Apac - Atlantic, Inc. Thompson Arthur Division: NCDOT bid record
Apac - Atlantic, Inc. Thompson Arthur Division submitted 128 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 15 SEP 2026, and was the low bidder on 44 of them (34%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $333,935,558
- Latest bid
- 15 SEP 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 30 | 6 | 20% |
| 2014 | 14 | 4 | 29% |
| 2015 | 10 | 4 | 40% |
| 2016 | 8 | 4 | 50% |
| 2017 | 3 | 2 | 67% |
| 2018 | 6 | 1 | 17% |
| 2020 | 3 | 1 | 33% |
| 2021 | 16 | 8 | 50% |
| 2022 | 7 | 3 | 43% |
| 2023 | 4 | 1 | 25% |
| 2024 | 13 | 3 | 23% |
| 2025 | 7 | 4 | 57% |
| 2026 | 7 | 3 | 43% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Randolph | 25 | 11 | 44% |
| Guilford | 18 | 4 | 22% |
| Forsyth | 17 | 13 | 76% |
| Rockingham | 11 | 3 | 27% |
| Alamance | 10 | 3 | 30% |
| Davidson | 7 | 1 | 14% |
| Davie | 4 | 2 | 50% |
| Stokes | 4 | 2 | 50% |
| Rowan | 4 | 1 | 25% |
| Alamance, Guilford | 3 | 0 | 0% |
| Montgomery | 3 | 0 | 0% |
| Caswell | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 90 | 62 (69%) | $120.00 | $135.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 76 | 61 (80%) | $0.46 | $0.75 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 80 | 56 (70%) | $0.20 | $0.27 |
| Snowplowable pavement markers | 4905000000-N | EACH | 60 | 49 (82%) | $25.88 | $29.50 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 69 | 47 (68%) | $3.00 | $3.50 |
| Asphalt binder for plant mix | 1575000000-E | TON | 119 | 40 (34%) | $583.00 | $595.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 66 | 39 (59%) | $2.00 | $2.25 |
| Adjustment of manholes | 2830000000-N | EACH | 63 | 39 (62%) | $910.00 | $900.00 |
| Incidental milling | 1330000000-E | SY | 107 | 36 (34%) | $6.90 | $12.00 |
| Paint pavement marking lines (8") | 4820000000-E | LF | 55 | 36 (65%) | $0.75 | $0.82 |
| Paint pavement marking symbol | 4845000000-N | EACH | 64 | 35 (55%) | $50.00 | $50.00 |
| Adjustment of meter boxes or valve boxes | 2845000000-N | EACH | 62 | 34 (55%) | $687.50 | $725.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 69 | 21 of 69 |
| FSC II LLC DBA Fred Smith Company | 32 | 11 of 32 |
| Vecellio & Grogan Inc DBA Sharpe Brothers | 27 | 13 of 27 |
| Sharpe Brothers A Div of Vecellio & Grogan, Inc. | 26 | 9 of 26 |
| J. T. Russell & Sons, Inc. | 23 | 10 of 23 |
| Larco Construction A Division of Branscome Inc | 21 | 7 of 21 |
| Smith-Rowe, LLC | 19 | 14 of 19 |
| Dane Construction, Inc. | 18 | 5 of 18 |
| W C English Incorporated | 13 | 1 of 13 |
| Sharpe Brothers A Division of Vecellio & Grogan Inc | 12 | 5 of 12 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 SEP 2026 | C205234 | Rockingham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-704, 1 SECTION OF NC-14, 1 SECTION OF US-158, AND 6 SECTIONS OF SECONDARY | 1 of 3 | $7,041,390 | Low, 8.0% under the second |
| 15 SEP 2026 | C204990 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS | 1 of 9 | $8,375,966 | Low, 0.0% under the second |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 2 of 11 | $13,168,309 | +6.0% |
| 19 MAY 2026 | C205197 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS, AND 1 SECTION OF NC-49 | 2 of 5 | $5,786,032 | 0.0% |
| 21 APR 2026 | C205193 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDA | 3 of 5 | $5,979,809 | +4.0% |
