W C English Incorporated submitted 134 bids on North Carolina DOT contracts in the data, from 19 MAR 2013 to 21 JUL 2026, and was the low bidder on 9 of them (7%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $202,386,700
- Latest bid
- 21 JUL 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 10 | 0 | 0% |
| 2014 | 8 | 1 | 13% |
| 2015 | 9 | 0 | 0% |
| 2016 | 5 | 0 | 0% |
| 2017 | 7 | 0 | 0% |
| 2018 | 14 | 2 | 14% |
| 2019 | 4 | 0 | 0% |
| 2020 | 5 | 0 | 0% |
| 2021 | 15 | 2 | 13% |
| 2022 | 15 | 2 | 13% |
| 2023 | 10 | 1 | 10% |
| 2024 | 9 | 0 | 0% |
| 2025 | 17 | 0 | 0% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rockingham | 16 | 3 | 19% |
| Wake | 11 | 0 | 0% |
| Guilford | 10 | 0 | 0% |
| Johnston | 9 | 1 | 11% |
| Forsyth | 6 | 0 | 0% |
| Davidson | 5 | 0 | 0% |
| Alamance | 5 | 0 | 0% |
| Nash | 4 | 0 | 0% |
| Lenoir | 3 | 1 | 33% |
| Stokes | 3 | 0 | 0% |
| Robeson | 3 | 0 | 0% |
| Bladen | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reinforcing steel (bridge) | 8217000000-E | LB | 117 | 57 (49%) | $1.20 | $1.25 |
| Reinforced concrete deck slab | 8147000000-E | SF | 109 | 39 (36%) | $40.50 | $42.00 |
| Spiral column reinforcing steel (bridge) | 8238000000-E | LB | 91 | 39 (43%) | $2.15 | $2.35 |
| Pile DRV equip setup ** steel piles - (HP 12 X 53) | 8328200000-E | EACH | 67 | 35 (52%) | $675.00 | $1,250.00 |
| Temporary slope drains | 6024000000-E | LF | 133 | 27 (20%) | $14.70 | $14.20 |
| Silt excavation | 6030000000-E | CY | 50 | 25 (50%) | $1.17 | $9.62 |
| **" skimmer - (1-1/2") | 6071050000-E | EACH | 80 | 23 (29%) | $898.45 | $1,084.98 |
| TMA | 4480000000-N | EACH | 87 | 21 (24%) | $10,750 | $15,000 |
| Rip rap, class B | 3649000000-E | TON | 124 | 19 (15%) | $59.48 | $64.00 |
| Rip rap, class I | 3628000000-E | TON | 96 | 17 (18%) | $56.30 | $63.00 |
| Rip rap class II (2'-0" thick) | 8608000000-E | TON | 61 | 16 (26%) | $61.00 | $55.00 |
| Specialized hand mowing | 6114500000-N | MHR | 134 | 15 (11%) | $74.75 | $64.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Smith-Rowe, LLC | 52 | 49 of 52 |
| Caton Construction Group Inc | 50 | 10 of 50 |
| Blythe Construction Inc | 45 | 26 of 45 |
| FSC II LLC DBA Fred Smith Company | 44 | 34 of 44 |
| S T Wooten Corporation | 41 | 30 of 41 |
| Dane Construction, Inc. | 39 | 20 of 39 |
| Vecellio & Grogan Inc | 30 | 14 of 30 |
| Zachry Construction Corporation | 30 | 15 of 30 |
| Barnhill Contracting Company | 24 | 18 of 24 |
| Flatiron Constructors Inc | 22 | 9 of 22 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 JUL 2026 | C205194 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780177 OVER MATRIMONY CREEK ON SR-1535 (PRICE RD) | 4 of 5 | $4,799,847 | +38% |
| 16 JUN 2026 | C205160 | Forsyth | GRADING DRAINAGE, PAVING, SIGNALS AND STRUCTURE., GRADING DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #330289 OVER US-52 ON SR-4000 | 3 of 5 | $20,400,419 | +7.0% |
| 16 JUN 2026 | C205186 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS | 1 of 6 | $12,267,793 | Low, 5.0% under the second |
| 17 FEB 2026 | C204936 | Alamance | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STURCTURES. BRIDGE #000014 OVER CANE CREEK ON NC-87 | 4 of 7 | $8,640,573 | +12% |
