NCDOT contract C205069 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #770175 OVER LUMBER RIVER ON SR-1600 (W 5TH ST). Let by North Carolina DOT on November 18, 2025, Robeson. 6 bids received; low bid $6,542,887 by S & C Construction LLC.
- Owner
- North Carolina DOT
- Letting
- 18 NOV 2025
- Pay items
- 151
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S & C Construction LLC | $6,542,887 | Low |
| 2 | Smith-Rowe, LLC | $6,826,205 | +4.0% |
| 3 | Sanford Contractors Inc | $7,396,800 | +13% |
| 4 | Conti Civil LLC | $7,397,442 | +13% |
| 5 | W C English Incorporated | $7,519,602 | +15% |
| 6 | Caton Construction Group Inc | $8,140,999 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S & C Construction LLC | 2. Smith-Rowe, LLC | 3. Sanford Contractors Inc | 4. Conti Civil LLC | 5. W C English Incorporated | 6. Caton Construction Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $294,000 | $341,300 | $369,840 | $365,000 | $376,000 | $407,050 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $33,600 | $32,500 | $60,000 | $100,000 | $45,952 | $25,000 |
| 0003 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $0.01 | $1.00 | $1.00 | $1,000.00 | $1.00 | $9,727.43 |
| 0004 | Undercut excavation (0057000000-E) | CY | 200 | $0.01 | $30.00 | $30.00 | $100.00 | $32.25 | $51.89 |
| 0005 | Grading (0063000000-N) | LS | 1 | $480,000 | $85,000 | $105,000 | $60,000 | $290,950 | $300,000 |
| 0006 | Borrow excavation (0106000000-E) | CY | 1,400 | $33.60 | $25.00 | $25.00 | $0.01 | $26.75 | $31.23 |
| 0007 | Select granular material (0195000000-E) | CY | 200 | $1.12 | $25.00 | $25.00 | $56.00 | $26.75 | $138.93 |
| 0008 | Geotextile for soil stabilization (0196000000-E) | SY | 200 | $1.12 | $4.50 | $4.50 | $3.00 | $5.00 | $6.65 |
| 0009 | Generic grading item (LS) - type 1 bridge approach fill, station 22+08 -L- (0248000000-N) | LS | 1 | $52,640 | $83,100 | $79,000 | $35,000 | $59,000 | $85,000 |
| 0010 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $112.00 | $250.00 | $250.00 | $100.00 | $267.50 | $41.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 40 | $56.00 | $75.00 | $75.00 | $74.00 | $80.25 | $115.44 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 120 | $1.12 | $9.00 | $9.00 | $4.00 | $9.75 | $5.65 |
| 0013 | 15" drainage pipe (0335200000-E) | LF | 188 | $35.84 | $95.00 | $95.00 | $100.00 | $101.75 | $103.89 |
| 0014 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 8 | $112.00 | $400.00 | $400.00 | $1,020.00 | $428.00 | $856.09 |
| 0015 | 15" RC pipe culverts, class III (0366000000-E) | LF | 44 | $78.40 | $105.00 | $105.00 | $135.00 | $112.50 | $165.43 |
| 0016 | 72" RC pipe culverts, class III (0426000000-E) | LF | 112 | $1,310.40 | $1,100.00 | $1,100.00 | $1,000.00 | $1,177.00 | $985.00 |
| 0017 | Pipe removal (0995000000-E) | LF | 206 | $22.40 | $45.00 | $45.00 | $150.00 | $48.25 | $100.00 |
| 0018 | Shallow undercut (1099500000-E) | CY | 50 | $1.12 | $75.00 | $75.00 | $100.00 | $80.25 | $66.71 |
| 0019 | Class IV subgrade stabilization (1099700000-E) | TON | 100 | $44.80 | $65.00 | $65.00 | $57.00 | $69.50 | $105.00 |
| 0020 | Geotextile for subgrade stabilization (1112000000-E) | SY | 150 | $1.12 | $4.50 | $4.50 | $3.90 | $5.00 | $6.00 |
