Vecellio & Grogan Inc DBA Sharpe Brothers: NCDOT bid record

Vecellio & Grogan Inc DBA Sharpe Brothers submitted 39 bids on North Carolina DOT contracts in the data, from 19 SEP 2017 to 15 SEP 2026, and was the low bidder on 12 of them (31%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
North Carolina DOT
Low bid volume
$83,548,537
Latest bid
15 SEP 2026
Data through
20 OCT 2026
39Bids
12Low bids
31Win rate, percent
+8.0%Median gap to the low bid when not low, 27 bids

By year

YearBidsLow bidsWin rate
20172150%
2018400%
2019300%
20227343%
20233267%
20249333%
20256117%
20265240%
Vecellio & Grogan Inc DBA Sharpe Brothers, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Randolph12325%
Guilford6233%
Forsyth600%
Davidson2150%
Alamance2150%
Rockingham2150%
Buncombe, Henderson200%
Guilford, Rockingham11100%
Alamance, Guilford11100%
Davidson, Randolph100%
Chatham, Lee100%
Chatham, Randolph100%
Vecellio & Grogan Inc DBA Sharpe Brothers, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Asphalt conc surface course, type S9.5B1519000000-ETON3218 (56%)$55.41$63.50
Shoulder reconstruction1245000000-ESMI2513 (52%)$2,301.04$2,670.00
Ast, mat coat, #*** stone - (#67)1775500000-ESY1311 (85%)$0.57$1.20
Pipe removal0995000000-ELF128 (67%)$9.13$20.00
Incidental stone base1220000000-ETON237 (30%)$40.38$40.00
Patching existing pavement1704000000-ETON256 (24%)$153.64$125.00
Undercut excavation0036000000-ECY116 (55%)$8.42$15.00
Frame with cover, STD 840.542396000000-NEACH116 (55%)$363.42$670.00
Class A concrete (bridge)8182000000-ECY96 (67%)$725.00$1,100.00
Frame with two grates, STD 840.162364000000-NEACH96 (67%)$472.37$817.50
Asphalt surface treatment, mat coat, #78M stone1775000000-ESY66 (100%)$0.42$1.00
Asphalt conc surface course, type S9.5C1523000000-ETON215 (24%)$59.57$64.72
Vecellio & Grogan Inc DBA Sharpe Brothers, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Vecellio & Grogan Inc DBA Sharpe Brothers, NCDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 SEP 2026C205234RockinghamMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-704, 1 SECTION OF NC-14, 1 SECTION OF US-158, AND 6 SECTIONS OF SECONDARY2 of 3$7,615,873+8.0%
15 SEP 2026C204990RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS7 of 9$9,361,775+12%
16 JUN 2026C205157RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI8 of 11$14,850,511+20%
19 MAY 2026C205197RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS, AND 1 SECTION OF NC-491 of 5$5,769,452Low, 0.0% under the second
21 APR 2026C205193RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDA1 of 5$5,736,346Low, 3.0% under the second
21 OCT 2025C205143DavidsonMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 16 SECTIONS OF SECONDARY ROADS2 of 3$7,014,239+11%
21 OCT 2025C205142ForsythMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158, 1 SECTION OF NC-66, AND 15 SECTIONS OF SECONDARY ROADS2 of 2$10,578,938+21%
15 JUL 2025C205114RockinghamMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS1 of 1$6,850,869Low
20 MAY 2025C205102RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64, 2 SECTIONS OF NC-22, AND 1 SECTION OF NC-425 of 5$4,638,430+16%
20 MAY 2025C205087RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 13 SECTIONS OF SECONDARY ROADS2 of 3$4,061,769+11%
20 MAY 2025C205089RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS2 of 5$3,768,471+2.0%
17 DEC 2024C205003AlamanceMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 15 SECTIONS OF SECONDARY ROADS2 of 5$4,657,351+5.0%
15 OCT 2024C204986DavidsonMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-109, AND 7 SECTIONS OF SECONDARY ROADS1 of 4$7,057,484Low, 2.0% under the second
15 OCT 2024C204985ForsythMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF OF US-158, AND 5 SECTIONS OF SECONDARY ROADS2 of 2$7,368,260+8.0%
28 MAY 2024C204959Alamance, GuilfordMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 29 SECTIONS OF SECONDARY ROADS1 of 4$5,067,692Low, 0.0% under the second
28 MAY 2024C204908GuilfordGRADING, DRAINAGE, AND PAVING. RAILWAY-HIGHWAY CROSSING CLOSURE AT PINE STREET AND NORFOLK SOUTHERN CROSSING 722 957-L3 of 3$5,632,425+15%
19 MAR 2024C204928Guilford, RockinghamMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-62 AND 39 SECTIONS OF SECONDARY ROADS1 of 3$5,794,919Low, 4.0% under the second
19 MAR 2024C204916RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 8 SECTIONS OF SECONDARY ROADS3 of 5$3,216,051+3.0%
20 FEB 2024C204915RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-42, NC-42 SOUTH, NC-22, AND 13 SECTIONS OF SECONDARY ROADS3 of 5$4,678,925+8.0%
20 FEB 2024C204492RandolphRESURFACING AND SHOULDER RECONSTRUCTION. 6 SECTIONS OF SECONDARY ROADS2 of 5$2,292,558+6.0%
18 APR 2023C204736GuilfordPavement rehabilitation. I-40 FROM BUFFALO CREEK BRIDGE EAST OF US-220 TO EAST OF SR-3037/SR-4240 (GATE CITY BLVD) IN GREENSBORO.1 of 3$11,499,384Low, 9.0% under the second
21 FEB 2023C204849RandolphMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-49 AND 19 SECTIONS OF SECONDARY ROADS.1 of 4$4,856,004Low, 5.0% under the second
21 FEB 2023C204858RandolphMilling, resurfacing, and shoulder reconstruction. 10 SECTIONS OF SECONDARY ROADS.2 of 4$3,413,377+1.0%
20 DEC 2022C204809Chatham, RandolphMilling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-421.2 of 5$6,264,1800.0%
20 DEC 2022C204808ChathamShoulder reconstruction, milling, and resurfacing. 4 SECTIONS OF SECONDARY ROADS.1 of 4$2,157,118Low, 1.0% under the second
Vecellio & Grogan Inc DBA Sharpe Brothers: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way