NHM Constructors, LLC: NCDOT bid record
NHM Constructors, LLC submitted 106 bids on North Carolina DOT contracts in the data, from 16 APR 2013 to 18 AUG 2026, and was the low bidder on 18 of them (17%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $103,442,258
- Latest bid
- 18 AUG 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 13 | 3 | 23% |
| 2014 | 13 | 6 | 46% |
| 2015 | 10 | 2 | 20% |
| 2016 | 9 | 2 | 22% |
| 2017 | 6 | 0 | 0% |
| 2018 | 17 | 1 | 6% |
| 2019 | 2 | 1 | 50% |
| 2021 | 4 | 1 | 25% |
| 2022 | 4 | 0 | 0% |
| 2023 | 7 | 0 | 0% |
| 2024 | 6 | 1 | 17% |
| 2025 | 13 | 1 | 8% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Buncombe | 12 | 4 | 33% |
| Transylvania | 11 | 1 | 9% |
| Haywood | 10 | 2 | 20% |
| Henderson | 9 | 3 | 33% |
| Rutherford | 7 | 1 | 14% |
| Jackson | 6 | 3 | 50% |
| Mcdowell | 6 | 0 | 0% |
| Macon | 6 | 1 | 17% |
| Cherokee | 5 | 0 | 0% |
| Burke | 5 | 1 | 20% |
| Madison | 4 | 0 | 0% |
| Yancey | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Matting for erosion control | 6036000000-E | SY | 83 | 36 (43%) | $1.80 | $1.75 |
| Asphalt binder for plant mix | 1575000000-E | TON | 94 | 35 (37%) | $642.35 | $595.00 |
| Seeding and mulching | 6084000000-E | ACRE | 85 | 35 (41%) | $2,121.00 | $2,365.00 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 83 | 34 (41%) | $6.95 | $7.50 |
| Work zone signs (portable) | 4405000000-E | SF | 76 | 34 (45%) | $9.64 | $11.02 |
| Supports, 3-LB steel U-channel | 4072000000-E | LF | 66 | 34 (52%) | $5.55 | $7.00 |
| Temporary mulching | 6015000000-E | ACRE | 81 | 33 (41%) | $1,200.00 | $1,100.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 71 | 33 (46%) | $0.48 | $0.27 |
| Fertilizer for temporary seeding | 6021000000-E | TON | 80 | 32 (40%) | $1,260.50 | $1,000.00 |
| Seed for supplemental seeding | 6096000000-E | LB | 80 | 31 (39%) | $4.93 | $4.50 |
| Seed for temporary seeding | 6018000000-E | LB | 81 | 30 (37%) | $3.20 | $3.00 |
| Seed for repair seeding | 6090000000-E | LB | 80 | 30 (38%) | $5.30 | $5.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 40 | 23 of 40 |
| Buckeye Bridge LLC | 37 | 24 of 37 |
| Young & McQueen Grading Co Inc | 19 | 7 of 19 |
| Wright Brothers Construction Company Inc | 18 | 8 of 18 |
| Buchanan and Sons Inc | 16 | 11 of 16 |
| R.E. Burns & Sons Co., Inc. | 13 | 10 of 13 |
| Mountain Creek Contractors Inc | 12 | 10 of 12 |
| Tennoca Construction Co., Inc. | 12 | 6 of 12 |
| Watson Contracting Inc | 12 | 12 of 12 |
| GLF Construction Corporation | 12 | 7 of 12 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 4 of 8 | $2,190,740 | +17% |
| 18 AUG 2026 | C205070 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-120 | 6 of 9 | $8,707,560 | +23% |
| 16 DEC 2025 | C205135 | Rutherford | GRADING, DRAINAGE, AND PAVING. (EXPRESS DESIGN BUILD). INTERSECTION OF US-64/US-74A (WEST MOUNTAIN ST) AND NORTH WASHINGTON ST | 2 of 4 | $4,702,000 | +4.0% |
| 18 NOV 2025 | C205126 | Buncombe | GRADING, DRAINAGE, AND PAVING. FUTURE CONNECTOR ROAD (EAST FREDERICK LAW OLMSTEAD WAY) FROM I-26 INTERCHANGE TO ROUNDABOUT | 5 of 8 | $8,525,545 | +51% |
| 17 JUN 2025 | C205015 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | 6 of 8 | $20,359,739 | +12% |
| 18 MAR 2025 | C204766 | Madison | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #560067 OVER THE FRENCH BROAD R | 7 of 8 | $21,501,396 | +28% |
| 18 MAR 2025 | C205030 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990173 OVER MIDDLE CREEK ON SR-1159, AND BRIDGE #990156 OVER COLBERT CREEK O | 3 of 3 | $5,849,535 | +92% |
