S T Wooten Corporation: NCDOT bid record
S T Wooten Corporation submitted 436 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 137 of them (31%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $1,196,130,648
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 51 | 9 | 18% |
| 2014 | 38 | 8 | 21% |
| 2015 | 42 | 18 | 43% |
| 2016 | 41 | 16 | 39% |
| 2017 | 27 | 8 | 30% |
| 2018 | 6 | 0 | 0% |
| 2019 | 21 | 6 | 29% |
| 2020 | 19 | 7 | 37% |
| 2021 | 44 | 14 | 32% |
| 2022 | 31 | 12 | 39% |
| 2023 | 20 | 6 | 30% |
| 2024 | 38 | 16 | 42% |
| 2025 | 31 | 11 | 35% |
| 2026 | 27 | 6 | 22% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 61 | 6 | 10% |
| Johnston | 23 | 7 | 30% |
| Chatham | 21 | 8 | 38% |
| Brunswick | 19 | 7 | 37% |
| Granville | 18 | 1 | 6% |
| Moore | 15 | 5 | 33% |
| Pender | 14 | 9 | 64% |
| Franklin | 12 | 4 | 33% |
| Lee | 11 | 8 | 73% |
| Wilson | 11 | 6 | 55% |
| Vance | 10 | 2 | 20% |
| Sampson | 9 | 5 | 56% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder for plant mix | 1575000000-E | TON | 399 | 318 (80%) | $450.00 | $595.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 296 | 226 (76%) | $0.60 | $0.75 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 261 | 207 (79%) | $125.00 | $135.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 243 | 184 (76%) | $0.23 | $0.27 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 192 | 158 (82%) | $2.00 | $2.25 |
| Temporary silt fence | 6000000000-E | LF | 304 | 149 (49%) | $2.50 | $2.63 |
| Paint pavement marking symbol | 4845000000-N | EACH | 177 | 148 (84%) | $40.00 | $50.00 |
| Inductive loop sawcut | 7444000000-E | LF | 196 | 144 (73%) | $6.60 | $7.25 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 181 | 142 (78%) | $3.00 | $3.50 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 167 | 140 (84%) | $2.85 | $3.05 |
| Seeding and mulching | 6084000000-E | ACRE | 305 | 139 (46%) | $2,300.00 | $2,365.00 |
| Permanent raised pavement markers | 4900000000-N | EACH | 189 | 139 (74%) | $9.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FSC II LLC DBA Fred Smith Company | 231 | 124 of 231 |
| Barnhill Contracting Company | 136 | 57 of 136 |
| Dane Construction, Inc. | 81 | 31 of 81 |
| Carolina Sunrock LLC | 73 | 46 of 73 |
| Blythe Construction Inc | 61 | 35 of 61 |
| Dellinger, Inc. | 48 | 21 of 48 |
| Smith-Rowe, LLC | 47 | 25 of 47 |
| T. A. Loving Company | 47 | 15 of 47 |
| Sanford Contractors Inc | 46 | 17 of 46 |
| Highland Paving Co LLC | 44 | 10 of 44 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205216 | Martin | GRADING, DRAINAGE, AND PAVING. US-17 FROM SR-1521 (MILL INN RD) TO SR-1119 (RALPH TAYLOR RD) | 2 of 4 | $8,119,538 | +8.0% |
| 20 OCT 2026 | C205207 | Pender | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #700037 OVER ANGOLA CREEK ON NC-53 | 1 of 5 | $6,409,381 | Low, 9.0% under the second |
| 20 OCT 2026 | C204338 | Wake | WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53 | 8 of 8 | $54,473,489 | +36% |
| 15 SEP 2026 | C205203 | Wayne | GRADING, DRAINAGE, AND PAVING. INTERSECTION OF NC-55 AND SR-1744 (OLD SEVEN SPRINGS RD/INDIAN SPRINGS RD) | 6 of 6 | $3,905,325 | +35% |
| 15 SEP 2026 | C205233 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS | 4 of 4 | $4,632,955 | +6.0% |
