.75 |
| 0018 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 128 | $140.22 | $165.00 | $109.50 |
| 0019 | **"WLD STL pipe grad B in soil - (15", 0.625") (0973100000-E) | LF | 344 | $272.78 | $245.00 | $1,070.75 |
| 0020 | Pipe removal (0995000000-E) | LF | 97 | $0.01 | $20.00 | $23.75 |
| 0021 | Shallow undercut (1099500000-E) | CY | 100 | $26.05 | $32.00 | $29.00 |
| 0022 | Class IV subgrade stabilization (1099700000-E) | TON | 200 | $39.45 | $38.00 | $35.75 |
| 0023 | Geotextile for subgrade stabilization (1112000000-E) | SY | 300 | $6.70 | $6.50 | $3.75 |
| 0024 | Incidental stone base (1220000000-E) | TON | 100 | $51.05 | $40.00 | $37.75 |
| 0025 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 1,810 | $6.55 | $7.00 | $8.50 |
| 0026 | Incidental milling (1330000000-E) | SY | 500 | $19.50 | $21.00 | $19.50 |
| 0027 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 430 | $140.00 | $140.00 | $147.00 |
| 0028 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 90 | $220.00 | $220.00 | $231.00 |
| 0029 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 600 | $145.00 | $145.00 | $152.25 |
| 0030 | Asphalt binder for plant mix (1575000000-E) | TON | 65 | $750.00 | $750.00 | $787.50 |
| 0031 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 115 | $0.01 | $225.00 | $210.64 |
| 0032 | Pipe plugs (2264000000-E) | CY | 0.05 | $28,743 | $1.00 | $23,121 |
| 0033 | Masonry drainage structures (2286000000-N) | EACH | 14 | $4,939.33 | $3,600.00 | $3,775.50 |
| 0034 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 2 | $2,935.24 | $1,700.00 | $2,199.00 |
| 0035 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 8 | $1,369.95 | $3,300.00 | $2,199.00 |
| 0036 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $1,179.63 | $2,291.00 | $2,199.00 |
| 0037 | Generic drainage item (EA) 840 - frame with cover, STD 840.55 (2472000000-N) | EACH | 2 | $1,134.31 | $1,300.00 | $2,199.00 |
| 0038 | Shoulder berm gutter (2556000000-E) | LF | 67 | $70.00 | $80.00 | $65.00 |
| 0039 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 230 | $124.65 | $150.00 | $120.75 |
| 0040 | Steel beam guardrail (3030000000-E) | LF | 475 | $23.00 | $23.00 | $24.25 |
| 0041 | Steel beam guardrail, shop curved (3045000000-E) | LF | 137.50 | $30.00 | $30.00 | $31.50 |
| 0042 | Additional guardrail posts (3150000000-N) | EACH | 5 | $1.00 | $1.00 | $1.05 |
| 0043 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $850.00 | $850.00 | $892.50 |
| 0044 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $3,200.00 | $3,200.00 | $3,360.00 |
| 0045 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 3 | $3,100.00 | $3,100.00 | $3,255.00 |
| 0046 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 8 | $2,600.00 | $2,600.00 | $2,730.00 |
| 0047 | Remove existing guardrail (3360000000-E) | LF | 632 | $1.00 | $1.00 | $1.05 |
| 0048 | Rip rap, class B (3649000000-E) | TON | 26 | $64.85 | $100.00 | $54.50 |
| 0049 | Geotextile for drainage (3656000000-E) | SY | 525 | $2.35 | $7.00 | $3.50 |
| 0050 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 250 | $9.00 | $8.15 | $9.00 |
| 0051 | Sign erection, type D (4096000000-N) | EACH | 1 | $125.00 | $220.00 | $131.25 |
