NJR Group Inc: NCDOT bid record

NJR Group Inc submitted 40 bids on North Carolina DOT contracts in the data, from 20 FEB 2018 to 20 OCT 2026, and was the low bidder on 11 of them (28%). When it was not low, its total sat a median +10% above the low bid.

Owner
North Carolina DOT
Low bid volume
$90,315,504
Latest bid
20 OCT 2026
Data through
20 OCT 2026
40Bids
11Low bids
28Win rate, percent
+10%Median gap to the low bid when not low, 29 bids

By year

YearBidsLow bidsWin rate
2018300%
2019200%
20214250%
20224250%
2023100%
202410440%
20255120%
202611218%
NJR Group Inc, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Rowan8338%
Mecklenburg6117%
Cabarrus6583%
Randolph400%
Montgomery3133%
Davidson300%
Stanly200%
Anson200%
Moore100%
Rowan, Davie11100%
Mecklenburg, Iredell100%
Davidson, Rowan, Stanly100%
NJR Group Inc, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Asphalt conc surface course, type S9.5C1523000000-ETON2316 (70%)$77.00$64.72
Asphalt conc surface course, type S9.5B1519000000-ETON2915 (52%)$62.53$63.50
Asphalt conc base course, type B25.0C1491000000-ETON2913 (45%)$82.10$85.35
Patching existing pavement1704000000-ETON1413 (93%)$112.50$125.00
Rip rap, class B3649000000-ETON2312 (52%)$65.00$64.00
Incidental milling1330000000-ESY3811 (29%)$12.00$12.00
Asphalt conc intermediate course, type I19.0C1503000000-ETON2410 (42%)$83.20$80.64
Rip rap, class I3628000000-ETON2110 (48%)$65.00$63.00
Foundation conditioning material, minor structures0318000000-ETON239 (39%)$50.00$42.00
Shallow undercut1099500000-ECY258 (32%)$22.00$18.35
Select granular material0195000000-ECY198 (42%)$30.00$32.00
Mill asp PVMT *****" DTH - (1-1/2")1297000000-ESY267 (27%)$2.88$2.75
NJR Group Inc, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

NJR Group Inc, NCDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
20 OCT 2026C205247RowanMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-29, 1 SECTION OF NC-150, AND 13 SECTIONS OF SECONDARY ROADS1 of 2$7,712,197Low, 4.0% under the second
15 SEP 2026C204990RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS6 of 9$9,215,703+10%
16 JUN 2026C205157RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI5 of 11$14,590,554+18%
19 MAY 2026C205197RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS, AND 1 SECTION OF NC-493 of 5$5,829,348+1.0%
19 MAY 2026C205138Mecklenburg, IredellGRADING, DRAINAGE, AND PAVING. I-77 RAMPS AT US-21, NC-73, NC-24, SR-1109, AND SR-21584 of 4$7,610,343+47%
21 APR 2026C205193RandolphMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDA2 of 5$5,921,206+3.0%
17 MAR 2026C205013MecklenburgGRADING, DRAINAGE, PAVING, AND SIGNALS. GREYLOCK RIDGE RD FROM EAST JOHN ST TO TANK TOWN RD2 of 9$4,656,256+11%
17 FEB 2026C205173MontgomeryMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF US-220 ALT, NC-109, NC-134, & NC-731, AND 5 SECTIONS OF SECONDARY ROADS2 of 3$2,927,660+2.0%
17 FEB 2026C205170RowanMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-29 S,1 SECTION US-29 N, AND 13 SECTIONS OF SECONDARY ROADS2 of 3$7,593,598+6.0%
17 FEB 2026C205095MecklenburgGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-2415 (BAILEY RD) FROM POOLE PLACE DR TO US-21 (STATESVILLE RD)7 of 10$9,021,092+16%
20 JAN 2026C205117CabarrusGRADING, DRAINAGE, PAVING, AND SIGNALS. US-29 FROM 0.6 MILES WEST OF SR-1414 (ROCK HILL CHURCH RD) TO JUST EAST OF SR-1414 (ROCK HILL CHURCH1 of 5$14,016,733Low, 4.0% under the second
19 AUG 2025C204991MecklenburgBRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK6 of 6$9,185,400+35%
19 AUG 2025C205039MecklenburgGRADING, DRAINAGE, AND PAVING. SR-3174 (IDLEWILD RD) FROM SR-3175 (STALLINGS RD) TO I-4852 of 7$8,957,743+3.0%
17 JUN 2025C205016DavidsonGRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-1093 of 9$8,442,083+10%
18 FEB 2025C205051MontgomeryMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-109, 1 SECTION OF NC-134, AND 3 SECTIONS OF SECONDARY ROADS3 of 4$2,343,587+9.0%
18 FEB 2025C205054Rowan, DavieMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-601, 1 SECTION OF NC-150, 5 SECTIONS OF NC-801, AND 12 SECTIONS OF SECOND1 of 3$11,502,013Low, 2.0% under the second
17 DEC 2024C204384CabarrusGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #120109 OVER US-29 (NORTH CANNON BLVD) ON SR-1706 (MARTIN LUTHER KING JR AVENUE)1 of 9$5,729,282Low, 2.0% under the second
17 DEC 2024C204969AnsonGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030087 OVER RICHARDSON CREEK ON NC-7424 of 11$4,701,677+24%
19 NOV 2024C204949MooreGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND WALLS. NC-211 FROM NC-73 TO WEST OF SR-1241 (HOL3 of 5$46,021,720+8.0%
15 OCT 2024C204966MecklenburgGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. SR-3440 (MCKEE RD EXT) FROM SR-3448 (PLEASANT PLAINS RD) TO SR-1010 (E JOHN ST)1 of 6$10,749,728Low, 0.0% under the second
17 SEP 2024C204941DavidsonGRADING, DRAINAGE, PAVING, AND SIGNALS. NC-8 (WINSTON RD) FROM US-29/US-70 TO SR-1846 (ARRINGTON DR)2 of 4$14,012,051+4.0%
18 JUN 2024C204501MecklenburgGRADING, DRAINAGE, PAVING, AND STRUCTURES. SR-2316 (NORTHCROSS DR) FROM NORTH OF NC-73 (SAM FURR RD) TO SR-2147 (WESTMORELAND RD)4 of 9$21,782,529+4.0%
18 JUN 2024C204950AnsonGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030014 OVER S FORK JONES CREEK ON US-528 of 10$6,923,917+27%
20 FEB 2024C204917MontgomeryMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-134, NC-109 BUS, NC-109, US-220 ALT, AND 4 SECTIONS OF SECONDARY ROA1 of 4$2,368,423Low, 6.0% under the second
20 FEB 2024C204418RowanMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70 E & W, 1 SECTION OF NC-150, AND 8 SECTIONS OF SECONDARY ROADS1 of 3$5,911,698Low, 6.0% under the second
NJR Group Inc: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy