Buckeye Bridge LLC: NCDOT bid record
Buckeye Bridge LLC submitted 58 bids on North Carolina DOT contracts in the data, from 18 JUN 2013 to 19 MAY 2026, and was the low bidder on 18 of them (31%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $41,859,118
- Latest bid
- 19 MAY 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 7 | 2 | 29% |
| 2014 | 7 | 1 | 14% |
| 2015 | 2 | 0 | 0% |
| 2016 | 8 | 4 | 50% |
| 2017 | 2 | 0 | 0% |
| 2018 | 8 | 4 | 50% |
| 2019 | 2 | 0 | 0% |
| 2020 | 1 | 0 | 0% |
| 2021 | 4 | 2 | 50% |
| 2022 | 3 | 1 | 33% |
| 2023 | 2 | 1 | 50% |
| 2024 | 3 | 0 | 0% |
| 2025 | 8 | 3 | 38% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Jackson | 6 | 1 | 17% |
| Buncombe | 6 | 2 | 33% |
| Transylvania | 5 | 4 | 80% |
| Henderson | 4 | 2 | 50% |
| Macon | 4 | 2 | 50% |
| Cherokee | 4 | 2 | 50% |
| Haywood | 3 | 1 | 33% |
| Yancey | 3 | 1 | 33% |
| Madison | 3 | 2 | 67% |
| Ashe | 2 | 0 | 0% |
| Mitchell | 2 | 0 | 0% |
| Chatham, Moore | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Seeding and mulching | 6084000000-E | ACRE | 35 | 27 (77%) | $1,800.00 | $2,365.00 |
| Fertilizer for temporary seeding | 6021000000-E | TON | 34 | 26 (76%) | $825.00 | $1,000.00 |
| Seed for supplemental seeding | 6096000000-E | LB | 34 | 25 (74%) | $3.00 | $4.50 |
| Fertilizer topdressing | 6108000000-E | TON | 34 | 24 (71%) | $1,000.00 | $1,000.00 |
| Seed for repair seeding | 6090000000-E | LB | 34 | 23 (68%) | $3.00 | $5.50 |
| Fertilizer for repair seeding | 6093000000-E | TON | 34 | 23 (68%) | $800.00 | $1,110.00 |
| Seed for temporary seeding | 6018000000-E | LB | 34 | 23 (68%) | $3.00 | $3.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 48 | 22 (46%) | $6.72 | $7.25 |
| Temporary mulching | 6015000000-E | ACRE | 34 | 22 (65%) | $1,175.00 | $1,100.00 |
| Guardrail anchor units, type III | 3215000000-N | EACH | 26 | 22 (85%) | $1,550.00 | $1,600.00 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 39 | 20 (51%) | $6.00 | $7.50 |
| Safety fence | 6029000000-E | LF | 35 | 20 (57%) | $2.00 | $2.20 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| NHM Constructors, LLC | 37 | 13 of 37 |
| Dane Construction, Inc. | 26 | 6 of 26 |
| American Contracting & Services Inc | 15 | 8 of 15 |
| Lanford Brothers Co., Inc. | 15 | 6 of 15 |
| Mountain Creek Contractors Inc | 8 | 5 of 8 |
| R.E. Burns & Sons Co., Inc. | 8 | 3 of 8 |
| Southern Road & Bridge LLC | 8 | 1 of 8 |
| Young & McQueen Grading Co Inc | 8 | 1 of 8 |
| Owle Construction LLC | 7 | 2 of 7 |
| Simpson Construction Co., Inc. | 6 | 1 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 MAY 2026 | C205191 | Mitchell | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD). BRG #600054 ON SR-1217, BRG #600160 ON SR-1202, BRG #600178 ON SR-1210, AND BRG #60 | 3 of 3 | $9,054,700 | +28% |
| 21 OCT 2025 | C205133 | Mitchell | ROADWAY AND CULVERT. (EXPRESS DESIGN BUILD), ROADWAY AND STRUCTURE. (EXPRESS DESIGN BUILD). BRIDGE ON CANE CRK ON SR-1207, BRIDGE OVER BIG R | 2 of 3 | $6,059,250 | +6.0% |
| 15 APR 2025 | C204567 | Ashe | BRIDGE PRESERVATION. BRIDGES #040032 ON NC-194, #040507 ON SR-1644, #040478 ON SR-1514, AND #040019 ON NC-194 | 4 of 8 | $7,066,642 | +23% |
| 18 MAR 2025 | C205065 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990157 OVER ELK SHOAL CREEK ON SR-1388 AND BRIDGES #990233, #990192, AND #99 | 2 of 3 | $4,966,000 | 0.0% |
| 21 JAN 2025 | C205057 | Haywood, Henderson | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #430062 OVER COVE CREEK ON SR-1500 AND BRIDGE #440095 OVER BRANCH BROAD RIVER | 3 of 3 | $5,980,000 | +13% |
