NCDOT contract C204990 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS. Let by North Carolina DOT on September 15, 2026, Randolph. 9 bids received; low bid $8,375,966 by Apac - Atlantic, Inc. Thompson Arthur Division.
- Owner
- North Carolina DOT
- Letting
- 15 SEP 2026
- Pay items
- 190
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Apac - Atlantic, Inc. Thompson Arthur Division | $8,375,966 | Low |
| 2 | Triangle Grading & Paving Inc | $8,379,657 | 0.0% |
| 3 | Ace Avant Concrete Construction Co Inc | $8,454,056 | +1.0% |
| 4 | FSC II LLC DBA Fred Smith Company | $9,029,900 | +8.0% |
| 5 | Branch Civil Inc | $9,043,850 | +8.0% |
| 6 | NJR Group Inc | $9,215,703 | +10% |
| 7 | Vecellio & Grogan Inc DBA Sharpe Brothers | $9,361,775 | +12% |
| 8 | Caton Construction Group Inc | $9,749,124 | +16% |
| 9 | J. T. Russell & Sons, Inc. | $10,556,579 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Apac - Atlantic, Inc. Thompson Arthur Division | 2. Triangle Grading & Paving Inc | 3. Ace Avant Concrete Construction Co Inc | 4. FSC II LLC DBA Fred Smith Company | 5. Branch Civil Inc | 6. NJR Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $415,000 | $410,000 | $414,893 | $450,000 | $269,259 | $460,000 |
| 0002 | Generic miscellaneous item (day) - railroad contractor protective services (0000820000-N) | DAY | 120 | $1,500.00 | $2,200.00 | $1,932.00 | $1,500.00 | $1,830.00 | $3,000.00 |
| 0003 | Sealing abandoned wells (0015000000-N) | EACH | 1 | $3,000.00 | $3,500.00 | $6,577.00 | $2,975.00 | $5,764.50 | $10,000 |
| 0004 | Grading (0043000000-N) | LS | 1 | $1,623,000 | $1,681,900 | $700,000 | $1,737,000 | $1,278,500 | $1,005,083 |
| 0005 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1.00 | $1.00 | $17,312 | $1.00 | $26,000 | $10,000 |
| 0006 | Undercut excavation (0057000000-E) | CY | 1,100 | $27.79 | $60.00 | $47.20 | $25.00 | $20.80 | $55.00 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 1,348 | $25.98 | $17.00 | $16.58 | $12.00 | $20.00 | $38.00 |
| 0008 | Select granular material (0195000000-E) | CY | 1,100 | $75.14 | $45.00 | $94.53 | $25.00 | $88.80 | $48.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 1,100 | $5.16 | $5.00 | $5.50 | $4.00 | $4.00 | $5.00 |
| 0010 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 150 | $112.24 | $80.00 | $500.00 | $50.00 | $89.00 | $1.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 454 | $80.17 | $52.00 | $81.00 | $45.00 | $88.00 | $1.00 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 780 | $5.73 | $5.00 | $5.50 | $3.00 | $5.55 | $1.00 |
| 0013 | 15" drainage pipe (0335200000-E) | LF | 1,004 | $94.37 | $110.00 | $74.32 | $105.00 | $87.75 | $90.00 |
| 0014 | 18" drainage pipe (0335300000-E) | LF | 212 | $103.09 | $120.00 | $80.14 | $105.00 | $104.25 | $125.00 |
| 0015 | 36" drainage pipe (0335600000-E) | LF | 24 | $276.42 | $195.00 | $122.54 | $200.00 | $251.25 | $175.00 |
| 0016 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 92 | $121.02 | $145.00 | $105.00 | $160.00 | $236.75 | $135.00 |
