T. A. Loving Company: NCDOT bid record
T. A. Loving Company submitted 53 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 16 SEP 2025, and was the low bidder on 4 of them (8%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $30,868,044
- Latest bid
- 16 SEP 2025
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 10 | 1 | 10% |
| 2014 | 4 | 0 | 0% |
| 2015 | 3 | 1 | 33% |
| 2016 | 7 | 1 | 14% |
| 2017 | 5 | 1 | 20% |
| 2019 | 2 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 14 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Bertie | 4 | 0 | 0% |
| Cumberland | 4 | 0 | 0% |
| Halifax | 3 | 0 | 0% |
| Edgecombe | 3 | 0 | 0% |
| Dare | 2 | 1 | 50% |
| Northampton | 2 | 0 | 0% |
| Pitt | 2 | 0 | 0% |
| Duplin | 2 | 0 | 0% |
| Warren | 2 | 1 | 50% |
| Robeson | 2 | 0 | 0% |
| Bladen | 2 | 0 | 0% |
| Brunswick | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pile redrives | 8393000000-N | EACH | 39 | 34 (87%) | $10.00 | $162.50 |
| Additional guardrail posts | 3150000000-N | EACH | 38 | 27 (71%) | $11.00 | $13.00 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 41 | 23 (56%) | $6.00 | $7.50 |
| Temporary slope drains | 6024000000-E | LF | 40 | 23 (57%) | $3.50 | $14.20 |
| Work zone signs (stationary) | 4400000000-E | SF | 41 | 21 (51%) | $6.40 | $7.25 |
| Silt excavation | 6030000000-E | CY | 41 | 20 (49%) | $5.00 | $9.62 |
| Concrete washout structure | 6117500000-N | EACH | 24 | 20 (83%) | $184.50 | $1,277.12 |
| Steel beam guardrail | 3030000000-E | LF | 24 | 19 (79%) | $19.00 | $24.00 |
| 6" perforated subdrain pipe | 2044000000-E | LF | 22 | 19 (86%) | $1.00 | $12.00 |
| Barricades (type III) | 4445000000-E | LF | 41 | 18 (44%) | $18.50 | $24.30 |
| Fertilizer for repair seeding | 6093000000-E | TON | 41 | 18 (44%) | $1,000.00 | $1,110.00 |
| Stone for erosion control, class A | 6006000000-E | TON | 41 | 18 (44%) | $52.00 | $48.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| S T Wooten Corporation | 47 | 32 of 47 |
| Dane Construction, Inc. | 30 | 13 of 30 |
| Sanford Contractors Inc | 19 | 16 of 19 |
| Dellinger, Inc. | 17 | 14 of 17 |
| United Contractors, Inc. DBA United Contractors Inc. of Iowa | 17 | 9 of 17 |
| Smith-Rowe, LLC | 15 | 12 of 15 |
| Palmetto Infrastructure Inc | 14 | 4 of 14 |
| FSC II LLC DBA Fred Smith Company | 14 | 11 of 14 |
| S & C Construction LLC | 12 | 12 of 12 |
| Trader Construction Co. | 8 | 1 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 SEP 2025 | C205033 | Bertie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #070024 OVER CASHIE RIVER ON NC-11 | 3 of 6 | $6,273,000 | +46% |
| 18 JUN 2024 | C204732 | Dare | DRAINAGE AND PAVING., GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #270008 OVER THE SLASH CREEK ON NC-12 AND SR-1241(EAGLE PASS RD) FROM | 4 of 4 | $5,836,225 | +30% |
| 18 APR 2023 | C204795 | Columbus | Grading, drainage, paving, and structure. BRIDGE #230005 OVER GAPWAY SWAMP ON US-76. | 6 of 7 | $5,091,912 | +31% |
| 19 JUL 2022 | C204217 | Pamlico | Grading, drainage, paving, and structure. BRIDGE #38 OVER TRENT CREEK ON NC-55. | 4 of 4 | $8,571,675 | +69% |
| 21 JUN 2022 | C204362 | Bladen | Grading, drainage, paving, and structure. BRIDGE #51 OVER WHITE OAK CANAL ON NC-11. | 5 of 7 | $7,549,775 | +31% |