| 17 FEB 2026 | C205169 | Stokes | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF NC-268, AND 3 SECTIONS OF SECONDARY ROADS | 1 of 1 | $6,296,326 | Low |
| 20 JAN 2026 | C205128 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780176 OVER NC-14/NC-87 ON SR-1700 (FISHER HILL RD) | 2 of 3 | $3,525,000 | +18% |
| 21 OCT 2025 | C205142 | Forsyth | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158, 1 SECTION OF NC-66, AND 15 SECTIONS OF SECONDARY ROADS | 1 of 2 | $8,767,791 | Low, 21% under the second |
| 17 JUN 2025 | C205016 | Davidson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | 1 of 9 | $7,680,854 | Low, 4.0% under the second |
| 20 MAY 2025 | C205102 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64, 2 SECTIONS OF NC-22, AND 1 SECTION OF NC-42 | 1 of 5 | $3,999,559 | Low, 6.0% under the second |
| 20 MAY 2025 | C205087 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 13 SECTIONS OF SECONDARY ROADS | 1 of 3 | $3,662,144 | Low, 11% under the second |
| 20 MAY 2025 | C205089 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS | 3 of 5 | $4,190,955 | +13% |
| 18 FEB 2025 | C204980 | Forsyth | GRADING, DRAINAGE, PAVING, AND WALLS. GREAT WAGON ROAD FROM SR-1001 (SHALLOWFORD ROAD) TO SR-1308 (LEWISVILLE-VIENNA ROAD) | 4 of 7 | $22,628,000 | +14% |
| 18 FEB 2025 | C204979 | Davie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #290076 OVER I-40 ON SR-1436 (PINEBROOK SCHOOL RD) | 2 of 10 | $4,462,485 | +5.0% |
| 17 DEC 2024 | C205003 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 15 SECTIONS OF SECONDARY ROADS | 1 of 5 | $4,441,807 | Low, 5.0% under the second |
| 17 DEC 2024 | C204821 | Guilford | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AN | 4 of 5 | $21,241,786 | +20% |
| 19 NOV 2024 | C204998 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-49/NC-54/NC-87 AND 3 SECTIONS OF SECONDARY ROADS | 2 of 4 | $6,107,554 | +6.0% |
| 15 OCT 2024 | C204986 | Davidson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-109, AND 7 SECTIONS OF SECONDARY ROADS | 2 of 4 | $7,202,206 | +2.0% |
| 15 OCT 2024 | C204985 | Forsyth | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF OF US-158, AND 5 SECTIONS OF SECONDARY ROADS | 1 of 2 | $6,804,757 | Low, 8.0% under the second |
| 20 AUG 2024 | C204864 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780178 OVER US-29 ON SR-1929 | 3 of 7 | $4,423,081 | +11% |
| 28 MAY 2024 | C204959 | Alamance, Guilford | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 29 SECTIONS OF SECONDARY ROADS | 3 of 4 | $5,133,895 | +1.0% |
| 19 MAR 2024 | C204928 | Guilford, Rockingham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-62 AND 39 SECTIONS OF SECONDARY ROADS | 3 of 3 | $6,970,646 | +20% |
| 19 MAR 2024 | C204876 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #170 OVER US-220 ON SR-1360 | 2 of 9 | $3,353,906 | +8.0% |
| 19 MAR 2024 | C204916 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 8 SECTIONS OF SECONDARY ROADS | 2 of 5 | $3,126,301 | +1.0% |
| 19 MAR 2024 | C204927 | Forsyth | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF US-158, 2 RAMPS ON US-158, 4 SECTIONS OF US-421, AND 3 SECTIONS OF SECONDAR | 1 of 1 | $8,955,273 | Low |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.