| 15 SEP 2026 | C204349 | Wake, Durham | PAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE) | 2 of 4 | $22,691,740 | +8.0% |
| 21 JUL 2026 | C205201 | Pitt | GREENWAY AND MULTI-USE PATH CONSTRUCTION. (EXPRESS DB), MILL AND FILL. SR-1531 - 1ST ST TO BRG #730411, SR-1611 - N OF 1ST ST TO BRG #730470 | 3 of 4 | $4,090,000 | +40% |
| 16 JUN 2026 | C205182 | Carteret | GRADING, DRAINAGE, SIGNALS, AND PAVING. INTERSECTION OF NC-24 AND NC-58 | 2 of 2 | $9,487,072 | +7.0% |
| 16 JUN 2026 | C205213 | New Hanover | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 5 SECTIONS OF US-117, 3 SECTIONS OF NC-133, AND 46 SECTIONS OF SECONDARY ROADS | 3 of 3 | $6,493,060 | +22% |
| 16 JUN 2026 | C205212 | Pender | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, 9 SECTIONS OF SECONDARY ROADS, AND 6 SECTIONS OF TOWN ROADS | 1 of 4 | $4,074,934 | Low, 5.0% under the second |
| 16 JUN 2026 | C204970 | Brunswick | GRADING, DRAINAGE, PAVING, AND SIGNALS. NEW ROUTE FROM 0.5 MILES EAST OF BRUNSWICK COUNTY LINE TO 1.5 MILES EAST OF BRUNSWICK COUNTY LINE ON | 2 of 7 | $7,976,746 | +1.0% |
| 19 MAY 2026 | C205106 | Hyde, Beaufort | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060066 OVER PUNGO RIVER ON US-264 | 1 of 5 | $12,959,943 | Low, 6.0% under the second |
| 19 MAY 2026 | C205199 | Brunswick | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF NC-133, AND 19 SECTIONS OF SECONDARY ROADS | 3 of 4 | $5,271,418 | +3.0% |
| 21 APR 2026 | C205192 | Sampson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-421, 1 SECTION OF US-701, AND 7 SECTIONS OF SECONDARY ROADS | 1 of 3 | $6,148,138 | Low, 3.0% under the second |
| 21 APR 2026 | C205190 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | 4 of 6 | $4,266,764 | +7.0% |
| 21 APR 2026 | C205088 | Wake, Franklin | PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE | 2 of 4 | $16,864,740 | +7.0% |
| 17 MAR 2026 | C205167 | Granville | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS | 2 of 2 | $3,725,000 | +31% |
| 17 MAR 2026 | C205175 | Onslow | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF NC-111, 2 SECTIONS OF US-258, AND 6 SECTIONS OF SECONDARY ROADS | 3 of 4 | $6,725,827 | +8.0% |
| 17 MAR 2026 | C205156 | Wilson | PAVEMENT REHABILITATION. US-264 FROM WILSON CO LINE TO I-95 | 1 of 2 | $5,798,742 | Low, 22% under the second |
| 17 FEB 2026 | C204955 | Beaufort | BRIDGE PRESERVATION., GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060353 OVER US-17 BUS/TAR RIVER ON US-17 | 1 of 8 | $6,296,461 | Low, 1.0% under the second |
| 17 FEB 2026 | C205035 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS | 7 of 8 | $35,720,626 | +16% |
| 17 FEB 2026 | C205174 | Vance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-1 BUSINESS, AND 4 SECTIONS OF SECONDARY ROADS | 2 of 2 | $2,220,861 | +15% |
| 17 FEB 2026 | C204765 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-3126 (AIRPORT BLVD) FROM GARDEN SQUARE LANE TO SR-1637 (CHURCH ST) IN MORRISVILLE | 8 of 9 | $12,007,381 | +22% |
| 20 JAN 2026 | C204814 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #950020 OVER CSX TRANSPORTATION RAILROAD TRACKS ON US-70 BUS | 2 of 7 | $9,045,834 | +3.0% |
| 20 JAN 2026 | C205162 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF PRIMARY ROADS, AND 26 SECTIONS OF SECONDARY ROADS | 5 of 5 | $5,288,977 | +12% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.