NCDOT letting results, November 15, 2022
13 contracts let by North Carolina DOT on November 15, 2022, $91,419,257 in low bids, a median of 3 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 13
- Low bids, total
- $91,419,257
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204540 | Grading, drainage, paving, signals, and culvert. SR-1709 (CENTRAL HEIGHTS RD) AT US-13 (BERKELEY BLVD). | Wayne | 2 | Barnhill Contracting Company | $17,251,381 | $17,585,500 | +2.0% | NCDOT |
| C204345 | Grading, drainage, paving, retaining wall, and structure. GRADE SEPARATION AT SR-1625 (ROGERS LAKE RD) OVER NS/NCRR AND CLOSURE OF AT-GRADE CROSSING #724408Y IN | Cabarrus | 11 | NJR Group Inc | $16,278,564 | $18,999,895 | +17% | NCDOT |
| C204805 | Grading, drainage, paving, and signals. I-485 AT NC-16 (BROOKSHIRE BOULEVARD). | Mecklenburg | 3 | Sealand Contractors Corp | $10,569,535 | $11,242,560 | +6.0% | NCDOT |
| C204554 | Grading, drainage, paving, and structure. BRIDGE #126 OVER SMITH'S CREEK ON SR-2044 (LIGON MILL RD) IN WAKE FOREST. | Wake | 6 | FSC II LLC DBA Fred Smith Company | $9,583,308 | $9,917,078 | +3.0% | NCDOT |
| C204802 | Widening, milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-17, 1 SECTION OF NC-904, AND 4 SECTIONS OF SECONDARY ROADS. | Brunswick | 2 | S T Wooten Corporation | $6,469,879 | $6,620,098 | +2.0% | NCDOT |
| C204389 | Grading, drainage, paving, and structure. BRIDGE #26 OVER MIDDLE CREEK ON NC-106. | Macon | 3 | Mountain Creek Contractors Inc | $5,300,000 | $5,679,736 | +7.0% | NCDOT |
| C204790 | Milling, resurfacing, and shoulder reconstruction. 11 SECTIONS OF SECONDARY ROADS AND 9 SECTIONS OF NON-SYSTEM ROADS (SCHOOL PARKING LOTS). | Camden, Currituck, Pasquotank | 2 | Barnhill Contracting Company | $4,899,139 | $5,370,000 | +10% | NCDOT |
| C204799 | Milling, resurfacing, and shoulder reconstruction. 8 SECTIONS OF SECONDARY ROADS. | Forsyth | 3 | Apac - Atlantic, Inc. Thompson Arthur Division | $4,790,931 | $4,924,701 | +3.0% | NCDOT |
| C204788 | Resurfacing and shoulder reconstruction. 6 SECTIONS OF SECONDARY ROADS. | Alamance | 5 | Vecellio & Grogan Inc DBA Sharpe Brothers | $4,366,972 | $4,679,689 | +7.0% | NCDOT |
| C204801 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-461, AND 8 SECTIONS OF SECONDARY ROADS. | Hertford, Bertie | 2 | FSC II LLC DBA Fred Smith Company | $4,128,000 | $4,875,229 | +18% | NCDOT |
| C204478 | Grading, drainage, paving, and structure. BRIDGE #29 OVER THE TAR RIVER ON US-64 ALTERNATE. | Nash | 7 | FSC II LLC DBA Fred Smith Company | $3,724,693 | $4,128,000 | +11% | NCDOT |
| C204791 | Milling, and resurfacing. 2 SECTIONS OF US-1 BUS, 2 SECTIONS OF US-15-501, 2 SECTIONS OF US-1, AND 6 SECTIONS OF SECONDARY ROADS. | Lee | 3 | FSC II LLC DBA Fred Smith Company | $2,179,000 | $2,205,774 | +1.0% | NCDOT |
| C204803 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-220 AND 4 SECTIONS OF SECONDARY ROADS. | Richmond | 2 | Hudson Paving, Inc. | $1,877,855 | $1,930,416 | +3.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.