| 0052 | Sign erection, type E (4102000000-N) | EACH | 4 | $75.00 | $185.00 | $78.75 |
| 0053 | Sign erection, type F (4108000000-N) | EACH | 6 | $100.00 | $205.00 | $131.25 |
| 0054 | Disposal of sign system, U-channel (4155000000-N) | EACH | 11 | $2.00 | $5.00 | $26.25 |
| 0055 | Work zone signs (stationary) (4400000000-E) | SF | 638 | $12.00 | $6.00 | $8.50 |
| 0056 | Work zone signs (portable) (4405000000-E) | SF | 128 | $34.85 | $8.25 | $16.80 |
| 0057 | Work zone signs (barricade mounted) (4410000000-E) | SF | 114 | $8.00 | $6.65 | $8.40 |
| 0058 | Portable changeable message sign (short term) (4422000000-N) | DAY | 8 | $198.05 | $110.00 | $138.30 |
| 0059 | Drums (4430000000-N) | EACH | 50 | $67.65 | $101.40 | $35.75 |
| 0060 | Barricades (type III) (4445000000-E) | LF | 96 | $30.00 | $17.00 | $35.75 |
| 0061 | Flagger (4455000000-N) | DAY | 104 | $425.00 | $400.00 | $519.75 |
| 0062 | Temporary crash cushions (4465000000-N) | EACH | 4 | $7,900.00 | $7,900.00 | $9,450.00 |
| 0063 | Portable concrete barrier (anchored) (4490000000-E) | LF | 590 | $63.00 | $63.00 | $74.50 |
| 0064 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 34.17 | $25.00 | $25.00 | $26.25 |
| 0065 | Paint pavement marking lines (4") (4810000000-E) | LF | 3,304 | $2.25 | $2.25 | $2.36 |
| 0066 | Paint pavement marking lines (24") (4835000000-E) | LF | 10 | $50.00 | $50.00 | $52.50 |
| 0067 | Polyurea lines (**", *** mils) - (4", 30 mils) (4846000000-E) | LF | 3,868 | $3.50 | $3.50 | $3.68 |
| 0068 | Removal of pavement marking lines (4") (4850000000-E) | LF | 765 | $3.00 | $3.00 | $3.15 |
| 0069 | Removal of pavement marking lines (24") (4870000000-E) | LF | 10 | $20.00 | $20.00 | $21.00 |
| 0070 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 21 | $200.00 | $200.00 | $210.00 |
| 0071 | 6" water line (5325600000-E) | LF | 722 | $127.72 | $180.45 | $304.50 |
| 0072 | DI H2O pipe fittings (5329000000-E) | LB | 955 | $23.61 | $17.00 | $18.90 |
| 0073 | 6" valve (5540000000-E) | EACH | 2 | $3,964.75 | $6,800.00 | $7,875.00 |
| 0074 | Relocate water meter (5648000000-N) | EACH | 3 | $2,871.74 | $3,500.00 | $2,604.00 |
| 0075 | Reconnect water meter (5649000000-N) | EACH | 2 | $2,025.59 | $3,500.00 | $4,063.50 |
| 0076 | Water service line (<2") (5686500000-E) | LF | 336 | $53.00 | $115.00 | $184.80 |
| 0077 | Abandon 6" utility pipe (5800000000-E) | LF | 625 | $15.37 | $20.00 | $26.25 |
| 0078 | 16" encasement pipe (5835700000-E) | LF | 95 | $156.86 | $420.00 | $393.75 |
| 0079 | Bore & jack **" - (16") (5872500000-E) | LF | 95 | $755.56 | $995.00 | $1,443.75 |
| 0080 | Temporary silt fence (6000000000-E) | LF | 765 | $4.50 | $2.65 | $2.75 |
| 0081 | Stone for erosion control, class A (6006000000-E) | TON | 150 | $0.01 | $60.00 | $52.50 |
| 0082 | Stone for erosion control, class B (6009000000-E) | TON | 245 | $0.01 | $62.00 | $54.25 |
| 0083 | Sediment control stone (6012000000-E) | TON | 180 | $0.01 | $60.00 | $81.75 |
| 0084 | Temporary mulching (6015000000-E) | ACRE | 1 | $3,000.00 | $1,900.00 | $1,995.00 |
| 0085 | Seed for temporary seeding (6018000000-E) | LB | 100 | $0.01 | $1.00 | $1.05 |
| 0086 | Fertilizer for temporary seeding (6021000000-E) | TON | 0.50 | $1.00 | $300.00 | $315.00 |