| 0021 | Incidental stone base (1220000000-E) | TON | 250 | $44.80 | $65.00 | $65.00 | $85.00 | $69.50 | $145.00 |
| 0022 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 1,400 | $4.48 | $7.50 | $7.50 | $13.79 | $14.25 | $24.25 |
| 0023 | Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E) | SY | 820 | $4.48 | $7.50 | $7.50 | $11.67 | $19.25 | $28.59 |
| 0024 | Incidental milling (1330000000-E) | SY | 100 | $11.20 | $7.50 | $7.50 | $54.57 | $38.00 | $45.50 |
| 0025 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 150 | $132.16 | $145.00 | $145.00 | $185.61 | $210.00 | $202.02 |
| 0026 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 150 | $134.40 | $145.00 | $145.00 | $180.30 | $210.00 | $202.02 |
| 0027 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 310 | $137.20 | $135.00 | $135.00 | $222.73 | $200.75 | $193.00 |
| 0028 | Asphalt binder for plant mix (1575000000-E) | TON | 35 | $590.00 | $600.00 | $600.00 | $636.36 | $624.75 | $601.00 |
| 0029 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 200 | $196.00 | $1.00 | $280.00 | $243.94 | $210.00 | $273.00 |
| 0030 | Reinforced endwalls (2220000000-E) | CY | 14.20 | $3,024.00 | $1,200.00 | $1,200.00 | $2,000.00 | $1,284.00 | $3,353.51 |
| 0031 | Masonry drainage structures (2286000000-N) | EACH | 6 | $4,200.00 | $2,200.00 | $2,200.00 | $2,700.00 | $2,354.00 | $10,158 |
| 0032 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 3 | $840.00 | $1,000.00 | $1,000.00 | $1,800.00 | $1,070.00 | $2,770.02 |
| 0033 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 2 | $840.00 | $1,000.00 | $1,000.00 | $1,800.00 | $1,070.00 | $2,665.33 |
| 0034 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $560.00 | $1,200.00 | $1,200.00 | $1,400.00 | $1,284.00 | $2,000.00 |
| 0035 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 630 | $50.40 | $45.00 | $45.00 | $50.07 | $48.25 | $45.00 |
| 0036 | 4" concrete sidewalk (2591000000-E) | SY | 470 | $67.20 | $60.00 | $60.00 | $80.28 | $64.25 | $60.00 |
| 0037 | Concrete curb ramps (2605000000-N) | EACH | 8 | $31.64 | $2,825.00 | $2,825.00 | $3,611.86 | $3,022.75 | $2,825.00 |
| 0038 | 6" concrete driveway (2612000000-E) | SY | 20 | $112.00 | $100.00 | $100.00 | $122.53 | $107.00 | $100.00 |
| 0039 | Steel beam guardrail (3030000000-E) | LF | 125 | $27.44 | $24.50 | $24.50 | $25.73 | $26.25 | $24.50 |
| 0040 | Additional guardrail posts (3150000000-N) | EACH | 5 | $12.32 | $0.01 | $11.00 | $11.55 | $11.75 | $11.00 |
| 0041 | GR anchor type ********** - (III, shop curved) (3180000000-N) | EACH | 2 | $3,192.00 | $2,850.00 | $2,850.00 | $2,992.50 | $3,049.50 | $2,850.00 |
| 0042 | Guardrail anchor units, type III (3215000000-N) | EACH | 1 | $2,632.00 | $2,350.00 | $2,350.00 | $2,467.50 | $2,514.50 | $2,350.00 |
| 0043 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 3 | $3,640.00 | $3,250.00 | $3,250.00 | $3,412.50 | $3,477.50 | $3,250.00 |
| 0044 | Generic fencing item (EA) - remove and reset bollards (3578000000-N) | EACH | 1 | $560.00 | $2,500.00 | $4,500.00 | $2,000.00 | $4,949.25 | $4,347.50 |
| 0045 | Rip rap, class I (3628000000-E) | TON | 15 | $112.00 | $100.00 | $100.00 | $93.00 | $107.00 | $165.00 |
| 0046 | Rip rap, class B (3649000000-E) | TON | 10 | $112.00 | $90.00 | $90.00 | $93.00 | $96.25 | $165.00 |