| 0017 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 346 | $133.37 | $155.00 | $93.00 | $160.00 | $180.75 | $155.00 |
| 0018 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 96 | $175.96 | $190.00 | $138.60 | $205.00 | $309.75 | $250.00 |
| 0019 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 64 | $355.49 | $305.00 | $218.00 | $338.00 | $492.50 | $350.00 |
| 0020 | Pipe removal (0995000000-E) | LF | 1,905 | $43.50 | $25.00 | $41.20 | $35.00 | $64.85 | $35.00 |
| 0021 | Shallow undercut (1099500000-E) | CY | 2,840 | $33.73 | $27.00 | $51.40 | $40.00 | $15.50 | $10.00 |
| 0022 | Class IV subgrade stabilization (1099700000-E) | TON | 5,510 | $44.59 | $41.00 | $89.72 | $50.00 | $53.75 | $50.00 |
| 0023 | Geotextile for subgrade stabilization (1112000000-E) | SY | 5,680 | $5.93 | $5.00 | $5.50 | $4.00 | $5.55 | $5.00 |
| 0024 | Aggregate base course (1121000000-E) | TON | 300 | $63.36 | $45.00 | $90.00 | $75.00 | $98.70 | $60.00 |
| 0025 | Incidental stone base (1220000000-E) | TON | 200 | $70.20 | $75.00 | $90.00 | $110.00 | $73.95 | $60.00 |
| 0026 | Milln asphalt PVMT ***** - ***** - (0" to 5") (1308000000-E) | SY | 360 | $26.81 | $22.00 | $29.25 | $25.00 | $17.25 | $35.00 |
| 0027 | Incidental milling (1330000000-E) | SY | 620 | $19.20 | $22.00 | $29.25 | $20.00 | $15.75 | $38.00 |
| 0028 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 2,200 | $90.00 | $92.00 | $111.00 | $100.00 | $96.75 | $99.00 |
| 0029 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 3,000 | $90.00 | $92.00 | $111.00 | $103.00 | $96.75 | $99.00 |
| 0030 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 200 | $110.00 | $140.00 | $127.00 | $125.00 | $118.50 | $121.00 |
| 0031 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 3,400 | $87.00 | $98.00 | $102.00 | $105.00 | $93.75 | $95.70 |
| 0032 | Asphalt binder for plant mix (1575000000-E) | TON | 460 | $855.00 | $842.00 | $955.00 | $950.00 | $921.00 | $940.50 |
| 0033 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 240 | $273.37 | $255.00 | $277.00 | $190.00 | $247.00 | $200.00 |
| 0034 | Right-of-way markers (2000000000-N) | EACH | 27 | $340.00 | $290.00 | $235.00 | $340.00 | $378.00 | $327.75 |
| 0035 | Subdrain excavation (2022000000-E) | CY | 112 | $32.50 | $45.00 | $44.33 | $30.00 | $43.50 | $38.00 |
| 0036 | Geotextile for subsurface drains (2026000000-E) | SY | 500 | $7.44 | $7.00 | $5.50 | $4.00 | $15.00 | $5.00 |
| 0037 | Subdrain coarse aggregate (2036000000-E) | CY | 84 | $122.63 | $106.00 | $122.19 | $40.00 | $106.00 | $65.00 |
| 0038 | 6" perforated subdrain pipe (2044000000-E) | LF | 500 | $34.77 | $16.00 | $32.14 | $10.00 | $21.25 | $50.00 |
| 0039 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $226.30 | $700.00 | $3,188.00 | $750.00 | $505.00 | $500.00 |
| 0040 | 6" outlet pipe (2077000000-E) | LF | 6 | $63.32 | $55.00 | $51.70 | $60.00 | $49.75 | $50.00 |
| 0041 | Flowable fill (2275000000-E) | CY | 5 | $737.48 | $750.00 | $805.00 | $740.00 | $776.00 | $2,000.00 |