| 18 JAN 2022 | C204629 | Brunswick | Grading, drainage, paving, and structure. BRIDGE #57 OVER DRIVING CREEK ON NC-211. | 6 of 7 | $3,894,750 | +41% |
| 19 OCT 2021 | C204515 | Pitt | Grading, drainage, paving, and structure. BRIDGE #171 OVER JOHNSON MILL RUN ON SR-1418 (STATON HOUSE RD). | 4 of 5 | $1,146,920 | +21% |
| 17 AUG 2021 | C204430 | Harnett, Cumberland | Grading, drainage, paving, and structure. BRIDGE #60 OVER LOWER LITTLE RIVER ON US-401. | 5 of 7 | $2,661,775 | +15% |
| 20 JUL 2021 | C204519 | Northampton | Grading, drainage, paving, and structure. BRIDGE #15 OVER WILDCAT SWAMP ON SR-1505 (NCHS RD). | 4 of 4 | $1,252,500 | +15% |
| 18 MAY 2021 | C204476 | Onslow | Grading, drainage, paving & structure. BRIDGE #31 OVER SANDY RUN SWAMP ON NC-50. | 4 of 7 | $1,768,550 | +19% |
| 18 MAY 2021 | C204518 | Edgecombe | Grading, drainage, paving, and structure. BRIDGE #22 OVER TOWN CREEK ON US-258. | 4 of 7 | $1,979,325 | +7.0% |
| 20 APR 2021 | C204178 | Beaufort | Grading, drainage, paving, and structure. BRIDGE #43 OVER PUNGO CREEK ON US-264. | 5 of 5 | $2,104,830 | +14% |
| 20 APR 2021 | C204483 | Cumberland | Grading, drainage, paving, and structure. BRIDGE #25 OVER BEAVER DAM CREEK ON NC-242. | 5 of 7 | $2,639,675 | +18% |
| 16 MAR 2021 | C204521 | Pitt | Grading, drainage, paving, and structure. BRIDGE #109 OVER GRINDLE CREEK ON SR-1514 (STATON MILL RD). | 5 of 10 | $998,250 | +7.0% |
| 16 FEB 2021 | C204535 | Duplin | Grading, drainage, paving, and structure. BRIDGE #36 OVER MAXWELL CREEK ON NC-11 (CLODFELTER RD). | 5 of 7 | $3,432,205 | +15% |
| 16 FEB 2021 | C204534 | Duplin | Grading, drainage, paving, and structure. BRIDGE #82 OVER BURNT COAT CREEK ON NC-111. | 8 of 9 | $2,695,370 | +16% |
| 16 FEB 2021 | C204489 | Halifax | Grading, drainage, paving, and structure. BRIDGE #93 OVER CONOCANNARA SWAMP ON NC-561. | 3 of 4 | $2,729,900 | +22% |
| 16 FEB 2021 | C204517 | Edgecombe | Grading, drainage, paving, and structure. BRIDGE #87 OVER SWIFT CREEK ON NC-97. | 6 of 7 | $2,348,717 | +19% |
| 19 JAN 2021 | C204524 | Sampson | Grading, drainage, paving, and structure. BRIDGE #348 OVER BEAVERDAM CREEK ON SR-1703 (OLD GOLDSBORO RD). | 8 of 12 | $731,990 | +16% |
| 19 JAN 2021 | C204531 | Halifax | Grading, drainage, paving, and structure. BRIDGE # 115 OVER ROCKY SWAMP ON SR-1601. | 5 of 9 | $789,070 | +14% |
| 15 DEC 2020 | C204530 | Northampton | Grading, drainage, paving, and structure. BRIDGE #93 OVER JACKS SWAMP ON SR-1203 (JACKS SWAMP RD). | 10 of 10 | $1,515,400 | +67% |
| 15 DEC 2020 | C204539 | Edgecombe | Grading, drainage, paving, and structure. BRIDGE # 35 OVER OTTER CREEK ON SR-1616 (SHARP POINT ROAD). | 7 of 11 | $1,155,775 | +19% |
| 18 JUN 2019 | C204151 | Brunswick | Grading, drainage, paving, and structure. BRIDGE #47 OVER BEAR PEN ISLAND SWAMP ON NC-211 (GREEN SWAMP RD). | 2 of 6 | $2,691,310 | +8.0% |
| 16 APR 2019 | C204206 | Bertie | Grading, drainage, paving, and structure. BRIDGE #57 OVER QUIOCCOSION SWAMP ON US-13. | 2 of 3 | $2,471,004 | 0.0% |
| 21 NOV 2017 | C203983 | Pender | Grading, drainage, paving, and structure. BRIDGE #203 OVER SILLS CREEK ON SR-1324 (CROOKED RUN ROAD). | 4 of 7 | $900,088 | +24% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.