| 0047 | Geotextile for drainage (3656000000-E) | SY | 1,705 | $2.24 | $4.50 | $4.50 | $2.72 | $5.00 | $5.85 |
| 0048 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 212 | $8.12 | $9.00 | $7.25 | $8.93 | $9.00 | $8.50 |
| 0049 | Sign erection, type E (4102000000-N) | EACH | 10 | $336.00 | $75.00 | $300.00 | $105.00 | $107.00 | $100.00 |
| 0050 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 2 | $392.00 | $200.00 | $350.00 | $131.25 | $133.75 | $125.00 |
| 0051 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 6 | $280.00 | $75.00 | $250.00 | $131.25 | $133.75 | $125.00 |
| 0052 | Disposal of sign system, U-channel (4155000000-N) | EACH | 2 | $11.20 | $2.00 | $10.00 | $26.25 | $26.75 | $25.00 |
| 0053 | Disposal of support, U-channel (4192000000-N) | EACH | 8 | $11.20 | $2.00 | $10.00 | $26.25 | $26.75 | $25.00 |
| 0054 | Work zone signs (stationary) (4400000000-E) | SF | 1,320 | $8.96 | $20.00 | $8.00 | $7.35 | $7.50 | $7.00 |
| 0055 | Work zone signs (barricade mounted) (4410000000-E) | SF | 560 | $8.12 | $9.00 | $7.25 | $7.35 | $7.50 | $7.00 |
| 0056 | Portable changeable message sign (4420000000-N) | EACH | 5 | $10,024 | $9,500.00 | $8,950.00 | $8,500.00 | $1,345.25 | $8,493.38 |
| 0057 | Barricades (type III) (4445000000-E) | LF | 256 | $25.20 | $25.00 | $22.50 | $28.35 | $28.75 | $27.00 |
| 0058 | Pedestrian channelizing devices (4447000000-E) | LF | 882 | $28.56 | $75.00 | $25.50 | $28.35 | $29.00 | $60.50 |
| 0059 | Generic traffic control item (EA) - temporary curb ramps (4600000000-N) | EACH | 4 | $532.00 | $4,825.00 | $475.00 | $393.75 | $401.25 | $1,500.00 |
| 0060 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 1,093 | $3.08 | $2.75 | $2.75 | $2.89 | $3.00 | $2.75 |
| 0061 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 192 | $4.48 | $4.00 | $4.00 | $4.20 | $4.25 | $4.00 |
| 0062 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 121 | $16.80 | $15.00 | $15.00 | $15.75 | $16.00 | $15.00 |
| 0063 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 5 | $168.00 | $150.00 | $150.00 | $157.50 | $160.50 | $150.00 |
| 0064 | 4" cold appl plstic lines type ** - (II) (4770000000-E) | LF | 813 | $4.48 | $4.00 | $4.00 | $4.20 | $4.25 | $4.00 |
| 0065 | 8" cold appl plstic lines type ** - (II) (4780000000-E) | LF | 160 | $7.84 | $7.00 | $7.00 | $7.35 | $7.50 | $7.00 |
| 0066 | 8" cold appl plstic lines type ** - (IV) (4780000000-E) | LF | 80 | $28.00 | $25.00 | $25.00 | $26.25 | $26.75 | $25.00 |
| 0067 | 24" cold appl plstic line type ** - (II) (4795000000-E) | LF | 29 | $28.00 | $25.00 | $25.00 | $26.25 | $26.75 | $25.00 |
| 0068 | Cold appl plastic sym type ** - (II) (4805000000-N) | EACH | 4 | $560.00 | $500.00 | $500.00 | $525.00 | $535.00 | $500.00 |
| 0069 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 20 | $16.80 | $15.00 | $15.00 | $15.75 | $16.25 | $15.00 |
| 0070 | Temporary silt fence (6000000000-E) | LF | 1,725 | $4.20 | $2.25 | $2.25 | $3.19 | $3.75 | $2.25 |
| 0071 | Stone for erosion control, class A (6006000000-E) | TON | 150 | $1.00 | $80.00 | $80.00 | $106.27 | $85.75 | $124.79 |
| 0072 | Stone for erosion control, class B (6009000000-E) | TON | 80 | $1.00 | $75.00 | $75.00 | $111.48 | $80.25 | $165.00 |
| 0073 | Sediment control stone (6012000000-E) | TON | 485 | $1.00 | $0.01 | $70.00 | $104.48 | $75.00 | $115.00 |
