NCDOT letting results, September 17, 2024
4 contracts let by North Carolina DOT on September 17, 2024, $25,631,510 in low bids, a median of 4.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 4
- Low bids, total
- $25,631,510
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204941 | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-8 (WINSTON RD) FROM US-29/US-70 TO SR-1846 (ARRINGTON DR) | Davidson | 4 | Kemp Sigmon Construction Co Inc | $13,458,674 | $14,012,051 | +4.0% | NCDOT |
| C204982 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-54 AND 15 SECTIONS OF SECONDARY ROADS | Wake | 5 | Barnhill Contracting Company | $4,778,464 | $4,966,202 | +4.0% | NCDOT |
| C204914 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE OVER SAND HILL CREEK ON NC-133 (RIVER ROAD) | Brunswick | 9 | S & C Construction LLC | $4,566,409 | $4,644,907 | +2.0% | NCDOT |
| C204981 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-561, AND 1 SECTION OF NC-50 | Franklin, Wake | 3 | S T Wooten Corporation | $2,827,963 | $2,880,792 | +2.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.