| 0042 | Masonry drainage structures (2286000000-N) | EACH | 9 | $4,281.86 | $3,200.00 | $3,777.00 | $5,750.00 | $4,605.00 | $6,000.00 |
| 0043 | Masonry drainage structures (2308000000-E) | LF | 6.80 | $820.30 | $575.00 | $2,093.00 | $750.00 | $546.75 | $800.00 |
| 0044 | Frame with grate, STD 840.24 (2354200000-N) | EACH | 4 | $2,807.80 | $950.00 | $1,174.00 | $1,340.00 | $4,114.25 | $1,500.00 |
| 0045 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 5 | $2,063.51 | $1,050.00 | $1,593.00 | $1,400.00 | $4,613.50 | $1,500.00 |
| 0046 | 6" concrete driveway (2612000000-E) | SY | 385 | $127.80 | $165.00 | $129.00 | $120.00 | $124.25 | $145.00 |
| 0047 | Generic paving item 852 (SY) - 6" monolithic concrete islands (keyed in) (2739000000-E) | SY | 55 | $150.00 | $115.00 | $205.00 | $175.00 | $189.25 | $275.00 |
| 0048 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $1,560.00 | $1,200.00 | $4,500.00 | $1,642.00 | $462.00 | $3,500.00 |
| 0049 | Adjustment of manholes (2830000000-N) | EACH | 11 | $1,560.00 | $1,200.00 | $2,156.00 | $1,600.00 | $462.00 | $1,500.00 |
| 0050 | Steel beam guardrail (3030000000-E) | LF | 350 | $27.00 | $26.00 | $56.19 | $26.00 | $29.00 | $29.90 |
| 0051 | Steel beam guardrail, shop curved (3045000000-E) | LF | 12.50 | $26.50 | $30.00 | $50.35 | $30.00 | $33.50 | $34.50 |
| 0052 | Additional guardrail posts (3150000000-N) | EACH | 5 | $1.00 | $55.00 | $58.53 | $55.00 | $61.15 | $63.25 |
| 0053 | Guardrail end units, type at-1 (3195000000-N) | EACH | 1 | $900.00 | $900.00 | $2,576.00 | $900.00 | $1,000.50 | $1,035.00 |
| 0054 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 3 | $3,150.00 | $3,100.00 | $9,130.72 | $3,100.00 | $3,446.25 | $3,565.00 |
| 0055 | Rip rap, class I (3628000000-E) | TON | 55 | $109.78 | $75.00 | $85.50 | $120.00 | $141.50 | $70.00 |
| 0056 | Rip rap, class II (3635000000-E) | TON | 115 | $157.18 | $70.00 | $101.50 | $122.00 | $180.00 | $70.00 |
| 0057 | Rip rap, class B (3649000000-E) | TON | 20 | $106.26 | $65.00 | $84.00 | $160.00 | $178.00 | $70.00 |
| 0058 | Geotextile for drainage (3656000000-E) | SY | 1,320 | $6.69 | $5.00 | $5.50 | $2.00 | $3.55 | $5.00 |
| 0059 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 339 | $9.63 | $7.00 | $9.50 | $9.00 | $10.60 | $10.35 |
| 0060 | Sign erection, type E (4102000000-N) | EACH | 37 | $211.86 | $80.00 | $93.65 | $198.00 | $233.00 | $227.70 |
| 0061 | Disposal of sign system, U-channel (4155000000-N) | EACH | 15 | $53.50 | $25.00 | $150.00 | $50.00 | $58.85 | $57.50 |
| 0062 | Work zone signs (stationary) (4400000000-E) | SF | 797 | $8.83 | $12.50 | $7.32 | $9.00 | $14.15 | $9.49 |
| 0063 | Work zone signs (portable) (4405000000-E) | SF | 192 | $10.70 | $18.00 | $20.50 | $30.00 | $18.30 | $11.50 |
| 0064 | Work zone signs (barricade mounted) (4410000000-E) | SF | 213 | $8.83 | $12.50 | $8.20 | $9.00 | $13.60 | $9.49 |
| 0065 | Portable changeable message sign (4420000000-N) | EACH | 7 | $6,208.66 | $5,000.00 | $5,250.00 | $3,000.00 | $5,773.25 | $4,025.00 |
| 0066 | Drums (4430000000-N) | EACH | 300 | $82.07 | $85.00 | $70.00 | $45.00 | $37.95 | $52.90 |
