NCDOT contract C205033 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #070024 OVER CASHIE RIVER ON NC-11. Let by North Carolina DOT on September 16, 2025, Bertie. 6 bids received; low bid $4,295,107 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 16 SEP 2025
- Pay items
- 118
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $4,295,107 | Low |
| 2 | Sanford Contractors Inc | $4,385,500 | +2.0% |
| 3 | T. A. Loving Company | $6,273,000 | +46% |
| 4 | Zachry Construction Corporation | $6,795,912 | +58% |
| 5 | Caton Construction Group Inc | $6,936,678 | +62% |
| 6 | W C English Incorporated | $6,968,989 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Sanford Contractors Inc | 3. T. A. Loving Company | 4. Zachry Construction Corporation | 5. Caton Construction Group Inc | 6. W C English Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $217,000 | $219,275 | $310,000 | $343,500 | $346,834 | $348,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $75,000 | $50,000 | $85,000 | $150,000 | $56,650 | $69,886 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $68,000 | $80,000 | $125,000 | $750,000 | $45,000 | $400,800 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $1,000.00 | $0.01 | $8,000.00 | $13,036 | $15,000 | $0.01 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 3,800 | $14.00 | $16.00 | $10.00 | $9.49 | $25.00 | $90.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 300 | $45.00 | $15.00 | $25.00 | $21.44 | $36.50 | $35.90 |
| 0007 | Borrow excavation (0106000000-E) | CY | 15,300 | $26.00 | $27.52 | $17.50 | $20.23 | $45.00 | $25.30 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 45 | $25.00 | $28.00 | $40.00 | $7.97 | $39.50 | $20.00 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 5,360 | $3.50 | $8.59 | $10.00 | $7.78 | $7.33 | $17.40 |
| 0010 | Select granular material (0195000000-E) | CY | 300 | $30.00 | $44.54 | $17.50 | $52.05 | $37.00 | $33.45 |
| 0011 | Geotextile for soil stabilization (0196000000-E) | SY | 300 | $8.00 | $5.00 | $6.50 | $2.86 | $7.56 | $4.00 |
| 0012 | Generic grading item (LS) - type 1 bridge approach fill, station 26+83.00 -L- (0248000000-N) | LS | 1 | $49,630 | $75,000 | $65,000 | $34,491 | $50,000 | $23,000 |
| 0013 | Foundation conditioning material, minor structures (0318000000-E) | TON | 730 | $7.20 | $0.01 | $39.50 | $51.88 | $85.00 | $65.60 |
| 0014 | FND condit geotextile (4A) (0321000000-E) | SY | 680 | $8.00 | $1.00 | $2.00 | $4.07 | $8.50 | $4.15 |
| 0015 | **" side drain pipe - (30") (0342000000-E) | LF | 72 | $85.00 | $119.37 | $105.00 | $137.37 | $211.00 | $166.50 |
| 0016 | 15" side drain pipe (0343000000-E) | LF | 20 | $40.00 | $144.51 | $65.00 | $72.45 | $114.00 | $130.00 |
| 0017 | 15" RC pipe culverts, class III (0366000000-E) | LF | 100 | $80.00 | $108.02 | $82.00 | $89.29 | $160.00 | $146.30 |
| 0018 | Pipe removal (0995000000-E) | LF | 84 | $12.00 | $5.00 | $20.00 | $26.63 | $88.00 | $21.50 |
| 0019 | Fine grading (1011000000-N) | LS | 1 | $126,000 | $148,000 | $275,000 | $70,353 | $27,500 | $105,062 |
