Triangle Grading & Paving Inc: NCDOT bid record
Triangle Grading & Paving Inc submitted 72 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 15 SEP 2026, and was the low bidder on 9 of them (13%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $90,761,374
- Latest bid
- 15 SEP 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 15 | 3 | 20% |
| 2014 | 9 | 1 | 11% |
| 2015 | 1 | 0 | 0% |
| 2016 | 6 | 0 | 0% |
| 2017 | 8 | 1 | 13% |
| 2018 | 6 | 1 | 17% |
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 2 | 0 | 0% |
| 2025 | 7 | 1 | 14% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Guilford | 9 | 3 | 33% |
| Forsyth | 7 | 1 | 14% |
| Alamance | 6 | 1 | 17% |
| Cabarrus | 5 | 0 | 0% |
| Chatham | 4 | 0 | 0% |
| Wake | 4 | 0 | 0% |
| Randolph | 3 | 0 | 0% |
| Wilkes | 3 | 0 | 0% |
| Rockingham | 2 | 0 | 0% |
| Davidson | 2 | 1 | 50% |
| Johnston | 2 | 0 | 0% |
| Moore | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 52 | 33 (63%) | $0.69 | $0.75 |
| Temporary silt fence | 6000000000-E | LF | 64 | 29 (45%) | $2.00 | $2.63 |
| Work zone signs (stationary) | 4400000000-E | SF | 62 | 29 (47%) | $6.50 | $7.25 |
| Sign erection, type E | 4102000000-N | EACH | 52 | 28 (54%) | $65.00 | $82.00 |
| Seed for repair seeding | 6090000000-E | LB | 62 | 27 (44%) | $5.00 | $5.50 |
| Additional guardrail posts | 3150000000-N | EACH | 53 | 27 (51%) | $18.00 | $13.00 |
| Masonry drainage structures | 2286000000-N | EACH | 60 | 26 (43%) | $1,700.00 | $2,100.00 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 59 | 26 (44%) | $6.50 | $7.50 |
| Disposal of sign system, U-channel | 4155000000-N | EACH | 49 | 26 (53%) | $5.00 | $5.00 |
| Barricades (type III) | 4445000000-E | LF | 59 | 25 (42%) | $21.00 | $24.30 |
| Supports, 3-LB steel U-channel | 4072000000-E | LF | 51 | 25 (49%) | $5.75 | $7.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 41 | 25 (61%) | $2.00 | $2.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 28 | 8 of 28 |
| FSC II LLC DBA Fred Smith Company | 25 | 15 of 25 |
| S T Wooten Corporation | 19 | 9 of 19 |
| W C English Incorporated | 19 | 9 of 19 |
| Smith-Rowe, LLC | 18 | 13 of 18 |
| Branch Civil Inc | 17 | 10 of 17 |
| Dane Construction, Inc. | 15 | 7 of 15 |
| Barnhill Contracting Company | 14 | 10 of 14 |
| Blythe Development Co. | 14 | 6 of 14 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 11 | 8 of 11 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 SEP 2026 | C204990 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS | 2 of 9 | $8,379,657 | 0.0% |
| 18 AUG 2026 | C205202 | Guilford | BRIDGE PRESERVATION., GRADING, DRAINAGE, PAVING, AND CULVERT. BRIDGE #400052 OVER DEEP RIVER TRIBUTARY 1 ON SR-1332 (SCIENTIFIC ST) | 1 of 5 | $5,089,693 | Low, 1.0% under the second |
| 16 JUN 2026 | C205186 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS | 4 of 6 | $12,977,263 | +6.0% |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 4 of 11 | $13,696,285 | +10% |
| 17 FEB 2026 | C205152 | Forsyth | BRIDGE PRESERVATION. BRIDGE #330078 OVER I-40 ON US-52/US-311/NC-8 | 7 of 8 | $1,488,369 | +141% |
| 17 FEB 2026 | C205098 | Davidson, Forsyth | PAVEMENT REHABILITATION. I-285/US-52/NC-8 FROM SR-3010 (OLD US-52) TO SR-4205 (S MAIN ST) | 5 of 6 | $12,186,934 | +71% |
| 21 OCT 2025 | C205093 | Davie | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40 | 5 of 10 | $36,991,776 | +15% |