| 0067 | Barricades (type III) (4445000000-E) | LF | 200 | $22.47 | $36.00 | $34.00 | $21.00 | $34.65 | $24.15 |
| 0068 | Flagger (4455000000-N) | DAY | 810 | $403.01 | $425.00 | $485.00 | $575.00 | $710.00 | $600.00 |
| 0069 | Water filled barrier (4507000000-E) | LF | 56 | $81.65 | $108.00 | $166.00 | $105.00 | $49.50 | $34.50 |
| 0070 | Law enforcement (4510000000-N) | HR | 40 | $80.00 | $110.00 | $83.00 | $95.00 | $111.25 | $95.00 |
| 0071 | Tubular markers (fixed) (4520000000-N) | EACH | 20 | $240.75 | $150.00 | $166.00 | $150.00 | $250.25 | $258.75 |
| 0072 | Temporary raised pavement markers (4650000000-N) | EACH | 75 | $9.25 | $9.25 | $11.05 | $10.00 | $12.65 | $10.64 |
| 0073 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 19,793 | $0.65 | $0.65 | $1.27 | $1.15 | $0.90 | $0.75 |
| 0074 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 144 | $3.55 | $3.55 | $3.87 | $3.50 | $4.75 | $4.08 |
| 0075 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 86 | $5.70 | $5.70 | $15.50 | $14.00 | $7.80 | $6.56 |
| 0076 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 256 | $10.75 | $10.75 | $16.00 | $14.00 | $14.70 | $12.36 |
| 0077 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 4 | $464.00 | $464.00 | $155.00 | $140.00 | $634.00 | $533.60 |
| 0078 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 34 | $161.00 | $161.00 | $167.00 | $150.00 | $221.00 | $185.15 |
| 0079 | Paint pavement marking lines (4") (4810000000-E) | LF | 20,014 | $0.63 | $0.63 | $0.75 | $0.65 | $0.85 | $0.73 |
| 0080 | Paint pavement marking lines (8") (4820000000-E) | LF | 132 | $2.55 | $2.55 | $1.15 | $1.00 | $3.50 | $2.93 |
| 0081 | Paint pavement marking lines (16") (4830000000-E) | LF | 88 | $6.30 | $6.30 | $5.65 | $5.00 | $8.60 | $7.25 |
| 0082 | Paint pavement marking lines (24") (4835000000-E) | LF | 67 | $6.10 | $6.10 | $5.65 | $5.00 | $8.35 | $7.02 |
| 0083 | Paint pavement marking character (4840000000-N) | EACH | 4 | $72.00 | $72.00 | $56.00 | $50.00 | $98.40 | $82.80 |
| 0084 | Paint pavement marking symbol (4845000000-N) | EACH | 32 | $77.00 | $77.00 | $56.00 | $50.00 | $105.25 | $88.55 |
| 0085 | Removal of pavement marking lines (4") (4850000000-E) | LF | 17,600 | $0.52 | $0.52 | $1.11 | $1.00 | $0.70 | $0.60 |
| 0086 | Removal of pavement marking lines (8") (4860000000-E) | LF | 87 | $3.50 | $3.50 | $2.77 | $2.50 | $4.80 | $4.03 |
| 0087 | Removal of pavement marking lines (12") (4865000000-E) | LF | 100 | $5.85 | $5.85 | $4.45 | $4.00 | $8.00 | $6.73 |
| 0088 | Removal of pavement marking lines (24") (4870000000-E) | LF | 72 | $8.50 | $8.50 | $6.65 | $6.00 | $11.60 | $9.78 |
| 0089 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 4 | $61.00 | $61.00 | $250.00 | $65.00 | $83.35 | $70.15 |
| 0090 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 146 | $90.75 | $90.75 | $105.00 | $94.00 | $124.00 | $104.36 |
| 0091 | 2" water line (5325200000-E) | LF | 49 | $163.54 | $170.00 | $88.00 | $200.00 | $57.65 | $155.25 |