| 18 FEB 2025 | C205049 | Buncombe | DRAINAGE, PAVING, AND PAVING., DRAINAGE, PAVING, AND SIGNALS. US-19/US-23 BUS (HAYWOOD RD) FROM US-19/US-23/US-74 (PATTON AVE) TO RIDGELAWN | 2 of 2 | $8,313,031 | +19% |
| 18 FEB 2025 | C204883 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #800040 OVER NORTH FORK FIRST BROAD CREEK ON NC-226 | 2 of 6 | $6,688,028 | +20% |
| 18 FEB 2025 | C205062 | Mcdowell | ROCK EMBANKMENTS, PAVING, AND GUARDRAIL. NC-80 FROM MM 11.77 TO MM 12.16 (SITES 45, 46, 47, AND 48) | 2 of 3 | $15,573,718 | +5.0% |
| 18 FEB 2025 | C205026 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #100428 ON SR-2429, BRG #100203 ON SR-2416, BRG #100307 ON SR-2426, AND BRG #100 | 1 of 3 | $7,561,270 | Low, 11% under the second |
| 21 JAN 2025 | C205017 | Henderson | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALL. US-64 (CHIMNEY ROCK RD) FROM SR-1613 (SLICK ROCK RD, MM 22.79 | 2 of 4 | $38,437,606 | +17% |
| 21 JAN 2025 | C205057 | Haywood, Henderson | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #430062 OVER COVE CREEK ON SR-1500 AND BRIDGE #440095 OVER BRANCH BROAD RIVER | 2 of 3 | $5,469,265 | +4.0% |
| 09 JAN 2025 | C205020 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #580119 ON US-221 AND BRG #580285 ON SR-1571: BOTH OVER NORTH FORK CATAWBA RIVER | 3 of 3 | $6,973,250 | +45% |
| 09 JAN 2025 | C205021 | Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580044 OVER CURTIS CREEK ON US-70 AND BRIDGE #580090 OVER MILL CREEK ON SR-1 | 3 of 3 | $5,949,790 | +30% |
| 20 AUG 2024 | C204937 | Henderson | GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALLS. US-64 FROM SR-1180 (BLYTHE ST) TO SR-1173 (WHITE PINE DR)/SR-1186 (DANIEL DR) | 2 of 4 | $29,111,008 | +3.0% |
| 20 AUG 2024 | C204925 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430095 OVER SOUTHERN RAILROAD ON US-74 | 1 of 7 | $17,679,951 | Low, 2.0% under the second |
| 16 JUL 2024 | C204884 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. I-40 FROM 0.348 MILES WEST OF SR-1550 (INCINERATOR RD) TO 0.345 MILES EAST OF SR-1550 (INCINERATO | 2 of 4 | $24,194,391 | +4.0% |
| 16 JUL 2024 | C204865 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430243 OVER NC-215 (CHAMPION DRIVE) ON I-40 | 2 of 3 | $28,824,203 | +2.0% |
| 28 MAY 2024 | C204796 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGES #248 AND #249 OVER SR-1613 (BEAVERDAM RD) ON I-40 | 3 of 5 | $38,080,747 | +15% |
| 16 JAN 2024 | C204828 | Jackson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #32 OVER SAVANNAH CREEK ON NC-116 | 4 of 5 | $6,913,630 | +28% |
| 19 DEC 2023 | C204823 | Haywood | Grading, drainage, paving, signals, and structure. US-276 (RUSS AVE) FROM US-23/74 TO US-23 BUS (MAIN ST) IN WAYNESVILLE. | 2 of 4 | $46,583,674 | +9.0% |
| 21 NOV 2023 | C204904 | Transylvania | Grading, drainage, paving, signals, and culvert. INTERSECTIONS OF US-64 / US-276 (HENDERSONVILLE HWY), AND US-64 / NC-280 (ASHEVILLE HWY). | 2 of 4 | $22,245,056 | +9.0% |
| 17 OCT 2023 | C204488 | Cherokee | Bridge preservation. BRIDGE #190009 AND #190010 OVER NOTTELY RIVER AND GRAVEL RD ON US-64 & US-74. | 4 of 7 | $4,403,876 | +47% |
| 18 JUL 2023 | C204715 | Jackson | Grading, drainage, paving, and structure., grading, drainage, paving, bike lanes, and sidewalk. SR-1336 FROM N OF SR-1002 TO N OF SR-1337 AN | 3 of 6 | $6,534,561 | +4.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.