| 15 JUL 2025 | C205074 | Forsyth | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-65 (BETHANIA-RURAL HALL RD) FROM US-52 TO SR-3983 (NORTHRIDGE PARK DR) | 3 of 7 | $12,769,637 | +3.0% |
| 17 JUN 2025 | C204798 | Guilford | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND BRIDGE PRESERVATION. NC-62 FROM SR-1154 (KERSEY VALLEY RD) | 1 of 4 | $18,699,763 | Low, 15% under the second |
| 17 JUN 2025 | C205041 | Forsyth | GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY) | 2 of 8 | $13,504,148 | 0.0% |
| 20 MAY 2025 | C205032 | Chatham | DRAINAGE, GRADING, PAVING, SIGNALS, AND STRUCTURES. SR-2700 (CHATHAM PARK WAY) FROM US-15/US-501 SOUTH OF PITTSBORO TO US-64 BUSINESS | 6 of 12 | $43,390,059 | +10% |
| 18 MAR 2025 | C204933 | Chatham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. CHATHAM PARKWAY FROM NORTH OF PROPOSED GRANT DRIVE TO US-15/US-501 | 2 of 12 | $14,946,300 | +1.0% |
| 18 FEB 2025 | C204980 | Forsyth | GRADING, DRAINAGE, PAVING, AND WALLS. GREAT WAGON ROAD FROM SR-1001 (SHALLOWFORD ROAD) TO SR-1308 (LEWISVILLE-VIENNA ROAD) | 3 of 7 | $22,483,629 | +14% |
| 28 MAY 2024 | C204908 | Guilford | GRADING, DRAINAGE, AND PAVING. RAILWAY-HIGHWAY CROSSING CLOSURE AT PINE STREET AND NORFOLK SOUTHERN CROSSING 722 957-L | 2 of 3 | $5,369,623 | +9.0% |
| 16 APR 2024 | C204922 | Chatham | GRADING, DRAINGE, AND PAVING. SR-2700 FROM EXISTING SR-1809 TO NEW SR-1809, AND SR-1809 FROM WEST OF SR-2700 TO NEW INTERSECTION WITH SR-270 | 2 of 6 | $5,339,262 | +5.0% |
| 21 NOV 2023 | C204880 | Forsyth | Grading, drainage, paving, signals, and culverts. NEW ROAD WITH BICYCLE/PEDESTRIAN ACCOMMODATIONS FROM SR-1969 (PINEY GROVE ROAD) TO NC-150 | 1 of 8 | $10,745,693 | Low, 9.0% under the second |
| 17 OCT 2023 | C204895 | Chatham | Grading, drainage, and paving. WOLFSPEED - ROADWAY IMPROVEMENTS AND CONSTRUCTION OF INDUSTRIAL ACCESS ROADS ALONG US 64 JUST WEST OF SILER C | 2 of 6 | $6,496,345 | +2.0% |
| 21 JUN 2022 | C204710 | Moore | Clearing, grubbing, and erosion control. NC-211 FROM SOUTH OF NC-73 IN WEST END TO NORTH OF SR-1241 (HOLLY GROVE SCHOOL ROAD). | 2 of 2 | $5,689,375 | +21% |
| 19 APR 2022 | C204572 | Alamance | Grading, drainage, paving, signals, and culvert. US-70 AT SR-1226/SR-1311 IN BURLINGTON. | 2 of 3 | $14,369,186 | +3.0% |
| 15 MAR 2022 | C204452 | Mecklenburg, Gaston | Bridge preservation. STRS #86 OVER I-85 ON US-74 EBL, #46 & #314 OVER I-85 ON US-29 SB & US-74 WB, AND #66 OVER CATAWBA RIVER ON NC-27. | 3 of 3 | $4,996,462 | +19% |
| 18 JAN 2022 | C204692 | Moore | Grading, drainage, paving, and culvert. BRIDGE #24 OVER NICK'S CREEK ON NC-22. | 2 of 4 | $3,636,900 | +4.0% |
| 19 OCT 2021 | C204303 | Rockingham | Bridge preservation. STRUCTURE #780132 ON US-311/NC-14/NC-87/NC-770 OVER DAN RIVER. | 2 of 5 | $1,469,394 | +24% |
| 20 JUL 2021 | C204550 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #419 OVER NAKED CREEK ON SR-1148. | 5 of 5 | $1,156,319 | +81% |
| 20 JUL 2021 | C204628 | Wilkes | Grading, drainage, paving, and structure. BRIDGE #4 OVER LITTLE HUNTING CREEK ON SR-2418. | 5 of 5 | $1,253,370 | +88% |
| 20 JUL 2021 | C204627 | Iredell | Grading, drainage, paving, and structure. BRIDGE #131 OVER SNOW CREEK ON SR-1577 (PISGAH RIDGE CIR). | 8 of 8 | $1,031,369 | +86% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.