| 0092 | 6" water line (5325600000-E) | LF | 329 | $152.53 | $160.00 | $98.00 | $250.00 | $167.25 | $166.75 |
| 0093 | 12" water line (5326200000-E) | LF | 144 | $214.70 | $205.00 | $174.00 | $320.00 | $230.50 | $189.75 |
| 0094 | 16" water line (5326600000-E) | LF | 2,812 | $227.15 | $230.00 | $203.00 | $250.00 | $309.00 | $304.75 |
| 0095 | DI H2O pipe fittings (5329000000-E) | LB | 9,510 | $11.76 | $15.50 | $14.92 | $14.00 | $15.55 | $19.78 |
| 0096 | 2" valve (5536000000-E) | EACH | 1 | $4,128.99 | $1,800.00 | $2,285.00 | $3,225.00 | $1,903.00 | $2,294.25 |
| 0097 | 6" valve (5540000000-E) | EACH | 8 | $4,772.87 | $2,800.00 | $3,541.00 | $4,680.00 | $2,650.00 | $4,025.00 |
| 0098 | 12" valve (5558000000-E) | EACH | 1 | $9,189.69 | $6,100.00 | $7,060.00 | $9,590.00 | $4,035.00 | $9,430.00 |
| 0099 | 16" valve (5558600000-E) | EACH | 2 | $22,638 | $15,500 | $21,212 | $22,500 | $6,571.50 | $20,125 |
| 0100 | **" insertion valve - (6") (5562000000-E) | EACH | 2 | $21,764 | $22,000 | $29,907 | $17,250 | $17,293 | $33,925 |
| 0101 | 12" tapping sleeve & valve (5572200000-E) | EACH | 2 | $19,712 | $19,500 | $15,163 | $33,000 | $29,975 | $21,275 |
| 0102 | 2" air release valve (5589200000-E) | EACH | 2 | $19,496 | $9,500.00 | $7,985.00 | $13,600 | $15,218 | $14,375 |
| 0103 | 3/4" water meter (5643100000-E) | EACH | 37 | $2,218.27 | $1,300.00 | $4,453.00 | $4,100.00 | $2,536.25 | $3,392.50 |
| 0104 | Relocate water meter (5648000000-N) | EACH | 4 | $1,474.36 | $1,550.00 | $3,490.00 | $4,000.00 | $2,651.75 | $2,127.50 |
| 0105 | Fire hydrant (5666000000-N) | EACH | 7 | $6,449.62 | $7,300.00 | $8,265.00 | $11,500 | $7,148.00 | $10,925 |
| 0106 | Relocate fire hydrant (5672000000-N) | EACH | 1 | $9,636.98 | $1,850.00 | $3,544.00 | $8,015.85 | $5,764.50 | $8,625.00 |
| 0107 | Fire hydrant leg (5673000000-E) | LF | 124 | $106.71 | $125.00 | $96.90 | $140.00 | $161.50 | $178.25 |
| 0108 | Water service line (<2") (5686500000-E) | LF | 1,192 | $54.32 | $110.00 | $44.62 | $70.00 | $46.10 | $109.25 |
| 0109 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,320 | $360.55 | $190.00 | $75.00 | $225.00 | $271.00 | $258.75 |
| 0110 | 10" sanitary gravity sewer (5691400000-E) | LF | 54 | $475.09 | $215.00 | $253.00 | $330.00 | $282.50 | $316.25 |
| 0111 | 12" sanitary gravity sewer (5691500000-E) | LF | 132 | $355.27 | $240.00 | $188.00 | $350.00 | $303.25 | $373.75 |
| 0112 | 6" force main sewer (5709300000-E) | LF | 230 | $101.40 | $145.00 | $105.00 | $210.00 | $184.50 | $174.80 |
| 0113 | Sanitary sewer clean-out (5768000000-N) | EACH | 35 | $456.30 | $2,200.00 | $866.00 | $1,400.00 | $1,153.00 | $2,127.50 |
| 0114 | Sewer service line (5768500000-E) | LF | 445 | $48.23 | $95.00 | $39.50 | $80.00 | $86.45 | $155.25 |
| 0115 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 430 | $20.24 | $14.00 | $18.92 | $16.00 | $16.15 | $20.53 |
| 0116 | 4' dia utility manhole (5775000000-E) | EACH | 16 | $5,859.74 | $3,650.00 | $5,430.00 | $10,250 | $11,529 | $9,775.00 |
