R.E. Burns & Sons Co., Inc.: NCDOT bid record
R.E. Burns & Sons Co., Inc. submitted 89 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 18 AUG 2026, and was the low bidder on 27 of them (30%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $70,801,774
- Latest bid
- 18 AUG 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 23 | 5 | 22% |
| 2014 | 8 | 4 | 50% |
| 2015 | 7 | 3 | 43% |
| 2016 | 15 | 3 | 20% |
| 2017 | 6 | 2 | 33% |
| 2018 | 6 | 1 | 17% |
| 2019 | 4 | 2 | 50% |
| 2020 | 2 | 1 | 50% |
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 0 | 0% |
| 2024 | 2 | 1 | 50% |
| 2025 | 5 | 2 | 40% |
| 2026 | 4 | 2 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Buncombe | 6 | 3 | 50% |
| Rockingham | 6 | 2 | 33% |
| Guilford | 5 | 2 | 40% |
| Stanly | 4 | 0 | 0% |
| Alamance | 4 | 1 | 25% |
| Mcdowell | 3 | 1 | 33% |
| Rutherford | 3 | 2 | 67% |
| Iredell | 3 | 1 | 33% |
| Henderson | 3 | 0 | 0% |
| Randolph | 3 | 1 | 33% |
| Transylvania | 3 | 0 | 0% |
| Chatham | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Specialized hand mowing | 6114500000-N | MHR | 51 | 48 (94%) | $10.00 | $64.75 |
| Mowing | 6087000000-E | ACRE | 50 | 45 (90%) | $10.00 | $150.00 |
| Additional guardrail posts | 3150000000-N | EACH | 55 | 40 (73%) | $11.00 | $13.00 |
| Temporary silt fence | 6000000000-E | LF | 56 | 35 (63%) | $2.20 | $2.63 |
| Geotextile for drainage | 8622000000-E | SY | 51 | 34 (67%) | $2.00 | $3.00 |
| Silt excavation | 6030000000-E | CY | 53 | 33 (62%) | $4.00 | $9.62 |
| Asphalt binder for plant mix | 1575000000-E | TON | 54 | 32 (59%) | $600.00 | $595.00 |
| Barricades (type III) | 4445000000-E | LF | 56 | 29 (52%) | $17.50 | $24.30 |
| Work zone signs (stationary) | 4400000000-E | SF | 55 | 29 (53%) | $4.50 | $7.25 |
| Disposal of sign system, U-channel | 4155000000-N | EACH | 41 | 29 (71%) | $1.00 | $5.00 |
| Steel beam guardrail | 3030000000-E | LF | 41 | 29 (71%) | $15.00 | $15.12 |
| Geotextile for drainage | 3656000000-E | SY | 54 | 28 (52%) | $2.00 | $2.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 62 | 14 of 62 |
| Smith-Rowe, LLC | 44 | 29 of 44 |
| Apple Tuck & Associates, Inc. | 23 | 12 of 23 |
| Dellinger, Inc. | 23 | 7 of 23 |
| James R Vannoy & Sons Construction Company Inc | 16 | 4 of 16 |
| Blythe Construction Inc | 15 | 1 of 15 |
| NHM Constructors, LLC | 13 | 3 of 13 |
| Country Boy Landscaping Inc | 13 | 4 of 13 |
| Young & McQueen Grading Co Inc | 13 | 3 of 13 |
| Eastern Structures LLC | 13 | 7 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 1 of 8 | $1,868,025 | Low, 7.0% under the second |
| 18 AUG 2026 | C205224 | Rutherford | BRIDGE REPLACEMENT (EXPRESS DESIGN-BUILD). BRIDGE #800239 OVER CATHEYS CREEK ON SR-1325 (NANNEYTOWN RD) | 1 of 4 | $1,484,000 | Low, 13% under the second |
| 18 AUG 2026 | C205228 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD). BRIDGE #580023 OVER LAKE TAHOMA ON NC-80 (LAKE TAHOMA RD) | 3 of 3 | $5,228,840 | +44% |
| 19 MAY 2026 | C205191 | Mitchell | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD). BRG #600054 ON SR-1217, BRG #600160 ON SR-1202, BRG #600178 ON SR-1210, AND BRG #60 | 2 of 3 | $7,612,655 | +8.0% |
| 16 DEC 2025 | C205141 | Rutherford | BRIDGE REPLACEMENT. (EXPRESS DESIGN BUILD). BRIDGE #800036 OVER SECOND BROAD RIVER ON US-74 BUSINESS | 3 of 5 | $6,849,735 | +28% |
| 21 OCT 2025 | C205111 | Mitchell, Yancey | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD), ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). CULVERT #600050 ON SR-120 | 2 of 2 | $7,850,290 | +5.0% |