| 20 JAN 2026 | C204814 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #950020 OVER CSX TRANSPORTATION RAILROAD TRACKS ON US-70 BUS | 6 of 7 | $10,641,172 | +21% |
| 20 JAN 2026 | C205128 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780176 OVER NC-14/NC-87 ON SR-1700 (FISHER HILL RD) | 3 of 3 | $3,618,469 | +21% |
| 16 DEC 2025 | C205018 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. UPGRADE FUTURE I-73/US-220 AT US-311/NC-135 INTERCHANGE AND REPLACE BRIDGE #780074 | 4 of 6 | $21,082,735 | +16% |
| 16 DEC 2025 | C205071 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780163 OVER HOGAN'S CREEK ON US-158 | 2 of 3 | $5,132,692 | +13% |
| 18 NOV 2025 | C205069 | Robeson | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #770175 OVER LUMBER RIVER ON SR-1600 | 5 of 6 | $7,519,602 | +15% |
| 18 NOV 2025 | C205044 | Surry, Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | 3 of 6 | $19,502,517 | +16% |
| 21 OCT 2025 | C205116 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780183 OVER US-29 BYP ON US-29 BUS | 2 of 4 | $4,880,307 | +6.0% |
| 21 OCT 2025 | C205093 | Davie | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40 | 9 of 10 | $45,711,640 | +42% |
| 16 SEP 2025 | C205033 | Bertie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #070024 OVER CASHIE RIVER ON NC-11 | 6 of 6 | $6,968,989 | +62% |
| 19 AUG 2025 | C204832 | Nash, Halifax | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #630036 OVER FISHING CREEK ON NC-561 | 6 of 7 | $6,445,688 | +52% |
| 19 AUG 2025 | C205076 | Cumberland, Hoke | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUC | 2 of 5 | $18,323,698 | +3.0% |
| 19 AUG 2025 | C204829 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #780140 OVER DAN RIVER ON SR-1138 | 4 of 4 | $15,586,469 | +20% |
| 17 JUN 2025 | C205041 | Forsyth | GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY) | 5 of 8 | $15,903,333 | +18% |
| 17 JUN 2025 | C205016 | Davidson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | 6 of 9 | $8,701,290 | +13% |
| 15 APR 2025 | C205061 | Guilford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #400224 OVER SOUTH BUFFALO CREEK ON SR-3000 (MCCONNELL RD) | 7 of 8 | $5,964,232 | +49% |
| 15 APR 2025 | C205059 | Stokes | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840286 OVER LITTLE YADKIN RIVER ON SR-1236 (NORTH OLD 52) | 4 of 7 | $8,166,644 | +25% |
| 18 FEB 2025 | C204978 | Stokes | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840082 OVER THE DAN RIVER ON SR-1674 (SHEPPARD MILL ROAD) | 3 of 8 | $7,846,409 | +19% |
| 18 FEB 2025 | C204979 | Davie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #290076 OVER I-40 ON SR-1436 (PINEBROOK SCHOOL RD) | 3 of 10 | $4,886,280 | +15% |
| 21 JAN 2025 | C204972 | Johnston | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #500070 OVER NEUSE RIVER ON US-301 | 6 of 10 | $11,520,701 | +22% |
| 20 AUG 2024 | C204864 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780178 OVER US-29 ON SR-1929 | 4 of 7 | $4,495,275 | +13% |
| 18 JUN 2024 | C204204 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. GRADE SEPARATION OF SR-2006 (DURANT ROAD) OVER CSX S LINE RAILROAD IN RALEIGH | 8 of 8 | $24,907,654 | +32% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.