Smith-Rowe, LLC: NCDOT bid record
Smith-Rowe, LLC submitted 240 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 93 of them (39%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $475,481,658
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 46 | 17 | 37% |
| 2014 | 21 | 10 | 48% |
| 2015 | 20 | 2 | 10% |
| 2016 | 19 | 5 | 26% |
| 2017 | 15 | 4 | 27% |
| 2018 | 15 | 3 | 20% |
| 2019 | 3 | 2 | 67% |
| 2020 | 6 | 1 | 17% |
| 2021 | 14 | 10 | 71% |
| 2022 | 14 | 7 | 50% |
| 2023 | 16 | 5 | 31% |
| 2024 | 14 | 9 | 64% |
| 2025 | 24 | 14 | 58% |
| 2026 | 13 | 4 | 31% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rockingham | 27 | 17 | 63% |
| Guilford | 15 | 5 | 33% |
| Forsyth | 13 | 5 | 38% |
| Wilkes | 12 | 3 | 25% |
| Davidson | 10 | 4 | 40% |
| Columbus | 10 | 3 | 30% |
| Alamance | 8 | 2 | 25% |
| Cabarrus | 7 | 0 | 0% |
| Robeson | 7 | 2 | 29% |
| Surry | 6 | 6 | 100% |
| Randolph | 6 | 1 | 17% |
| Stanly | 5 | 3 | 60% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Additional guardrail posts | 3150000000-N | EACH | 186 | 171 (92%) | $1.00 | $13.00 |
| Temporary silt fence | 6000000000-E | LF | 213 | 126 (59%) | $2.15 | $2.63 |
| Disposal of sign system, U-channel | 4155000000-N | EACH | 155 | 126 (81%) | $2.00 | $5.00 |
| Asphalt binder for plant mix | 1575000000-E | TON | 212 | 122 (58%) | $624.00 | $595.00 |
| Seed for temporary seeding | 6018000000-E | LB | 204 | 121 (59%) | $2.75 | $3.00 |
| 1/4" hardware cloth | 6042000000-E | LF | 207 | 117 (57%) | $4.00 | $4.50 |
| Matting for erosion control | 6036000000-E | SY | 212 | 113 (53%) | $1.50 | $1.75 |
| Seed for supplemental seeding | 6096000000-E | LB | 212 | 108 (51%) | $3.21 | $4.50 |
| Seed for repair seeding | 6090000000-E | LB | 203 | 105 (52%) | $3.55 | $5.50 |
| Seeding and mulching | 6084000000-E | ACRE | 209 | 104 (50%) | $2,150.00 | $2,365.00 |
| Temporary mulching | 6015000000-E | ACRE | 207 | 100 (48%) | $950.00 | $1,100.00 |
| Mowing | 6087000000-E | ACRE | 193 | 97 (50%) | $100.00 | $150.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 148 | 29 of 148 |
| Blythe Construction Inc | 69 | 11 of 69 |
| Caton Construction Group Inc | 55 | 3 of 55 |
| Dellinger, Inc. | 53 | 15 of 53 |
| W C English Incorporated | 52 | 3 of 52 |
| S T Wooten Corporation | 47 | 22 of 47 |
| R.E. Burns & Sons Co., Inc. | 44 | 15 of 44 |
| Sanford Contractors Inc | 34 | 11 of 34 |
| Blythe Development Co. | 33 | 9 of 33 |
| FSC II LLC DBA Fred Smith Company | 31 | 10 of 31 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205207 | Pender | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #700037 OVER ANGOLA CREEK ON NC-53 | 2 of 5 | $6,997,361 | +9.0% |
| 15 SEP 2026 | C205214 | Wilkes | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #960029 OVER CUB CREEK ON SR-1001 (OAKW | 3 of 5 | $6,814,189 | +5.0% |
| 18 AUG 2026 | C205202 | Guilford | BRIDGE PRESERVATION., GRADING, DRAINAGE, PAVING, AND CULVERT. BRIDGE #400052 OVER DEEP RIVER TRIBUTARY 1 ON SR-1332 (SCIENTIFIC ST) | 5 of 5 | $5,549,943 | +9.0% |
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 3 of 8 | $2,072,465 | +11% |
| 18 AUG 2026 | C205070 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-120 | 4 of 9 | $7,772,239 | +10% |
| 21 JUL 2026 | C205194 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780177 OVER MATRIMONY CREEK ON SR-1535 (PRICE RD) | 1 of 5 | $3,486,174 | Low, 11% under the second |
