Dane Construction, Inc.: NCDOT bid record
Dane Construction, Inc. submitted 293 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 18 AUG 2026, and was the low bidder on 33 of them (11%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $109,789,956
- Latest bid
- 18 AUG 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 48 | 9 | 19% |
| 2014 | 29 | 3 | 10% |
| 2015 | 24 | 3 | 13% |
| 2016 | 29 | 3 | 10% |
| 2017 | 24 | 1 | 4% |
| 2018 | 30 | 4 | 13% |
| 2019 | 13 | 3 | 23% |
| 2020 | 5 | 0 | 0% |
| 2021 | 29 | 1 | 3% |
| 2022 | 21 | 1 | 5% |
| 2023 | 13 | 1 | 8% |
| 2024 | 9 | 0 | 0% |
| 2025 | 11 | 2 | 18% |
| 2026 | 8 | 2 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rockingham | 14 | 1 | 7% |
| Wake | 13 | 2 | 15% |
| Cabarrus | 12 | 3 | 25% |
| Guilford | 10 | 0 | 0% |
| Granville | 9 | 5 | 56% |
| Alamance | 8 | 3 | 38% |
| Randolph | 8 | 0 | 0% |
| Buncombe | 7 | 1 | 14% |
| Davidson | 7 | 1 | 14% |
| Wilkes | 6 | 0 | 0% |
| Forsyth | 6 | 0 | 0% |
| Robeson | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Response for erosion control | 6117000000-N | EACH | 252 | 155 (62%) | $50.00 | $150.00 |
| Additional guardrail posts | 3150000000-N | EACH | 253 | 149 (59%) | $11.00 | $13.00 |
| Asphalt binder for plant mix | 1575000000-E | TON | 262 | 143 (55%) | $600.00 | $595.00 |
| Supplementary clearing & grubbing | 0050000000-E | ACRE | 188 | 125 (66%) | $100.00 | $150.00 |
| Barricades (type III) | 4445000000-E | LF | 262 | 120 (46%) | $20.00 | $24.30 |
| Guardrail anchor units, type III | 3215000000-N | EACH | 175 | 120 (69%) | $1,500.00 | $1,600.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 171 | 114 (67%) | $0.35 | $0.27 |
| Safety fence | 6029000000-E | LF | 261 | 108 (41%) | $2.00 | $2.20 |
| Seed for supplemental seeding | 6096000000-E | LB | 266 | 105 (39%) | $4.38 | $4.50 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 263 | 105 (40%) | $6.60 | $7.50 |
| Shoulder berm gutter | 2556000000-E | LF | 215 | 105 (49%) | $35.00 | $42.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 261 | 103 (39%) | $7.00 | $7.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Smith-Rowe, LLC | 148 | 119 of 148 |
| S T Wooten Corporation | 81 | 50 of 81 |
| Dellinger, Inc. | 73 | 39 of 73 |
| FSC II LLC DBA Fred Smith Company | 64 | 39 of 64 |
| R.E. Burns & Sons Co., Inc. | 62 | 48 of 62 |
| Blythe Construction Inc | 55 | 19 of 55 |
| Caton Construction Group Inc | 40 | 15 of 40 |
| NHM Constructors, LLC | 40 | 17 of 40 |
| W C English Incorporated | 39 | 19 of 39 |
| Palmetto Infrastructure Inc | 35 | 9 of 35 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 7 of 8 | $2,658,322 | +42% |
| 18 AUG 2026 | C205070 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-120 | 2 of 9 | $7,544,377 | +7.0% |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 9 of 11 | $16,830,308 | +36% |
| 19 MAY 2026 | C204733 | Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #980029 OVER I-77 ON US-21 BUS | 3 of 4 | $19,533,765 | +18% |
| 19 MAY 2026 | C205191 | Mitchell | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD). BRG #600054 ON SR-1217, BRG #600160 ON SR-1202, BRG #600178 ON SR-1210, AND BRG #60 | 1 of 3 | $7,065,635 | Low, 8.0% under the second |
| 19 MAY 2026 | C205196 | Buncombe, Mitchell, Yancey | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD), ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). BRIDGE #100678, CULVERT B | 1 of 3 | $8,389,750 | Low, 8.0% under the second |