| 18 MAR 2025 | C205047 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #100115 ON SR-2789, BRIDGE #100308 ON SR-2419, AND BRIDGE #100380 ON SR-2432 | 1 of 2 | $6,151,245 | Low, 18% under the second |
| 18 MAR 2025 | C205030 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990173 OVER MIDDLE CREEK ON SR-1159, AND BRIDGE #990156 OVER COLBERT CREEK O | 1 of 3 | $3,046,805 | Low, 41% under the second |
| 09 JAN 2025 | C205021 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580044 OVER CURTIS CREEK ON US-70 AND BRIDGE #580090 OVER MILL CREEK ON SR-1 | 2 of 3 | $4,971,245 | +9.0% |
| 19 DEC 2024 | C205019 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD), ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580115 ON SR-1569 AN | 1 of 3 | $3,170,014 | Low, 45% under the second |
| 16 JAN 2024 | C204830 | Stanly | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #102 OVER LONG CREEK ON SR-1917 | 2 of 9 | $2,396,318 | +6.0% |
| 20 DEC 2022 | C204361 | Lincoln | Grading, drainage, paving, and structure. BRIDGE #7 OVER INDIAN CREEK ON NC-182. | 3 of 5 | $2,376,172 | +9.0% |
| 19 JUL 2022 | C204538 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #80 OVER NORTH DEEP CREEK TRIBUTARY 4B ON SR-1512. | 2 of 7 | $687,413 | 0.0% |
| 15 MAR 2022 | C204713 | Columbus | Replace 3 bridges and 1 culvert with bridge. 4 STRUCTURES ON SR-1928 (DOCK ROAD) IN COLUMBUS COUNTY. | 5 of 5 | $7,305,000 | +44% |
| 21 DEC 2021 | C204406 | Mitchell, Mcdowell, Burke, Buncombe | Replace four bridges. 1 BRIDGE IN BUNCOMBE COUNTY, 1 BRIDGE IN BURKE COUNTY, 1 BRIDGE IN MCDOWELL COUNTY, AND 1 BRIDGE IN MITCHELL COUNTY. | 1 of 7 | $4,200,819 | Low, 29% under the second |
| 20 JUL 2021 | C204627 | Iredell | Grading, drainage, paving, and structure. BRIDGE #131 OVER SNOW CREEK ON SR-1577 (PISGAH RIDGE CIR). | 5 of 8 | $648,773 | +17% |
| 20 APR 2021 | C204611 | Wilkes, Alleghany | Bridge replacements. 3 BRIDGES IN ALLEGHANY AND WILKES COUNTIES. | 4 of 4 | $4,798,345 | +17% |
| 16 FEB 2021 | C204386 | Buncombe | Grading, drainage, paving, and structure. BRIDGE #79 OVER BROAD RIVER ON NC-9. | 2 of 6 | $1,096,035 | +10% |
| 15 DEC 2020 | C204486 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #166 OVER WEST PRONG ROARING RIVER ON SR-1745. | 5 of 9 | $1,017,257 | +10% |
| 15 DEC 2020 | C204516 | Iredell | Grading, drainage, paving, and structures. BRIDGE #165 OVER ROCKY CREEK ON SR-1601 (BRANTON RD) AND BRIDGE #166 OVER ROCKY CREEK ON SR-1595 | 1 of 9 | $1,707,121 | Low, 3.0% under the second |
| 17 SEP 2019 | C204220 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #105 OVER YADKIN RIVER ON US-421 NORTH BOUND LANES. | 2 of 9 | $7,238,283 | +7.0% |
| 20 AUG 2019 | C204509 | Alexander | Express design build. 1 BRIDGE IN ALEXANDER COUNTY. | 1 of 5 | $559,097 | Low, 34% under the second |
| 16 JUL 2019 | C204405 | Madison | Replace four (4) bridges. FOUR (4) BRIDGES IN MADISON COUNTY. | 1 of 2 | $4,127,000 | Low, 0.0% under the second |
| 19 MAR 2019 | C204317 | Granville | Grading, drainage, paving, and structure. BRIDGE #40 OVER TABB'S CREEK ON US-158 (WILLIAMSBORO RD). | 3 of 6 | $1,140,468 | +8.0% |
| 02 OCT 2018 | C204222 | Rutherford, Mcdowell, Burke | Bridge replacements. 1 BRIDGE IN BURKE COUNTY, 1 BRIDGE IN MCDOWELL COUNTY, AND 3 BRIDGES IN RUTHERFORD COUNTY. | 3 of 4 | $5,328,682 | +18% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.