Apple Tuck & Associates, Inc.: NCDOT bid record
Apple Tuck & Associates, Inc. submitted 44 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 16 JAN 2024, and was the low bidder on 9 of them (20%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $19,554,590
- Latest bid
- 16 JAN 2024
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 11 | 3 | 27% |
| 2014 | 3 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 6 | 2 | 33% |
| 2017 | 3 | 0 | 0% |
| 2018 | 3 | 2 | 67% |
| 2020 | 3 | 0 | 0% |
| 2021 | 10 | 0 | 0% |
| 2022 | 2 | 1 | 50% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wilkes | 6 | 0 | 0% |
| Buncombe | 3 | 0 | 0% |
| Randolph | 3 | 2 | 67% |
| Iredell | 2 | 0 | 0% |
| Henderson | 2 | 1 | 50% |
| Rutherford | 2 | 1 | 50% |
| Stanly | 1 | 0 | 0% |
| Sampson | 1 | 0 | 0% |
| Halifax | 1 | 0 | 0% |
| Watauga | 1 | 0 | 0% |
| Avery | 1 | 0 | 0% |
| Guilford | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Additional guardrail posts | 3150000000-N | EACH | 34 | 22 (65%) | $11.00 | $13.00 |
| Seed for temporary seeding | 6018000000-E | LB | 33 | 21 (64%) | $3.00 | $3.00 |
| Asphalt binder for plant mix | 1575000000-E | TON | 34 | 20 (59%) | $534.09 | $595.00 |
| Temporary silt fence | 6000000000-E | LF | 34 | 19 (56%) | $2.50 | $2.63 |
| Fertilizer for temporary seeding | 6021000000-E | TON | 34 | 19 (56%) | $1,177.50 | $1,000.00 |
| 6" perforated subdrain pipe | 2044000000-E | LF | 29 | 19 (66%) | $2.00 | $12.00 |
| Seed for repair seeding | 6090000000-E | LB | 34 | 17 (50%) | $3.65 | $5.50 |
| Fertilizer for repair seeding | 6093000000-E | TON | 34 | 17 (50%) | $1,050.00 | $1,110.00 |
| Rip rap, class B | 3649000000-E | TON | 31 | 17 (55%) | $39.00 | $64.00 |
| Guardrail anchor units, type III | 3215000000-N | EACH | 31 | 17 (55%) | $1,500.00 | $1,600.00 |
| Temporary mulching | 6015000000-E | ACRE | 34 | 16 (47%) | $1,120.00 | $1,100.00 |
| Fertilizer topdressing | 6108000000-E | TON | 34 | 16 (47%) | $1,050.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 29 | 5 of 29 |
| R.E. Burns & Sons Co., Inc. | 23 | 11 of 23 |
| Smith-Rowe, LLC | 19 | 12 of 19 |
| James R Vannoy & Sons Construction Company Inc | 16 | 13 of 16 |
| Eastern Structures LLC | 10 | 7 of 10 |
| Dellinger, Inc. | 9 | 4 of 9 |
| NHM Constructors, LLC | 8 | 2 of 8 |
| Young & McQueen Grading Co Inc | 6 | 2 of 6 |
| S T Wooten Corporation | 6 | 3 of 6 |
| Country Boy Landscaping Inc | 6 | 3 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JAN 2024 | C204830 | Stanly | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #102 OVER LONG CREEK ON SR-1917 | 5 of 9 | $2,731,089 | +21% |
| 20 JUN 2023 | C204491 | Mitchell | Grading, drainage, paving, and structures. BRIDGE #19 OVER CUB CREEK ON NC-226. | 1 of 5 | $2,978,019 | Low, 8.0% under the second |
| 20 DEC 2022 | C204361 | Lincoln | Grading, drainage, paving, and structure. BRIDGE #7 OVER INDIAN CREEK ON NC-182. | 1 of 5 | $2,176,063 | Low, 5.0% under the second |
| 19 JUL 2022 | C204538 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #80 OVER NORTH DEEP CREEK TRIBUTARY 4B ON SR-1512. | 5 of 7 | $747,796 | +9.0% |
| 20 JUL 2021 | C204550 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #419 OVER NAKED CREEK ON SR-1148. | 4 of 5 | $751,168 | +17% |
| 20 JUL 2021 | C204628 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #4 OVER LITTLE HUNTING CREEK ON SR-2418. | 4 of 5 | $783,369 | +17% |