| 0020 | Aggregate base course (1121000000-E) | TON | 2,914 | $40.00 | $41.80 | $45.00 | $40.81 | $105.50 | $49.65 |
| 0021 | Incidental stone base (1220000000-E) | TON | 100 | $45.00 | $50.00 | $90.00 | $36.96 | $105.50 | $67.25 |
| 0022 | Prime coat (1275000000-E) | GAL | 2,160 | $8.00 | $4.00 | $3.50 | $4.11 | $3.54 | $16.80 |
| 0023 | Incidental milling (1330000000-E) | SY | 320 | $18.85 | $18.00 | $20.00 | $27.88 | $26.05 | $34.30 |
| 0024 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 1,110 | $94.00 | $93.00 | $95.00 | $111.57 | $95.96 | $105.30 |
| 0025 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 1,100 | $96.00 | $95.00 | $88.00 | $103.36 | $88.89 | $107.50 |
| 0026 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 2,200 | $97.00 | $96.00 | $90.00 | $105.70 | $90.91 | $108.65 |
| 0027 | Asphalt binder for plant mix (1575000000-E) | TON | 235 | $585.00 | $585.00 | $608.00 | $714.06 | $614.14 | $655.20 |
| 0028 | Generic paving item (LF) - sinusoidal milled rumble strips, (14") (1881000000-E) | LF | 13,290 | $0.48 | $0.67 | $0.75 | $0.56 | $1.50 | $4.18 |
| 0029 | Subdrain excavation (2022000000-E) | CY | 45 | $4.50 | $0.01 | $0.01 | $12.79 | $90.00 | $44.65 |
| 0030 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $1.20 | $0.01 | $0.01 | $2.49 | $13.47 | $4.10 |
| 0031 | Subdrain coarse aggregate (2036000000-E) | CY | 34 | $8.00 | $0.01 | $0.01 | $79.96 | $203.50 | $95.00 |
| 0032 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $1.60 | $0.01 | $0.01 | $23.55 | $50.85 | $17.15 |
| 0033 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $40.00 | $0.01 | $0.01 | $275.27 | $1,900.00 | $382.00 |
| 0034 | 6" outlet pipe (2077000000-E) | LF | 6 | $4.50 | $0.01 | $0.01 | $23.48 | $135.00 | $57.00 |
| 0035 | Masonry drainage structures (2286000000-N) | EACH | 4 | $2,900.00 | $3,902.74 | $3,500.00 | $4,661.72 | $9,750.00 | $5,678.00 |
| 0036 | Masonry drainage structures (2308000000-E) | LF | 1.60 | $500.00 | $600.00 | $780.00 | $704.39 | $1,184.50 | $1,339.00 |
| 0037 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 4 | $2,100.00 | $2,500.00 | $1,200.00 | $1,064.29 | $2,000.00 | $997.00 |
| 0038 | Shoulder berm gutter (2556000000-E) | LF | 90 | $121.22 | $180.00 | $102.00 | $75.93 | $68.50 | $67.40 |
| 0039 | Steel beam guardrail (3030000000-E) | LF | 612.50 | $23.50 | $23.50 | $23.50 | $27.73 | $23.50 | $26.32 |
| 0040 | Additional guardrail posts (3150000000-N) | EACH | 5 | $11.00 | $11.00 | $11.00 | $64.92 | $11.00 | $12.32 |
| 0041 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 4 | $3,400.00 | $3,400.00 | $3,400.00 | $4,012.86 | $3,400.00 | $3,808.00 |
| 0042 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 4 | $2,500.00 | $2,500.00 | $2,500.00 | $2,950.63 | $2,500.00 | $2,912.00 |
| 0043 | Remove existing guardrail (3360000000-E) | LF | 890 | $1.00 | $1.00 | $1.00 | $1.18 | $1.00 | $1.12 |
| 0044 | Temporary steel beam guardrail (3380000000-E) | LF | 425 | $8.00 | $8.00 | $8.00 | $9.44 | $8.00 | $8.96 |