| 0074 | Temporary mulching (6015000000-E) | ACRE | 1.50 | $1.00 | $1,500.00 | $1,500.00 | $1,575.00 | $1,979.50 | $1,500.00 |
| 0075 | Seed for temporary seeding (6018000000-E) | LB | 100 | $4.00 | $3.50 | $3.50 | $3.68 | $2.00 | $3.50 |
| 0076 | Fertilizer for temporary seeding (6021000000-E) | TON | 0.50 | $1.00 | $1,500.00 | $1,500.00 | $1,575.00 | $1,168.50 | $1,500.00 |
| 0077 | Temporary slope drains (6024000000-E) | LF | 200 | $1.00 | $14.00 | $14.00 | $42.27 | $15.00 | $31.49 |
| 0078 | Safety fence (6029000000-E) | LF | 1,460 | $2.35 | $1.50 | $1.50 | $2.89 | $3.25 | $1.50 |
| 0079 | Silt excavation (6030000000-E) | CY | 120 | $1.00 | $12.00 | $12.00 | $75.00 | $13.00 | $186.85 |
| 0080 | Matting for erosion control (6036000000-E) | SY | 3,000 | $2.74 | $1.35 | $1.35 | $1.42 | $2.00 | $1.35 |
| 0081 | Coir fiber mat (6037000000-E) | SY | 1,275 | $7.84 | $4.75 | $4.75 | $4.99 | $4.75 | $4.75 |
| 0082 | 1/4" hardware cloth (6042000000-E) | LF | 275 | $4.48 | $4.00 | $4.00 | $6.13 | $4.00 | $10.19 |
| 0083 | Floating turbidity curtain (6048000000-E) | SY | 160 | $28.00 | $35.00 | $12.84 | $41.90 | $93.00 | $67.50 |
| 0084 | Special stilling basins (6070000000-N) | EACH | 18 | $560.00 | $0.01 | $1,500.00 | $423.30 | $1,605.00 | $3,248.01 |
| 0085 | Coir fiber wattle (6071012000-E) | LF | 120 | $8.96 | $13.00 | $13.00 | $13.65 | $15.50 | $13.00 |
| 0086 | Seeding and mulching (6084000000-E) | ACRE | 1.50 | $3,220.00 | $2,875.00 | $2,875.00 | $3,018.75 | $5,296.50 | $2,875.00 |
| 0087 | Mowing (6087000000-E) | ACRE | 0.75 | $1.12 | $500.00 | $500.00 | $525.00 | $315.75 | $500.00 |
| 0088 | Seed for repair seeding (6090000000-E) | LB | 50 | $10.64 | $6.00 | $6.00 | $6.30 | $4.50 | $6.00 |
| 0089 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $560.00 | $1,300.00 | $1,300.00 | $1,365.00 | $1,168.50 | $1,300.00 |
| 0090 | Seed for supplemental seeding (6096000000-E) | LB | 50 | $8.96 | $5.75 | $5.75 | $6.04 | $5.25 | $5.75 |
| 0091 | Fertilizer topdressing (6108000000-E) | TON | 1 | $560.00 | $1,100.00 | $1,100.00 | $1,155.00 | $1,168.50 | $1,100.00 |
| 0092 | Impervious dike (6111000000-E) | LF | 70 | $28.00 | $50.00 | $305.27 | $100.00 | $59.75 | $94.60 |
| 0093 | Specialized hand mowing (6114500000-N) | MHR | 10 | $1.12 | $100.00 | $100.00 | $105.00 | $80.25 | $100.00 |
| 0094 | Response for erosion control (6117000000-N) | EACH | 25 | $1.12 | $1.00 | $1.00 | $1.05 | $107.00 | $1.00 |
| 0095 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,120.00 | $1,200.00 | $535.00 | $1,500.00 | $2,903.50 | $5,105.77 |
| 0096 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 27 | $112.00 | $175.00 | $200.00 | $250.00 | $352.75 | $89.38 |
| 0097 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 9 | $112.00 | $175.00 | $200.00 | $300.00 | $352.75 | $261.20 |
| 0098 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $1.12 | $750.00 | $428.00 | $525.00 | $1,217.25 | $532.69 |
| 0099 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 8 | $1,400.00 | $1,250.00 | $1,250.00 | $1,339.29 | $1,337.50 | $1,005.16 |
| 0100 | Signal cable (7060000000-E) | LF | 2,250 | $6.44 | $5.75 | $5.75 | $6.16 | $6.25 | $5.15 |
