James R Vannoy & Sons Construction Company Inc: NCDOT bid record
James R Vannoy & Sons Construction Company Inc submitted 68 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 15 SEP 2026, and was the low bidder on 25 of them (37%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $184,531,742
- Latest bid
- 15 SEP 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 12 | 3 | 25% |
| 2014 | 9 | 4 | 44% |
| 2015 | 3 | 2 | 67% |
| 2016 | 7 | 3 | 43% |
| 2017 | 9 | 5 | 56% |
| 2018 | 4 | 2 | 50% |
| 2019 | 4 | 0 | 0% |
| 2020 | 4 | 3 | 75% |
| 2021 | 7 | 1 | 14% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 1 | 100% |
| 2025 | 2 | 0 | 0% |
| 2026 | 4 | 1 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wilkes | 15 | 6 | 40% |
| Ashe | 9 | 6 | 67% |
| Caldwell | 4 | 1 | 25% |
| Watauga | 4 | 1 | 25% |
| Avery | 3 | 1 | 33% |
| Alleghany | 3 | 2 | 67% |
| Yadkin | 3 | 1 | 33% |
| Catawba | 2 | 0 | 0% |
| Iredell | 2 | 0 | 0% |
| Watauga, Ashe | 2 | 1 | 50% |
| Alexander | 2 | 0 | 0% |
| Avery, Watauga | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Shallow undercut | 1099500000-E | CY | 43 | 18 (42%) | $12.00 | $18.35 |
| Drums | 4430000000-N | EACH | 40 | 18 (45%) | $42.00 | $50.00 |
| Geotextile for soil stabilization | 0196000000-E | SY | 43 | 16 (37%) | $2.11 | $2.50 |
| Foundation conditioning material, minor structures | 0318000000-E | TON | 41 | 16 (39%) | $35.00 | $42.00 |
| Response for erosion control | 6117000000-N | EACH | 34 | 16 (47%) | $80.63 | $150.00 |
| Reinforcing steel (bridge) | 8217000000-E | LB | 34 | 15 (44%) | $1.10 | $1.25 |
| Geotextile for drainage | 8622000000-E | SY | 29 | 15 (52%) | $2.20 | $3.00 |
| Incidental stone base | 1220000000-E | TON | 43 | 14 (33%) | $30.52 | $40.00 |
| 6" perforated subdrain pipe | 2044000000-E | LF | 41 | 14 (34%) | $5.57 | $12.00 |
| Rip rap, class B | 3649000000-E | TON | 38 | 14 (37%) | $41.70 | $64.00 |
| Frame with two grates, STD 840.29 | 2367000000-N | EACH | 32 | 14 (44%) | $568.44 | $687.50 |
| Seed for supplemental seeding | 6096000000-E | LB | 44 | 13 (30%) | $3.41 | $4.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Smith-Rowe, LLC | 28 | 15 of 28 |
| Dane Construction, Inc. | 26 | 6 of 26 |
| Apple Tuck & Associates, Inc. | 16 | 3 of 16 |
| R.E. Burns & Sons Co., Inc. | 16 | 12 of 16 |
| Crowder Construction Company | 12 | 2 of 12 |
| Blythe Development Co. | 10 | 5 of 10 |
| Young & McQueen Grading Co Inc | 9 | 2 of 9 |
| Vecellio & Grogan Inc | 9 | 4 of 9 |
| W C English Incorporated | 9 | 3 of 9 |
| NHM Constructors, LLC | 8 | 1 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 SEP 2026 | C205214 | Wilkes | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #960029 OVER CUB CREEK ON SR-1001 (OAKW | 1 of 5 | $6,489,104 | Low, 5.0% under the second |
| 15 SEP 2026 | C204947 | Caldwell | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND WALL. INTERSECTIONS ON US-321 WITH SR-1160 (MOUNT HERMAN RD | 2 of 3 | $29,977,842 | +17% |
| 18 AUG 2026 | C205195 | Catawba | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERCHANGE AT I-40 AND SR-1007 (LENOIR RHYNE BOULEVARD) | 2 of 4 | $14,578,799 | +6.0% |
| 18 AUG 2026 | C204504 | Watauga | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. SR-1523 (WILSON RIDGE RD)/SR-1514 (BAMBOO RD) FROM SR-1522 (DEERFIELD RD) TO US-421/US-2 | 3 of 3 | $52,398,770 | +19% |
| 16 DEC 2025 | C205010 | Wilkes | BRIDGE PRESERVATION. BRIDGE #960068 OVER WARRIOR CREEK ON NC-268 | 5 of 5 | $3,029,644 | +67% |