| 0045 | Temp GDRL anch units ****** - (B-77) (3387000000-N) | EACH | 4 | $950.00 | $950.00 | $950.00 | $1,121.25 | $950.00 | $1,064.00 |
| 0046 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 4 | $2,000.00 | $2,000.00 | $2,000.00 | $2,360.50 | $2,000.00 | $2,240.00 |
| 0047 | Temporary additional guardrail posts (3389160000-N) | EACH | 5 | $1.00 | $1.00 | $1.00 | $1.18 | $1.00 | $1.12 |
| 0048 | Woven wire fence reset (3566000000-E) | LF | 535 | $15.00 | $14.25 | $14.25 | $9.49 | $14.50 | $8.96 |
| 0049 | Rip rap, class II (3635000000-E) | TON | 70 | $130.00 | $150.00 | $200.00 | $69.35 | $107.47 | $74.70 |
| 0050 | Rip rap, class B (3649000000-E) | TON | 280 | $75.00 | $53.93 | $110.00 | $67.03 | $105.00 | $68.00 |
| 0051 | Geotextile for drainage (3656000000-E) | SY | 1,365 | $6.00 | $7.00 | $5.75 | $3.69 | $7.52 | $3.15 |
| 0052 | Work zone signs (stationary) (4400000000-E) | SF | 128 | $7.00 | $25.00 | $7.00 | $2.97 | $8.00 | $9.00 |
| 0053 | Work zone signs (portable) (4405000000-E) | SF | 96 | $45.00 | $10.00 | $19.99 | $2.97 | $15.52 | $19.60 |
| 0054 | Work zone signs (barricade mounted) (4410000000-E) | SF | 36 | $7.75 | $9.00 | $7.75 | $15.42 | $9.00 | $9.50 |
| 0055 | Drums (4430000000-N) | EACH | 34 | $29.00 | $25.00 | $21.99 | $1.55 | $29.93 | $64.00 |
| 0056 | Barricades (type III) (4445000000-E) | LF | 48 | $21.50 | $40.00 | $21.50 | $11.27 | $24.39 | $22.40 |
| 0057 | Flagger (4455000000-N) | DAY | 40 | $550.00 | $0.01 | $300.00 | $364.49 | $1,164.13 | $441.00 |
| 0058 | Skinny drum (4516000000-N) | EACH | 82 | $25.00 | $20.00 | $16.99 | $1.55 | $29.93 | $62.50 |
| 0059 | Temporary raised pavement markers (4650000000-N) | EACH | 167 | $12.10 | $12.10 | $11.91 | $12.61 | $12.10 | $13.55 |
| 0060 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 8,000 | $1.12 | $1.12 | $3.87 | $1.99 | $1.12 | $1.25 |
| 0061 | Paint pavement marking lines (6") (4815000000-E) | LF | 18,264 | $0.44 | $0.44 | $0.54 | $0.91 | $0.44 | $0.49 |
| 0062 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 30 | $175.00 | $175.00 | $238.20 | $240.98 | $175.00 | $196.00 |
| 0063 | 10" water line (5326000000-E) | LF | 1,785 | $93.00 | $160.00 | $250.00 | $96.11 | $200.00 | $221.95 |
| 0064 | DI H2O pipe fittings (5329000000-E) | LB | 600 | $19.00 | $15.00 | $30.00 | $10.83 | $25.00 | $31.40 |
| 0065 | 10" valve (5552000000-E) | EACH | 2 | $6,800.00 | $7,950.00 | $20,000 | $5,268.25 | $10,000 | $7,436.60 |
| 0066 | Water service line (<2") (5686500000-E) | LF | 6 | $800.00 | $95.00 | $750.00 | $139.68 | $390.00 | $343.00 |
| 0067 | Abandon 10" utility pipe (5802000000-E) | LF | 1,734 | $26.00 | $14.00 | $40.00 | $16.80 | $31.37 | $25.40 |
| 0068 | Direct drill **" - (10") (5872600000-E) | LF | 871 | $90.00 | $135.00 | $125.00 | $234.85 | $111.89 | $58.12 |
| 0069 | Temporary silt fence (6000000000-E) | LF | 1,830 | $3.75 | $4.00 | $3.99 | $4.21 | $3.75 | $4.20 |