| 20 JUL 2021 | C204627 | Iredell | Grading, drainage, paving, and structure. BRIDGE #131 OVER SNOW CREEK ON SR-1577 (PISGAH RIDGE CIR). | 4 of 8 | $639,338 | +15% |
| 18 MAY 2021 | C204476 | Onslow | Grading, drainage, paving & structure. BRIDGE #31 OVER SANDY RUN SWAMP ON NC-50. | 3 of 7 | $1,721,645 | +15% |
| 18 MAY 2021 | C204407 | Burke, Buncombe | Replace two (2) bridges with culverts. BRIDGE 237 OVER ROCK CREEK ON SR-1913 AND BRIDGE 536 OVER NEWFOUND CREEK ON SR-1296. | 2 of 3 | $1,744,200 | +15% |
| 16 MAR 2021 | C204521 | Pitt | Grading, drainage, paving, and structure. BRIDGE #109 OVER GRINDLE CREEK ON SR-1514 (STATON MILL RD). | 8 of 10 | $1,077,311 | +15% |
| 16 FEB 2021 | C204386 | Buncombe | Grading, drainage, paving, and structure. BRIDGE #79 OVER BROAD RIVER ON NC-9. | 5 of 6 | $1,344,346 | +35% |
| 19 JAN 2021 | C204524 | Sampson | Grading, drainage, paving, and structure. BRIDGE #348 OVER BEAVERDAM CREEK ON SR-1703 (OLD GOLDSBORO RD). | 6 of 12 | $693,235 | +10% |
| 19 JAN 2021 | C204531 | Halifax | Grading, drainage, paving, and structure. BRIDGE # 115 OVER ROCKY SWAMP ON SR-1601. | 6 of 9 | $834,958 | +21% |
| 19 JAN 2021 | C204487 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #667 OVER SPARKS CREEK ON SR-1749. | 4 of 8 | $1,259,958 | +13% |
| 15 DEC 2020 | C204486 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #166 OVER WEST PRONG ROARING RIVER ON SR-1745. | 3 of 9 | $987,749 | +7.0% |
| 15 DEC 2020 | C204494 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #663 OVER EAST PRONG ROARING RIVER ON SR-1002. | 2 of 8 | $1,831,542 | +3.0% |
| 15 DEC 2020 | C204516 | Iredell | Grading, drainage, paving, and structures. BRIDGE #165 OVER ROCKY CREEK ON SR-1601 (BRANTON RD) AND BRIDGE #166 OVER ROCKY CREEK ON SR-1595 | 4 of 9 | $1,804,552 | +6.0% |
| 02 OCT 2018 | C204222 | Rutherford, Mcdowell, Burke | Bridge replacements. 1 BRIDGE IN BURKE COUNTY, 1 BRIDGE IN MCDOWELL COUNTY, AND 3 BRIDGES IN RUTHERFORD COUNTY. | 1 of 4 | $4,497,947 | Low, 17% under the second |
| 21 AUG 2018 | C204221 | Mitchell, Buncombe | Bridge replacements. 3 BRIDGES IN BUNCOMBE COUNTY AND 1 BRIDGE IN MITCHELL COUNTY | 2 of 4 | $3,252,670 | +8.0% |
| 15 MAY 2018 | C204079 | Polk | Grading, drainage, paving, signing, and structure. BRIDGE #34 OVER WALNUT CREEK ON SR-1311. | 1 of 8 | $722,700 | Low, 3.0% under the second |
| 16 MAY 2017 | C204006 | Alleghany, Surry, Ashe | Express design build. REPLACEMENT OF 1 BRIDGE IN ALLEGHANY COUNTY , 2 BRIDGES IN ASHE COUNTY AND 1 BRIDGE IN SURRY COUNTY. | 3 of 5 | $3,269,000 | +18% |
| 16 MAY 2017 | C204007 | Avery, Watauga, Caldwell | Express design build. REPLACEMENT OF 3 BRIDGES IN AVERY COUNTY , 1 BRIDGE IN CALDWELL COUNTY AND 1 BRIDGE IN WATAUGA COUNTY. | 2 of 5 | $4,480,000 | +10% |
| 21 MAR 2017 | C203847 | Rutherford | Grading, drainage, paving, and structure. BRIDGE #51 OVER FLOYDS CREEK ON SR-2213. | 2 of 8 | $871,091 | +5.0% |
| 20 DEC 2016 | C203827 | Burke | Grading, drainage, paving, and structure. BRIDGE #21 OVER HENRY FORK RIVER ON SR-1803 (JOHNSON BRIDGE ROAD). | 3 of 7 | $1,337,878 | +5.0% |
| 18 OCT 2016 | C203805 | Randolph | Grading, drainage, paving & structures. BRIDGE #374 OVER SANDY CRK ON SR-2481(LOW BRIDGE RD); BRIDGE #307 OVER MOUNT PLEASANT CRK ON SR-248 | 1 of 11 | $2,582,927 | Low, 3.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.