| 0117 | Utility manhole wall 4' dia (5781000000-E) | LF | 57.40 | $539.38 | $960.00 | $893.00 | $335.00 | $265.25 | $1,092.50 |
| 0118 | Abandon 6" utility pipe (5800000000-E) | LF | 3,628 | $41.70 | $11.00 | $10.55 | $12.00 | $19.50 | $26.45 |
| 0119 | Abandon 8" utility pipe (5801000000-E) | LF | 981 | $36.80 | $15.00 | $15.25 | $22.00 | $23.05 | $28.75 |
| 0120 | Abandon 10" utility pipe (5802000000-E) | LF | 59 | $63.00 | $17.00 | $90.00 | $50.00 | $115.25 | $32.20 |
| 0121 | Abandon 12" utility pipe (5804000000-E) | LF | 254 | $22.34 | $19.00 | $77.00 | $35.00 | $34.60 | $36.80 |
| 0122 | Abandon 18" utility pipe (5811000000-E) | LF | 50 | $84.12 | $21.00 | $132.00 | $65.00 | $138.25 | $51.75 |
| 0123 | Remove water meter (5815000000-N) | EACH | 41 | $104.00 | $750.00 | $672.00 | $975.00 | $576.50 | $977.50 |
| 0124 | Remove fire hydrant (5815500000-N) | EACH | 7 | $650.00 | $750.00 | $1,087.00 | $2,750.00 | $1,383.50 | $3,220.00 |
| 0125 | Abandon utility manhole (5816000000-N) | EACH | 5 | $518.40 | $2,450.00 | $2,508.00 | $2,500.00 | $2,536.25 | $3,680.00 |
| 0126 | 16" encasement pipe (5835700000-E) | LF | 161 | $181.96 | $195.00 | $161.00 | $285.00 | $181.50 | $224.25 |
| 0127 | Bore & jack **" - (16") (5872500000-E) | LF | 161 | $1,272.00 | $1,200.00 | $1,379.00 | $800.00 | $1,751.00 | $2,875.00 |
| 0128 | Temporary silt fence (6000000000-E) | LF | 5,200 | $2.80 | $2.75 | $3.52 | $2.80 | $3.10 | $3.45 |
| 0129 | Stone for erosion control, class A (6006000000-E) | TON | 435 | $0.01 | $49.00 | $83.10 | $30.00 | $70.00 | $20.00 |
| 0130 | Stone for erosion control, class B (6009000000-E) | TON | 2,810 | $0.01 | $50.00 | $83.10 | $23.00 | $62.00 | $20.00 |
| 0131 | Sediment control stone (6012000000-E) | TON | 1,030 | $0.01 | $45.00 | $83.10 | $25.00 | $47.75 | $20.00 |
| 0132 | Temporary mulching (6015000000-E) | ACRE | 12.50 | $1,500.00 | $1,950.00 | $1,546.00 | $500.00 | $1,667.50 | $1,610.00 |
| 0133 | Seed for temporary seeding (6018000000-E) | LB | 900 | $2.00 | $2.00 | $5.62 | $1.00 | $2.20 | $2.30 |
| 0134 | Fertilizer for temporary seeding (6021000000-E) | TON | 5 | $1,000.00 | $500.00 | $1,946.00 | $125.00 | $1,111.75 | $1,035.00 |
| 0135 | Temporary slope drains (6024000000-E) | LF | 200 | $37.66 | $10.00 | $35.00 | $5.00 | $35.25 | $25.00 |
| 0136 | Safety fence (6029000000-E) | LF | 320 | $3.00 | $1.90 | $3.30 | $3.00 | $3.35 | $15.00 |
| 0137 | Silt excavation (6030000000-E) | CY | 5,010 | $0.01 | $1.00 | $30.00 | $3.00 | $2.00 | $5.00 |
| 0138 | Matting for erosion control (6036000000-E) | SY | 10,000 | $1.65 | $1.75 | $3.00 | $1.50 | $1.85 | $2.30 |
| 0139 | Coir fiber mat (6037000000-E) | SY | 100 | $5.00 | $6.50 | $19.70 | $6.00 | $5.55 | $10.35 |
| 0140 | 1/4" hardware cloth (6042000000-E) | LF | 450 | $5.00 | $5.50 | $5.85 | $5.00 | $5.55 | $6.90 |
| 0141 | Low permeability geotextile (6043000000-E) | SY | 100 | $6.00 | $7.00 | $10.00 | $20.00 | $4.00 | $17.25 |
| 0142 | Special stilling basins (6070000000-N) | EACH | 4 | $1,314.22 | $1,824.00 | $4,620.00 | $1,000.00 | $1,632.75 | $1,000.00 |