| 0087 | Temporary slope drains (6024000000-E) | LF | 200 | $13.25 | $22.00 | $14.71 |
| 0088 | Safety fence (6029000000-E) | LF | 60 | $4.50 | $1.50 | $1.50 |
| 0089 | Silt excavation (6030000000-E) | CY | 380 | $0.01 | $28.00 | $0.01 |
| 0090 | Matting for erosion control (6036000000-E) | SY | 2,000 | $1.66 | $1.75 | $1.84 |
| 0091 | 1/4" hardware cloth (6042000000-E) | LF | 585 | $6.00 | $6.00 | $6.30 |
| 0092 | Flocculant (6071002000-E) | LB | 70 | $1.00 | $8.00 | $8.40 |
| 0093 | Coir fiber wattle (6071012000-E) | LF | 120 | $20.00 | $13.00 | $13.65 |
| 0094 | Seeding and mulching (6084000000-E) | ACRE | 1 | $2,500.00 | $3,000.00 | $3,150.00 |
| 0095 | Mowing (6087000000-E) | ACRE | 0.50 | $1.00 | $150.00 | $157.50 |
| 0096 | Seed for repair seeding (6090000000-E) | LB | 50 | $0.01 | $4.00 | $4.20 |
| 0097 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1.00 | $500.00 | $525.00 |
| 0098 | Seed for supplemental seeding (6096000000-E) | LB | 50 | $8.00 | $4.00 | $4.20 |
| 0099 | Fertilizer topdressing (6108000000-E) | TON | 0.75 | $3,000.00 | $500.00 | $525.00 |
| 0100 | Specialized hand mowing (6114500000-N) | MHR | 10 | $1.00 | $55.00 | $57.75 |
| 0101 | Response for erosion control (6117000000-N) | EACH | 13 | $1.00 | $300.00 | $315.00 |
| 0102 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,000.00 | $1.00 | $2,812.87 |
| 0103 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 18 | $96.00 | $200.00 | $130.25 |
| 0104 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 6 | $278.00 | $200.00 | $242.50 |
| 0105 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 3 | $650.00 | $400.00 | $560.00 |
| 0106 | MSE retain wall no ** - (1) (8801000000-E) | SF | 1,576 | $141.30 | $184.00 | $128.00 |
| 0107 | MSE retain wall no ** - (2) (8801000000-E) | SF | 1,448 | $141.77 | $184.00 | $128.00 |
| 0108 | Remv exist STR ****** BRG (402) - (15+22.40 -L-) (8035000000-N) | LS | 1 | $153,600 | $262,149 | $528,100 |
| 0109 | Asbestos assessment (8065000000-N) | LS | 1 | $1,552.15 | $2,000.00 | $1,785.00 |
| 0110 | Reinforced concrete deck slab (8147000000-E) | SF | 1,885 | $106.48 | $75.50 | $58.00 |
| 0111 | Grooving bridge floors (8161000000-E) | SF | 2,131 | $4.32 | $3.00 | $2.60 |
| 0112 | Class A concrete (bridge) (8182000000-E) | CY | 67.40 | $1,855.53 | $1,780.00 | $2,059.00 |
| 0113 | BRG appr slab *********** - (15+22.40 -L-) (8210000000-N) | LS | 1 | $44,600 | $50,000 | $28,000 |
| 0114 | Reinforcing steel (bridge) (8217000000-E) | LB | 9,304 | $1.92 | $2.20 | $1.27 |
| 0115 | 36" prestressed concrete girders (8259000000-E) | LF | 222.88 | $398.76 | $546.00 | $410.00 |
| 0116 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 16 | $1,876.30 | $1,730.00 | $2,200.00 |
| 0117 | HP 12 X 53 steel piles (8364000000-E) | LF | 960 | $50.76 | $89.00 | $70.00 |
| 0118 | Dynamic pile testing (8394000000-N) | EACH | 1 | $3,675.00 | $3,000.00 | $2,310.00 |
| 0119 | Concrete barrier rail (8503000000-E) | LF | 113.40 | $243.15 | $252.00 | $156.00 |
| 0120 | 4" slope protection (8531000000-E) | SY | 20.20 | $789.18 | $400.00 | $207.00 |
| 0121 | Elastomeric bearings (8657000000-N) | LS | 1 | $2,625.00 | $27,000 | $9,200.00 |
| 0122 | Foam joint seals (8692000000-N) | LS | 1 | $22,525 | $31,000 | $13,300 |