| 0101 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 8 | $1,512.00 | $1,350.00 | $1,350.00 | $1,446.43 | $1,444.50 | $1,474.23 |
| 0102 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 2 | $1,904.00 | $1,700.00 | $1,700.00 | $1,821.43 | $1,819.00 | $1,762.89 |
| 0103 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 20 | $44.80 | $40.00 | $40.00 | $42.86 | $43.00 | $61.86 |
| 0104 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 10 | $39.20 | $35.00 | $35.00 | $37.50 | $37.50 | $14.43 |
| 0105 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 150 | $15.68 | $14.00 | $14.00 | $15.00 | $15.00 | $15.46 |
| 0106 | Unpaved trench (***********) - (3, 2") (7300000000-E) | LF | 20 | $39.20 | $35.00 | $35.00 | $37.50 | $37.50 | $16.50 |
| 0107 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 157 | $44.80 | $40.00 | $40.00 | $42.86 | $43.00 | $51.55 |
| 0108 | Inductive loop sawcut (7444000000-E) | LF | 540 | $15.68 | $14.00 | $14.00 | $15.00 | $15.00 | $24.74 |
| 0109 | Lead-in cable (14-2) (7456100000-E) | LF | 1,750 | $3.30 | $2.95 | $2.95 | $3.16 | $3.25 | $3.09 |
| 0110 | Modify radio installation (7575142060-N) | EACH | 1 | $5,040.00 | $4,500.00 | $4,500.00 | $4,821.43 | $4,815.00 | $1,855.67 |
| 0111 | Metal pole with dual mast arm (7590000000-N) | EACH | 2 | $61,600 | $55,000 | $55,000 | $58,929 | $58,850 | $71,649 |
| 0112 | Soil test (7613000000-N) | EACH | 2 | $4,480.00 | $4,000.00 | $4,000.00 | $4,285.72 | $4,280.00 | $2,164.95 |
| 0113 | Drilled pier foundation (7614100000-E) | CY | 14 | $2,800.00 | $2,500.00 | $2,500.00 | $2,678.57 | $2,675.00 | $2,422.68 |
| 0114 | Mast arm with metal pole design (7631000000-N) | EACH | 2 | $560.00 | $500.00 | $500.00 | $535.72 | $535.00 | $154.64 |
| 0115 | Sign for signals (7636000000-N) | EACH | 3 | $728.00 | $650.00 | $650.00 | $696.43 | $695.50 | $876.29 |
| 0116 | Type I post with foundation (7642100000-N) | EACH | 2 | $3,920.00 | $3,500.00 | $3,500.00 | $3,750.00 | $3,745.00 | $1,752.58 |
| 0117 | Type II pedestal with foundation (7642200000-N) | EACH | 6 | $4,480.00 | $4,000.00 | $4,000.00 | $4,285.72 | $4,280.00 | $4,123.71 |
| 0118 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $2,800.00 | $2,500.00 | $2,500.00 | $2,678.57 | $2,675.00 | $3,092.78 |
| 0119 | Contlrs with CBNT (**************) - (type 2070LX, base mounted) (7696000000-N) | EACH | 1 | $30,240 | $27,000 | $27,000 | $28,929 | $28,890 | $30,412 |
| 0120 | Detector card (type 170) (7744000000-N) | EACH | 3 | $504.00 | $450.00 | $450.00 | $482.14 | $481.50 | $283.51 |
| 0121 | Cabinet base extender (7901000000-N) | EACH | 1 | $728.00 | $650.00 | $650.00 | $696.43 | $695.50 | $876.29 |
| 0122 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 1 | $16,800 | $15,000 | $15,000 | $16,071 | $16,050 | $14,021 |
| 0123 | Generic pavement marking item (EA) - 10' inlaid pavement markings (4894900000-E) | EACH | 21 | $225.00 | |||||
| 0127 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 21 | $225.00 | $225.00 | $225.00 | $236.25 | $240.75 | |
| 0128 | CM&R temp access *********** - (22+08.00 -L-) (8017000000-N) | LS | 1 | $336,000 | $484,600 | $980,000 | $400,000 | $1,000,000 | $348,950 |
| 0129 | Remv exist STR ****** BRG (402) - (22+08.00 -L-) (8035000000-N) | LS | 1 | $564,000 | $530,092 | $367,062 | $1,238,954 | $650,000 | $340,000 |