| 0143 | Flocculant (6071002000-E) | LB | 460 | $5.25 | $8.00 | $15.25 | $4.00 | $5.85 | $10.35 |
| 0144 | Coir fiber baffle (6071030000-E) | LF | 300 | $8.00 | $6.50 | $7.60 | $8.00 | $8.90 | $12.65 |
| 0145 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 4 | $1,150.00 | $2,200.00 | $1,080.00 | $2,500.00 | $956.75 | $1,500.00 |
| 0146 | Seeding and mulching (6084000000-E) | ACRE | 10 | $2,600.00 | $2,950.00 | $3,501.00 | $1,200.00 | $2,890.50 | $3,392.50 |
| 0147 | Mowing (6087000000-E) | ACRE | 7 | $250.00 | $175.00 | $1,054.00 | $250.00 | $278.00 | $345.00 |
| 0148 | Seed for repair seeding (6090000000-E) | LB | 150 | $4.25 | $5.00 | $6.33 | $4.25 | $4.70 | $6.90 |
| 0149 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,100.00 | $500.00 | $1,546.00 | $1,100.00 | $1,223.00 | $1,840.00 |
| 0150 | Seed for supplemental seeding (6096000000-E) | LB | 275 | $4.25 | $5.00 | $6.70 | $4.00 | $4.70 | $6.90 |
| 0151 | Fertilizer topdressing (6108000000-E) | TON | 8 | $950.00 | $500.00 | $1,546.00 | $250.00 | $1,056.00 | $1,380.00 |
| 0152 | Impervious dike (6111000000-E) | LF | 200 | $119.66 | $95.00 | $279.00 | $105.00 | $148.75 | $85.00 |
| 0153 | Specialized hand mowing (6114500000-N) | MHR | 10 | $150.00 | $55.00 | $703.00 | $180.00 | $166.75 | $69.00 |
| 0154 | Response for erosion control (6117000000-N) | EACH | 25 | $75.00 | $400.00 | $293.00 | $25.00 | $83.40 | $287.50 |
| 0155 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,000.00 | $550.00 | $6,613.00 | $1,500.00 | $2,281.00 | $1,000.00 |
| 0156 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 9 | $1,000.00 | $550.00 | $1,425.00 | $1,200.00 | $976.75 | $1,000.00 |
| 0157 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E) | SY | 455 | $5.00 | $8.50 | $5.82 | $5.00 | $5.55 | $9.20 |
| 0158 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 2 (6141000000-E) | SY | 345 | $5.00 | $9.25 | $5.82 | $5.00 | $5.55 | $9.20 |
| 0159 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 4 (6141000000-E) | SY | 865 | $25.00 | $9.65 | $10.24 | $25.00 | $27.80 | $12.65 |
| 0160 | Signal cable (7060000000-E) | LF | 1,530 | $5.35 | $5.35 | $8.20 | $6.47 | $6.00 | $6.15 |
| 0161 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 14 | $1,430.00 | $1,430.00 | $1,815.00 | $1,430.00 | $1,605.75 | $1,644.50 |
| 0162 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 2 | $1,905.00 | $1,905.00 | $2,050.00 | $1,905.00 | $2,139.25 | $2,190.75 |
| 0163 | Messenger cable (3/8") (7264000000-E) | LF | 260 | $6.30 | $6.30 | $10.60 | $6.30 | $7.05 | $7.25 |
| 0164 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 545 | $13.65 | $13.65 | $16.40 | $13.65 | $15.35 | $15.70 |
| 0165 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 360 | $30.50 | $30.50 | $94.00 | $30.50 | $34.50 | $35.08 |
| 0166 | Junction box (standard size) (7324000000-N) | EACH | 15 | $940.00 | $940.00 | $791.00 | $940.00 | $1,055.50 | $1,081.00 |
| 0167 | Wood pole (7360000000-N) | EACH | 4 | $2,875.00 | $2,875.00 | $1,932.00 | $2,875.00 | $3,228.50 | $3,306.25 |