| 16 JUN 2026 | C205160 | Forsyth | GRADING DRAINAGE, PAVING, SIGNALS AND STRUCTURE., GRADING DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #330289 OVER US-52 ON SR-4000 | 2 of 5 | $19,448,967 | +2.0% |
| 16 JUN 2026 | C205186 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS | 2 of 6 | $12,882,619 | +5.0% |
| 19 MAY 2026 | C204733 | Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #980029 OVER I-77 ON US-21 BUS | 2 of 4 | $18,650,521 | +13% |
| 17 MAR 2026 | C205164 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION. BRIDGE #990165, BRIDGE #990116 & BRIDGE #990234 | 1 of 2 | $8,252,638 | Low, 20% under the second |
| 17 FEB 2026 | C204936 | Alamance | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STURCTURES. BRIDGE #000014 OVER CANE CREEK ON NC-87 | 2 of 7 | $7,776,815 | +1.0% |
| 20 JAN 2026 | C205129 | Pamlico | GRADING, DRAINAGE, PAVING AND STRUCTURE. BRIDGE #680078 OVER NEUSE RIVER ON NC-306 | 1 of 2 | $4,333,322 | Low, 19% under the second |
| 20 JAN 2026 | C205128 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780176 OVER NC-14/NC-87 ON SR-1700 (FISHER HILL RD) | 1 of 3 | $2,987,609 | Low, 18% under the second |
| 16 DEC 2025 | C205018 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. UPGRADE FUTURE I-73/US-220 AT US-311/NC-135 INTERCHANGE AND REPLACE BRIDGE #780074 | 1 of 6 | $18,156,837 | Low, 10% under the second |
| 16 DEC 2025 | C205071 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780163 OVER HOGAN'S CREEK ON US-158 | 1 of 3 | $4,537,082 | Low, 13% under the second |
| 16 DEC 2025 | C205141 | Rutherford | BRIDGE REPLACEMENT. (EXPRESS DESIGN BUILD). BRIDGE #800036 OVER SECOND BROAD RIVER ON US-74 BUSINESS | 1 of 5 | $5,350,016 | Low, 25% under the second |
| 18 NOV 2025 | C205069 | Robeson | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #770175 OVER LUMBER RIVER ON SR-1600 | 2 of 6 | $6,826,205 | +4.0% |
| 18 NOV 2025 | C205044 | Surry, Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | 1 of 6 | $16,781,818 | Low, 2.0% under the second |
| 21 OCT 2025 | C205116 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780183 OVER US-29 BYP ON US-29 BUS | 1 of 4 | $4,612,861 | Low, 6.0% under the second |
| 21 OCT 2025 | C205133 | Mitchell | ROADWAY AND CULVERT. (EXPRESS DESIGN BUILD), ROADWAY AND STRUCTURE. (EXPRESS DESIGN BUILD). BRIDGE ON CANE CRK ON SR-1207, BRIDGE OVER BIG R | 1 of 3 | $5,739,801 | Low, 6.0% under the second |
| 16 SEP 2025 | C205099 | Surry | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-89 (WEST PINE ST) AT SR-1397 (ROUND PEAK CHURCH RD) INTERSECTION | 1 of 4 | $7,490,894 | Low, 9.0% under the second |
| 19 AUG 2025 | C204829 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #780140 OVER DAN RIVER ON SR-1138 | 3 of 4 | $15,268,472 | +18% |
| 19 AUG 2025 | C204991 | Mecklenburg | BRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK | 2 of 6 | $7,952,085 | +17% |
| 19 AUG 2025 | C204956 | Burke, Caldwell | DRAINAGE, GRADING, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #110010 OVER CATAWBA RIVER ON SR-1001 (CONNELL | 2 of 3 | $31,044,546 | +1.0% |
| 15 JUL 2025 | C205074 | Forsyth | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-65 (BETHANIA-RURAL HALL RD) FROM US-52 TO SR-3983 (NORTHRIDGE PARK DR) | 7 of 7 | $13,916,173 | +12% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.