| 0130 | Asbestos assessment (8065000000-N) | LS | 1 | $2,800.00 | $1,950.00 | $2,000.00 | $1,995.00 | $2,033.00 | $1,900.00 |
| 0131 | **'-**" dia drilld piers - (4'-0") (8108000000-E) | LF | 914 | $879.20 | $982.55 | $630.00 | $780.00 | $890.00 | $773.00 |
| 0132 | Permanent steel casing for 4'-0" dia drilled pier (8111600000-E) | LF | 200 | $461.44 | $497.37 | $375.00 | $529.77 | $437.00 | $539.00 |
| 0133 | Sid inspections (8113000000-N) | EACH | 2 | $1,120.00 | $575.00 | $1,000.00 | $1,324.42 | $546.00 | $1,261.50 |
| 0134 | SPT testing (8114000000-N) | EACH | 2 | $1,120.00 | $575.00 | $1,000.00 | $3,178.61 | $546.00 | $3,027.50 |
| 0135 | CSL testing (8115000000-N) | EACH | 2 | $2,800.00 | $3,950.00 | $2,500.00 | $2,119.08 | $1,420.00 | $57,098 |
| 0136 | Uncl STR excav sta ***** - (22+08.00 -L-) (8121000000-N) | LS | 1 | $11,200 | $15,000 | $25,000 | $50,000 | $30,000 | $35,000 |
| 0137 | Reinforced concrete deck slab (8147000000-E) | SF | 17,131 | $45.27 | $55.25 | $58.00 | $47.00 | $42.50 | $70.00 |
| 0138 | Grooving bridge floors (8161000000-E) | SF | 12,895 | $0.52 | $0.86 | $0.78 | $1.60 | $0.70 | $0.52 |
| 0139 | Class A concrete (bridge) (8182000000-E) | CY | 229.90 | $1,064.00 | $1,050.16 | $2,150.00 | $1,300.00 | $1,700.00 | $1,725.00 |
| 0140 | BRG appr slab *********** - (22+08.00 -L-) (8210000000-N) | LS | 1 | $115,360 | $104,875 | $160,000 | $100,000 | $98,000 | $108,602 |
| 0141 | Reinforcing steel (bridge) (8217000000-E) | LB | 93,960 | $1.34 | $1.96 | $1.17 | $1.65 | $1.35 | $2.15 |
| 0142 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 25,138 | $2.16 | $3.62 | $1.90 | $2.51 | $1.94 | $2.91 |
| 0143 | Fib **" prestr conc girdr - (45") (8278000000-E) | LF | 2,260 | $411.04 | $413.45 | $400.00 | $400.00 | $366.50 | $540.00 |
| 0144 | Structural steel (8280000000-E) | LS | 1 | $67,245 | $66,400 | $110,000 | $65,000 | $75,000 | $110,000 |
| 0145 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 25 | $952.00 | $2,026.04 | $1,700.00 | $1,600.00 | $768.00 | $1,126.00 |
| 0146 | HP 12 X 53 steel piles (8364000000-E) | LF | 1,680 | $44.80 | $46.78 | $39.00 | $70.00 | $80.00 | $120.00 |
| 0147 | Pile redrives (8393000000-N) | EACH | 13 | $1.12 | $1.00 | $0.01 | $800.00 | $52.00 | $2,329.18 |
| 0148 | Dynamic pile testing (8394000000-N) | EACH | 2 | $3,360.00 | $1.00 | $2,500.00 | $1,995.00 | $2,033.00 | $6,504.06 |
| 0149 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 360 | $84.00 | $100.85 | $95.00 | $0.01 | $79.00 | $135.00 |
| 0150 | Geotextile for drainage (8622000000-E) | SY | 454 | $2.24 | $4.28 | $5.00 | $3.17 | $3.30 | $14.50 |
| 0151 | Elastomeric bearings (8657000000-N) | LS | 1 | $14,560 | $15,900 | $15,000 | $50,000 | $50,000 | $70,000 |
| 0152 | Foam joint seals (8692000000-N) | LS | 1 | $8,400.00 | $22,250 | $40,000 | $16,000 | $23,500 | $32,000 |
| 0153 | Elec conduit sys ******** - (22+08.00 -L-) (8734000000-N) | LS | 1 | $61,600 | $55,000 | $87,000 | $58,929 | $58,000 | $46,960 |
| 0154 | Generic structure item (LF) - classic concrete bridge rail (8867000000-E) | LF | 591.01 | $407.68 | $532.28 | $820.00 | $575.00 | $508.00 | $567.74 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of November 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.