| 21 JAN 2025 | C205056 | Henderson | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #440109 OVER CLEAR CREEK ON SR-1578 (TOWNSEND RD) AND BRIDGE #440198 OVER CLE | 1 of 2 | $4,979,550 | Low, 17% under the second |
| 21 JAN 2025 | C205022 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #990047 OVER MINE FORK CREEK ON SR-1416 AND BRG #990014 OVER BANKS CREEK ON SR-1 | 1 of 2 | $3,696,600 | Low, 49% under the second |
| 09 JAN 2025 | C205031 | Buncombe, Mcdowell | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580345 OVER ARMSTRONG CREEK ON SR-1546 AND BRIDGE #100110 OVER BROAD RIVER O | 2 of 3 | $4,466,868 | +26% |
| 09 JAN 2025 | C205050 | Haywood | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #430002 ON SR-1101, BRIDGE #430034 ON SR-1505, AND BRIDGE #430219 ON SR-1306 | 1 of 3 | $5,496,567 | Low, 0.0% under the second |
| 18 JUN 2024 | C204455 | Chatham, Moore | BRIDGE PRESERVATION. BRIDGES #180007, #180477, #620049, AND #620072 OVER THE DEEP RIVER ON US-1 SOUTH, SR-1621, AND NC-22 | 5 of 6 | $7,187,998 | +12% |
| 28 MAY 2024 | C204411 | Haywood | BRIDGE #430175 OVER BIG CREEK ON SR-1332 (WATERVILLE ROAD)., GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430175 AND BRIDGE #430174 OV | 2 of 4 | $9,089,608 | +8.0% |
| 16 JAN 2024 | C204828 | Jackson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #32 OVER SAVANNAH CREEK ON NC-116 | 3 of 5 | $6,395,943 | +19% |
| 17 OCT 2023 | C204488 | Cherokee | Bridge preservation. BRIDGE #190009 AND #190010 OVER NOTTELY RIVER AND GRAVEL RD ON US-64 & US-74. | 1 of 7 | $2,989,181 | Low, 10% under the second |
| 18 JUL 2023 | C204715 | Jackson | Grading, drainage, paving, and structure., grading, drainage, paving, bike lanes, and sidewalk. SR-1336 FROM N OF SR-1002 TO N OF SR-1337 AN | 6 of 6 | $8,676,766 | +38% |
| 15 NOV 2022 | C204389 | Macon | Grading, drainage, paving, and structure. BRIDGE #26 OVER MIDDLE CREEK ON NC-106. | 2 of 3 | $5,679,736 | +7.0% |
| 17 MAY 2022 | C204709 | Madison | Drainage and bridge rehabilitation. I-26 FROM TENNESSEE STATE LINE TO MILE MARKER 9. | 1 of 5 | $7,590,025 | Low, 6.0% under the second |
| 19 APR 2022 | C204484 | Madison | Grading, drainage, paving, retaining walls, and structure. BRIDGE #84 ON NC-209 OVER MEADOW FORK CREEK. | 2 of 4 | $5,041,928 | +47% |
| 20 APR 2021 | C204387 | Cherokee | Grading, drainage, paving, and structure. BRIDGE #2 OVER SLOW CREEK ON NC-141. | 3 of 6 | $2,043,198 | +11% |
| 16 FEB 2021 | C204449 | Pender, Duplin | Bridge preservation. STRUCTURES #300433 OVER I-40 ON NC-903 AND #700219 OVER I-40 ON US-117. | 1 of 7 | $926,426 | Low, 8.0% under the second |
| 16 FEB 2021 | C204304 | Buncombe | Bridge preservation. STRUCTURES #100481 ON SR-2740 OVER I-40, #100495 ON SR-2531 OVER I-40, AND #100705 ON SR-3548 OVER RIVERSIDE DR & NSRR. | 2 of 6 | $4,729,981 | +3.0% |
| 16 FEB 2021 | C204386 | Buncombe | Grading, drainage, paving, and structure. BRIDGE #79 OVER BROAD RIVER ON NC-9. | 1 of 6 | $997,010 | Low, 10% under the second |
| 15 DEC 2020 | C204561 | Brunswick | Bridge preservation. BRIDGE #13 OVER THE INTRACOASTAL WATERWAY ON NC-904. | 2 of 8 | $3,108,020 | +11% |
| 19 MAR 2019 | C204238 | Chatham | Bridge preservation. US-64 EB OVER JORDAN LAKE STRUCTURE #180058 AND US-64 WB OVER JORDAN LAKE STRUCTURE #180059. | 3 of 7 | $1,744,704 | +7.0% |
| 19 FEB 2019 | C204231 | Ashe | Bridge preservation. STRUCTURE #40011 ON NC-16/NC-88 OVER SOUTH FORK NEW RIVER. | 5 of 6 | $999,996 | +72% |
| 18 DEC 2018 | C204234 | Gaston | Bridge preservation. SR-1118 OVER I-85 STRUCTURE # 350039. | 2 of 6 | $610,856 | +52% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.