NCDOT letting results, August 19, 2025
9 contracts let by North Carolina DOT on August 19, 2025, $134,381,802 in low bids, a median of 5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 9
- Low bids, total
- $134,381,802
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204975 | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. I-40/US-311 AT NC-109 INTERCHANGE | Forsyth | 3 | Blythe Construction Inc | $38,891,435 | $43,525,295 | +12% | NCDOT |
| C204956 | DRAINAGE, GRADING, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #110010 OVER CATAWBA RIVER ON SR-1001 (CONNELLY SPRINGS RD) | Burke, Caldwell | 3 | Balfour Beatty Infrastructure Inc | $30,874,733 | $31,044,546 | +1.0% | NCDOT |
| C205076 | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. SR-1102 (GILL | Cumberland, Hoke | 5 | Highland Paving Co LLC | $17,747,428 | $18,323,698 | +3.0% | NCDOT |
| C204829 | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #780140 OVER DAN RIVER ON SR-1138 | Rockingham | 4 | Blythe Construction Inc | $12,940,824 | $13,560,000 | +5.0% | NCDOT |
| C205121 | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS., GRADING, DRAINAGE, PAVING. NC-9 FROM 2700' NORTH OF THE US 74A / NC-9 INTERSECT | Henderson | 5 | Ipc Paving LLC DBA Ipc Structures LLC | $11,755,058 | $13,136,528 | +12% | NCDOT |
| C205039 | GRADING, DRAINAGE, AND PAVING. SR-3174 (IDLEWILD RD) FROM SR-3175 (STALLINGS RD) TO I-485 | Mecklenburg | 7 | J. T. Russell & Sons, Inc. | $8,676,763 | $8,957,743 | +3.0% | NCDOT |
| C204991 | BRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK ON SR-5469 (SHOPTON | Mecklenburg | 6 | Blythe Development Co. | $6,807,682 | $7,952,085 | +17% | NCDOT |
| C204832 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #630036 OVER FISHING CREEK ON NC-561 | Nash, Halifax | 7 | S T Wooten Corporation | $4,253,880 | $4,263,300 | 0.0% | NCDOT |
| C204977 | BRIDGE REHABILITATION. BRIDGE #170091 OVER THE CATAWBA RIVER ON NC-127 AND BRIDGE #170139 OVER THE CATAWBA RIVER ON NC-16 | Catawba, Alexander | 3 | American Civil Constructors West Coast LLC | $2,434,000 | $2,468,688 | +1.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.