| 0168 | Guy assembly (7372000000-N) | EACH | 6 | $1,225.00 | $1,225.00 | $995.00 | $1,225.00 | $1,375.50 | $1,408.75 |
| 0169 | Inductive loop sawcut (7444000000-E) | LF | 295 | $28.00 | $28.00 | $14.06 | $28.00 | $31.45 | $32.20 |
| 0170 | Lead-in cable (14-2) (7456100000-E) | LF | 2,060 | $4.10 | $4.10 | $5.85 | $4.10 | $4.75 | $4.72 |
| 0171 | Site survey (7481000000-N) | EACH | 1 | $1,470.00 | $1,470.00 | $2,927.00 | $1,470.00 | $1,650.00 | $1,690.50 |
| 0172 | Luminaire arm for video system (7481200000-N) | EACH | 1 | $1,890.00 | $1,890.00 | $1,756.00 | $1,890.00 | $2,122.25 | $2,173.50 |
| 0173 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 1 | $7,830.00 | $7,830.00 | $4,685.00 | $7,830.00 | $8,792.50 | $9,004.50 |
| 0174 | External loop emulator processing unit (7481260000-N) | EACH | 1 | $6,690.00 | $6,690.00 | $4,507.00 | $6,690.00 | $7,512.50 | $7,693.50 |
| 0175 | Metal pole with single mast arm (7588000000-N) | EACH | 1 | $44,100 | $44,100 | $38,629 | $44,100 | $49,521 | $50,715 |
| 0176 | Soil test (7613000000-N) | EACH | 1 | $3,811.25 | $4,761.00 | $3,500.00 | $3,811.25 | $4,279.75 | $4,382.94 |
| 0177 | Drilled pier foundation (7614100000-E) | CY | 6 | $1,900.00 | $1,900.00 | $4,507.00 | $1,900.00 | $2,133.50 | $2,185.00 |
| 0178 | Mast arm with metal pole design (7631000000-N) | EACH | 1 | $295.00 | $295.00 | $900.00 | $295.00 | $331.25 | $339.25 |
| 0179 | Sign for signals (7636000000-N) | EACH | 2 | $1,070.00 | $1,070.00 | $1,990.00 | $1,070.00 | $1,201.50 | $1,230.50 |
| 0180 | Type II pedestal with foundation (7642200000-N) | EACH | 3 | $4,760.00 | $4,760.00 | $4,683.00 | $4,760.00 | $5,345.25 | $5,474.00 |
| 0181 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $4,065.00 | $4,065.00 | $2,283.00 | $4,065.00 | $4,564.75 | $4,674.75 |
| 0182 | Controller with cabinet (type 170E, base mounted) (7720000000-N) | EACH | 1 | $27,100 | $27,100 | $34,118 | $27,100 | $30,431 | $31,165 |
| 0183 | Detector card (type 170) (7744000000-N) | EACH | 4 | $325.00 | $325.00 | $500.00 | $325.00 | $365.00 | $373.75 |
| 0184 | Cabinet base extender (7901000000-N) | EACH | 1 | $750.00 | $750.00 | $1,025.00 | $750.00 | $842.25 | $862.50 |
| 0185 | Traffic signal removal (7948000000-N) | EACH | 2 | $4,400.00 | $4,400.00 | $4,917.00 | $4,400.00 | $4,941.00 | $5,060.00 |
| 0186 | Remv exist STR ****** culv (402) - (44+05.00 -L-) (8056000000-N) | LS | 1 | $20,000 | $20,000 | $29,252 | $20,000 | $23,837 | $50,000 |
| 0187 | Box culv excav @ ******** - (44+05.00 -L-) (8130000000-N) | LS | 1 | $42,000 | $35,000 | $51,711 | $150,000 | $52,043 | $50,000 |
| 0188 | Foundation conditioning material, box culvert (8133000000-E) | TON | 122 | $87.00 | $55.00 | $93.50 | $92.00 | $108.00 | $75.00 |
| 0189 | Class A concrete (culvert) (8196000000-E) | CY | 186.70 | $972.00 | $1,050.00 | $1,236.00 | $1,140.00 | $1,206.75 | $1,200.00 |
| 0190 | Reinforcing steel (culvert) (8245000000-E) | LB | 27,245 | $2.78 | $2.55 | $2.66 | $2.50 | $3.45 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.