| 0070 | Stone for erosion control, class A (6006000000-E) | TON | 105 | $85.00 | $41.00 | $100.00 | $65.50 | $103.00 | $64.00 |
| 0071 | Stone for erosion control, class B (6009000000-E) | TON | 190 | $90.00 | $42.00 | $100.00 | $66.64 | $103.00 | $65.00 |
| 0072 | Sediment control stone (6012000000-E) | TON | 255 | $70.00 | $39.00 | $75.00 | $51.78 | $103.00 | $65.00 |
| 0073 | Temporary mulching (6015000000-E) | ACRE | 4.50 | $1,800.00 | $1,200.00 | $1,800.00 | $1,891.78 | $2,200.00 | $2,016.00 |
| 0074 | Seed for temporary seeding (6018000000-E) | LB | 300 | $3.50 | $5.00 | $5.00 | $1.13 | $2.00 | $3.90 |
| 0075 | Fertilizer for temporary seeding (6021000000-E) | TON | 1.50 | $1,400.00 | $1,200.00 | $1,800.00 | $1,654.56 | $400.00 | $1,568.00 |
| 0076 | Temporary slope drains (6024000000-E) | LF | 200 | $25.00 | $10.70 | $1.00 | $27.83 | $55.07 | $17.90 |
| 0077 | Safety fence (6029000000-E) | LF | 2,700 | $3.50 | $2.50 | $3.38 | $1.84 | $2.00 | $3.95 |
| 0078 | Silt excavation (6030000000-E) | CY | 240 | $10.00 | $0.01 | $5.00 | $14.16 | $80.00 | $0.01 |
| 0079 | Matting for erosion control (6036000000-E) | SY | 20,500 | $1.70 | $0.01 | $1.79 | $2.00 | $1.80 | $1.90 |
| 0080 | Coir fiber mat (6037000000-E) | SY | 1,550 | $6.00 | $5.00 | $5.95 | $6.52 | $5.75 | $6.72 |
| 0081 | 1/4" hardware cloth (6042000000-E) | LF | 950 | $5.00 | $5.00 | $7.25 | $8.24 | $6.00 | $5.60 |
| 0082 | Floating turbidity curtain (6048000000-E) | SY | 200 | $50.00 | $12.84 | $32.10 | $40.18 | $35.00 | $69.95 |
| 0083 | Flocculant (6071002000-E) | LB | 35 | $5.00 | $25.00 | $30.00 | $23.12 | $8.00 | $19.30 |
| 0084 | Coir fiber wattle (6071012000-E) | LF | 1,250 | $9.50 | $13.00 | $13.75 | $11.73 | $14.00 | $10.64 |
| 0085 | Coir fiber baffle (6071030000-E) | LF | 50 | $24.00 | $15.00 | $1.00 | $11.57 | $7.00 | $26.88 |
| 0086 | Seeding and mulching (6084000000-E) | ACRE | 6 | $2,800.00 | $0.01 | $100.00 | $3,498.89 | $3,300.00 | $3,136.00 |
| 0087 | Mowing (6087000000-E) | ACRE | 3 | $300.00 | $300.00 | $500.00 | $415.12 | $175.00 | $336.00 |
| 0088 | Seed for repair seeding (6090000000-E) | LB | 50 | $4.50 | $5.00 | $23.00 | $11.86 | $6.00 | $5.00 |
| 0089 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,400.00 | $1,200.00 | $2,500.00 | $1,654.62 | $800.00 | $1,568.00 |
| 0090 | Seed for supplemental seeding (6096000000-E) | LB | 125 | $4.50 | $5.00 | $1.00 | $11.86 | $6.00 | $5.00 |
| 0091 | Fertilizer topdressing (6108000000-E) | TON | 3.50 | $1,200.00 | $1,200.00 | $1,750.00 | $2,128.99 | $800.00 | $1,344.00 |
| 0092 | Specialized hand mowing (6114500000-N) | MHR | 10 | $175.00 | $75.00 | $95.00 | $112.68 | $55.00 | $196.00 |
| 0093 | Manual litter removal (6114800000-N) | MHR | 2 | $175.00 | $75.00 | $100.00 | $112.68 | $55.00 | $245.30 |
| 0094 | Litter disposal (6114900000-E) | TON | 1 | $200.00 | $250.00 | $500.00 | $533.75 | $350.00 | $2,102.50 |
| 0095 | Response for erosion control (6117000000-N) | EACH | 25 | $25.00 | $0.01 | $10.00 | $415.12 | $500.00 | $280.00 |