| 17 FEB 2026 | C204936 | Alamance | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STURCTURES. BRIDGE #000014 OVER CANE CREEK ON NC-87 | 5 of 7 | $8,756,539 | +14% |
| 20 JAN 2026 | C205132 | Cleveland | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220075 ON NC-226 (POLKVILLE ROAD) OVER HINTON CREEK | 3 of 6 | $6,896,818 | +27% |
| 16 SEP 2025 | C205122 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD)., ROADWAY AND CULVERT CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGES ON SR-2109, SR-211 | 1 of 2 | $8,469,900 | Low, 9.0% under the second |
| 17 JUN 2025 | C205016 | Davidson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | 9 of 9 | $10,492,096 | +37% |
| 17 JUN 2025 | C205015 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | 8 of 8 | $22,564,944 | +24% |
| 18 MAR 2025 | C204938 | Cleveland | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220025 OVER BUFFALO CREEK ON SR-2033 (OAK GROVE ROAD) | 4 of 6 | $6,079,413 | +17% |
| 18 MAR 2025 | C204766 | Madison | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #560067 OVER THE FRENCH BROAD R | 8 of 8 | $22,228,868 | +32% |
| 18 MAR 2025 | C205047 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #100115 ON SR-2789, BRIDGE #100308 ON SR-2419, AND BRIDGE #100380 ON SR-2432 | 2 of 2 | $7,234,960 | +18% |
| 18 MAR 2025 | C205065 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990157 OVER ELK SHOAL CREEK ON SR-1388 AND BRIDGES #990233, #990192, AND #99 | 1 of 3 | $4,958,190 | Low, 0.0% under the second |
| 18 FEB 2025 | C204978 | Stokes | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840082 OVER THE DAN RIVER ON SR-1674 (SHEPPARD MILL ROAD) | 2 of 8 | $7,674,174 | +16% |
| 18 FEB 2025 | C204979 | Davie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #290076 OVER I-40 ON SR-1436 (PINEBROOK SCHOOL RD) | 5 of 10 | $5,290,861 | +25% |
| 18 FEB 2025 | C205026 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #100428 ON SR-2429, BRG #100203 ON SR-2416, BRG #100307 ON SR-2426, AND BRG #100 | 2 of 3 | $8,395,060 | +11% |
| 21 JAN 2025 | C204972 | Johnston | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #500070 OVER NEUSE RIVER ON US-301 | 7 of 10 | $12,009,619 | +28% |
| 19 DEC 2024 | C205019 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD), ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580115 ON SR-1569 AN | 3 of 3 | $5,041,490 | +59% |
| 17 DEC 2024 | C204384 | Cabarrus | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #120109 OVER US-29 (NORTH CANNON BLVD) ON SR-1706 (MARTIN LUTHER KING JR AVENUE) | 7 of 9 | $7,376,126 | +29% |
| 17 DEC 2024 | C204969 | Anson | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030087 OVER RICHARDSON CREEK ON NC-742 | 3 of 11 | $4,555,237 | +20% |
| 20 AUG 2024 | C204925 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430095 OVER SOUTHERN RAILROAD ON US-74 | 6 of 7 | $21,849,261 | +24% |
| 18 JUN 2024 | C204950 | Anson | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030014 OVER S FORK JONES CREEK ON US-52 | 4 of 10 | $6,376,906 | +17% |
| 28 MAY 2024 | C204762 | Caswell | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #160001 OVER COUNTRY LINE CREEK ON US-158/NC-86 | 4 of 6 | $7,670,306 | +18% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.