| 15 APR 2025 | C204567 | Ashe | BRIDGE PRESERVATION. BRIDGES #040032 ON NC-194, #040507 ON SR-1644, #040478 ON SR-1514, AND #040019 ON NC-194 | 7 of 8 | $8,001,061 | +39% |
| 28 MAY 2024 | C204844 | Caldwell | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALL. SR-1109 (PINEWOOD ROAD) FROM US-321 TO SR-1 | 1 of 1 | $11,480,141 | Low |
| 21 NOV 2023 | C204471 | Wilkes | Grading, drainage, paving, signals and structures., grading, drainage, paving, signals, and structures. US-421 FROM EAST OF NC-16 TO US-421 | 2 of 2 | $81,293,350 | 0.0% |
| 19 JUL 2022 | C204538 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #80 OVER NORTH DEEP CREEK TRIBUTARY 4B ON SR-1512. | 6 of 7 | $755,160 | +10% |
| 16 NOV 2021 | C204355 | Watauga | Grading, drainage, paving, signals, and structure. BRIDGE OVER WATAUGA RIVER AND LEFT TURN LANE AT SR-1112 (BROADSTONE RD) ON NC-105 WITHIN | 2 of 3 | $22,644,950 | +12% |
| 16 NOV 2021 | C204682 | Ashe | Grading, drainage, paving, and structure. BRIDGE #40008 ON NC-194 OVER NORTH FORK NEW RIVER. | 1 of 2 | $8,279,727 | Low, 5.0% under the second |
| 20 JUL 2021 | C204550 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #419 OVER NAKED CREEK ON SR-1148. | 2 of 5 | $671,909 | +5.0% |
| 20 JUL 2021 | C204628 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #4 OVER LITTLE HUNTING CREEK ON SR-2418. | 2 of 5 | $764,311 | +14% |
| 20 JUL 2021 | C204627 | Iredell | Grading, drainage, paving, and structure. BRIDGE #131 OVER SNOW CREEK ON SR-1577 (PISGAH RIDGE CIR). | 7 of 8 | $675,609 | +22% |
| 20 APR 2021 | C204611 | Wilkes, Alleghany | Bridge replacements. 3 BRIDGES IN ALLEGHANY AND WILKES COUNTIES. | 2 of 4 | $4,518,665 | +10% |
| 19 JAN 2021 | C204487 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #667 OVER SPARKS CREEK ON SR-1749. | 3 of 8 | $1,215,026 | +9.0% |
| 15 DEC 2020 | C204486 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #166 OVER WEST PRONG ROARING RIVER ON SR-1745. | 1 of 9 | $921,190 | Low, 7.0% under the second |
| 15 DEC 2020 | C204494 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #663 OVER EAST PRONG ROARING RIVER ON SR-1002. | 1 of 8 | $1,781,758 | Low, 3.0% under the second |
| 15 DEC 2020 | C204516 | Iredell | Grading, drainage, paving, and structures. BRIDGE #165 OVER ROCKY CREEK ON SR-1601 (BRANTON RD) AND BRIDGE #166 OVER ROCKY CREEK ON SR-1595 | 3 of 9 | $1,794,762 | +5.0% |
| 17 MAR 2020 | C204356 | Ashe | Widening, grading, drainage, paving, signals, and culverts. US-221 FROM US-221 BYPASS TO US-221 BUSINESS/NC-88 IN JEFFERSON. | 1 of 4 | $27,409,544 | Low, 13% under the second |
| 17 SEP 2019 | C204220 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #105 OVER YADKIN RIVER ON US-421 NORTH BOUND LANES. | 7 of 9 | $8,184,939 | +21% |
| 20 AUG 2019 | C204509 | Alexander | Express design build. 1 BRIDGE IN ALEXANDER COUNTY. | 3 of 5 | $749,038 | +34% |
| 19 FEB 2019 | C204231 | Ashe | Bridge preservation. STRUCTURE #40011 ON NC-16/NC-88 OVER SOUTH FORK NEW RIVER. | 2 of 6 | $651,668 | +12% |
| 19 FEB 2019 | C204236 | Avery, Watauga | Bridge preservation. BRIDGES #4 ON US-19 OVER N TOE RIVER, #5 ON SR-1121 OVER N TOE RIVER, AND #3 ON SR-1557 OVER WATAUGA RIVER. | 3 of 4 | $2,830,253 | +61% |
| 18 DEC 2018 | C204255 | Alleghany | Grading, drainage, paving, and structure. BRIDGE #21 OVER LITTLE RIVER ON NC-18. | 1 of 8 | $4,844,300 | Low, 8.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.