| 0096 | Concrete washout structure (6117500000-N) | EACH | 2 | $2,000.00 | $321.00 | $250.00 | $957.76 | $3,300.00 | $3,269.00 |
| 0097 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 1 | $2,000.00 | $321.00 | $1,000.00 | $1,526.00 | $600.00 | $1,583.00 |
| 0098 | CM&R temp STR *********** - (26+83.00 -L-) (8007000000-N) | LS | 1 | $425,000 | $455,000 | $1,117,916 | $1,500,000 | $1,299,129 | $1,348,000 |
| 0099 | Remv exist STR ****** BRG (402) - (26+83.00 -L-) (8035000000-N) | LS | 1 | $225,000 | $220,000 | $290,817 | $500,000 | $275,000 | $578,540 |
| 0100 | Asbestos assessment (8065000000-N) | LS | 1 | $1,000.00 | $2,000.00 | $2,000.00 | $930.25 | $1,900.00 | $2,128.00 |
| 0101 | Uncl STR excav sta ***** - (26+83.00 -L-) (8121000000-N) | LS | 1 | $35,000 | $12,000 | $60,000 | $10,852 | $32,250 | $22,000 |
| 0102 | Reinforced concrete deck slab (8147000000-E) | SF | 5,551 | $75.00 | $68.00 | $130.00 | $65.53 | $98.50 | $61.00 |
| 0103 | Grooving bridge floors (8161000000-E) | SF | 6,549 | $0.80 | $1.18 | $1.00 | $1.43 | $0.64 | $1.11 |
| 0104 | Class A concrete (bridge) (8182000000-E) | CY | 80.60 | $1,300.00 | $1,900.00 | $2,500.00 | $1,638.03 | $2,611.00 | $1,740.00 |
| 0105 | BRG appr slab *********** - (26+83.00 -L-) (8210000000-N) | LS | 1 | $77,500 | $93,000 | $130,000 | $94,447 | $101,000 | $89,000 |
| 0106 | Reinforcing steel (bridge) (8217000000-E) | LB | 10,713 | $2.25 | $0.80 | $0.99 | $1.33 | $2.00 | $1.28 |
| 0107 | Fib **" prestr conc girdr - (36") (8278000000-E) | LF | 511.33 | $410.00 | $400.00 | $450.00 | $433.50 | $600.00 | $456.00 |
| 0108 | Pile DRV equip setup * prestr conc piles - (24") (8328000000-E) | EACH | 7 | $1,725.00 | $4,647.00 | $14,000 | $14,286 | $16,000 | $18,000 |
| 0109 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 14 | $1,360.00 | $2,590.00 | $5,000.00 | $4,285.71 | $800.00 | $807.00 |
| 0110 | 24" prestressed concrete piles (8350000000-E) | LF | 560 | $160.00 | $104.86 | $125.00 | $220.98 | $275.00 | $240.00 |
| 0111 | HP 12 X 53 steel piles (8364000000-E) | LF | 1,260 | $57.00 | $39.61 | $45.00 | $74.64 | $125.00 | $101.00 |
| 0112 | Pile redrives (8393000000-N) | EACH | 12 | $141.00 | $0.01 | $10.00 | $739.53 | $3,200.00 | $390.00 |
| 0113 | Dynamic pile testing (8394000000-N) | EACH | 4 | $4,700.00 | $2,100.00 | $3,000.00 | $2,372.13 | $8,550.00 | $2,240.00 |
| 0114 | Concrete barrier rail (8503000000-E) | LF | 256.67 | $182.50 | $208.00 | $175.00 | $206.45 | $186.50 | $172.00 |
| 0115 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 294 | $85.00 | $65.00 | $150.00 | $69.34 | $105.00 | $64.00 |
| 0116 | Geotextile for drainage (8622000000-E) | SY | 325 | $3.00 | $3.75 | $2.00 | $4.58 | $15.36 | $3.40 |
| 0117 | Elastomeric bearings (8657000000-N) | LS | 1 | $10,000 | $9,681.11 | $10,000 | $20,028 | $25,000 | $20,000 |
| 0118 | Breaking of existing asphalt pavement (0177000000-E) | SY | 3,570 | $3.85 | $4.95 | $7.50 | $5.87 | $20.59 | $5.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of September 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.