Ipc Paving LLC DBA Ipc Structures LLC: NCDOT bid record
Ipc Paving LLC DBA Ipc Structures LLC submitted 10 bids on North Carolina DOT contracts in the data, from 17 JAN 2023 to 18 AUG 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $18,037,542
- Latest bid
- 18 AUG 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 0 | 0% |
| 2025 | 4 | 1 | 25% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Jackson | 2 | 1 | 50% |
| Rutherford | 2 | 0 | 0% |
| Buncombe | 2 | 0 | 0% |
| Haywood | 1 | 0 | 0% |
| Henderson | 1 | 1 | 100% |
| Madison | 1 | 0 | 0% |
| Mitchell | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone signs (barricade mounted) | 4410000000-E | SF | 9 | 7 (78%) | $6.75 | $7.50 |
| Work zone signs (stationary) | 4400000000-E | SF | 8 | 7 (88%) | $7.12 | $7.25 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 8 | 7 (88%) | $0.82 | $0.27 |
| Asphalt binder for plant mix | 1575000000-E | TON | 10 | 6 (60%) | $690.00 | $595.00 |
| Matting for erosion control | 6036000000-E | SY | 8 | 6 (75%) | $1.98 | $1.75 |
| Additional guardrail posts | 3150000000-N | EACH | 8 | 6 (75%) | $25.50 | $13.00 |
| Steel beam guardrail | 3030000000-E | LF | 8 | 6 (75%) | $25.00 | $24.00 |
| Guardrail anchor units, type III | 3215000000-N | EACH | 7 | 6 (86%) | $2,400.00 | $1,600.00 |
| Steel beam guardrail, shop curved | 3045000000-E | LF | 6 | 6 (100%) | $29.50 | $21.78 |
| Incidental milling | 1330000000-E | SY | 9 | 5 (56%) | $25.00 | $12.00 |
| Temporary mulching | 6015000000-E | ACRE | 8 | 5 (63%) | $1,550.00 | $1,100.00 |
| Fertilizer for repair seeding | 6093000000-E | TON | 8 | 5 (63%) | $1,750.00 | $1,110.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| NHM Constructors, LLC | 7 | 4 of 7 |
| Kemp Sigmon Construction Co Inc | 5 | 4 of 5 |
| Wright Brothers Construction Company Inc | 5 | 1 of 5 |
| Dane Construction, Inc. | 3 | 1 of 3 |
| Mountain Creek Contractors Inc | 3 | 1 of 3 |
| Buckeye Bridge LLC | 2 | 0 of 2 |
| Caton Construction Group Inc | 2 | 0 of 2 |
| American Civil Constructors West Coast LLC | 2 | 2 of 2 |
| Saffo Contractors Inc | 2 | 1 of 2 |
| American Contracting & Services Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 6 of 8 | $2,563,774 | +37% |
| 21 OCT 2025 | C205011 | Buncombe | BRIDGE PRESERVATION. BRIDGE #100007 OVER FRENCH BROAD RIVER/NSRR ON SR-1620 (FLETCHER MARTIN RD) | 6 of 7 | $5,158,235 | +50% |
| 19 AUG 2025 | C205121 | Henderson | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS., GRADING, DRAINAGE, PAVING. NC-9 FROM 2700' NORTH OF THE US | 1 of 5 | $11,755,058 | Low, 12% under the second |
| 17 JUN 2025 | C204454 | Buncombe | BRIDGE REHABILITATION. BRIDGE #76 OVER SR-3556 ON US-25, AND BRIDGES #53 & #278 OVER FRENCH BROAD RIVER ON NC-146 & SR-1348 | 3 of 7 | $4,749,558 | +15% |
| 18 FEB 2025 | C204883 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #800040 OVER NORTH FORK FIRST BROAD CREEK ON NC-226 | 3 of 6 | $7,358,244 | +32% |
| 20 AUG 2024 | C204925 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430095 OVER SOUTHERN RAILROAD ON US-74 | 4 of 7 | $19,151,325 | +8.0% |
| 16 JAN 2024 | C204828 | Jackson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #32 OVER SAVANNAH CREEK ON NC-116 | 2 of 5 | $6,334,719 | +18% |
| 18 JUL 2023 | C204715 | Jackson | Grading, drainage, paving, and structure., grading, drainage, paving, bike lanes, and sidewalk. SR-1336 FROM N OF SR-1002 TO N OF SR-1337 AN | 1 of 6 | $6,282,484 | Low, 3.0% under the second |
| 20 JUN 2023 | C204491 | Mitchell | Grading, drainage, paving, and structures. BRIDGE #19 OVER CUB CREEK ON NC-226. | 3 of 5 | $4,238,736 | +42% |
| 17 JAN 2023 | C204768 | Madison | Grading, drainage, paving, and structure. BRIDGE #71 OVER BIG LAUREL CREEK ON SR-1395 | 5 of 5 | $6,273,396 | +14% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.