NCDOT contract C204454 bid tabulation
BRIDGE REHABILITATION. BRIDGE #76 OVER SR-3556 ON US-25, AND BRIDGES #53 & #278 OVER FRENCH BROAD RIVER ON NC-146 & SR-1348. Let by North Carolina DOT on June 17, 2025, Buncombe. 7 bids received; low bid $4,121,385 by Freyssinet Inc.
- Owner
- North Carolina DOT
- Letting
- 17 JUN 2025
- Pay items
- 51
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Freyssinet Inc | $4,121,385 | Low |
| 2 | American Civil Constructors West Coast LLC | $4,343,000 | +5.0% |
| 3 | Ipc Paving LLC DBA Ipc Structures LLC | $4,749,558 | +15% |
| 4 | Saffo Contractors Inc | $5,042,831 | +22% |
| 5 | American Contracting & Services Inc | $5,092,109 | +24% |
| 6 | Lanford Brothers Co., Inc. | $5,153,053 | +25% |
| 7 | Mountain Creek Contractors Inc | $5,542,238 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Freyssinet Inc | 2. American Civil Constructors West Coast LLC | 3. Ipc Paving LLC DBA Ipc Structures LLC | 4. Saffo Contractors Inc | 5. American Contracting & Services Inc | 6. Lanford Brothers Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $153,000 | $215,000 | $237,000 | $252,525 | $500,000 | $315,000 |
| 0002 | Incidental milling (1330000000-E) | SY | 134 | $96.00 | $60.00 | $8.95 | $65.00 | $52.00 | $45.00 |
| 0003 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 11 | $640.00 | $1,200.00 | $845.00 | $1,015.00 | $845.00 | $1,000.00 |
| 0004 | Asphalt binder for plant mix (1575000000-E) | TON | 1 | $790.00 | $1,000.00 | $660.00 | $800.00 | $660.00 | $1,500.00 |
| 0005 | Work zone signs (stationary) (4400000000-E) | SF | 465 | $11.00 | $8.00 | $6.75 | $9.00 | $15.00 | $12.00 |
| 0006 | Work zone signs (portable) (4405000000-E) | SF | 640 | $13.00 | $14.00 | $42.80 | $11.00 | $20.00 | $36.00 |
| 0007 | Work zone signs (barricade mounted) (4410000000-E) | SF | 145 | $13.00 | $7.00 | $6.50 | $10.00 | $15.00 | $40.00 |
| 0008 | Flashing arrow board (4415000000-N) | EACH | 3 | $2,560.00 | $2,000.00 | $4,784.60 | $2,040.00 | $3,500.00 | $4,500.00 |
| 0009 | Portable changeable message sign (4420000000-N) | EACH | 3 | $9,340.00 | $9,000.00 | $8,900.00 | $7,440.00 | $12,000 | $10,000 |
| 0010 | Drums (4430000000-N) | EACH | 870 | $69.00 | $45.00 | $62.00 | $56.00 | $45.00 | $45.00 |
| 0011 | Barricades (type III) (4445000000-E) | LF | 80 | $38.00 | $25.00 | $32.00 | $30.00 | $50.00 | $75.00 |
| 0012 | Pedestrian channelizing devices (4447000000-E) | LF | 16 | $83.00 | $25.00 | $162.00 | $66.00 | $100.00 | $1,000.00 |
| 0013 | Flagger (4455000000-N) | DAY | 90 | $345.00 | $600.00 | $700.00 | $1,000.00 | $900.00 | $3,000.00 |
| 0014 | TMA (4480000000-N) | EACH | 3 | $16,300 | $18,000 | $29,000 | $4,320.00 | $30,000 | $10,000 |
| 0015 | Law enforcement (4510000000-N) | HR | 240 | $75.00 | $80.00 | $75.00 | $80.00 | $85.00 | $95.00 |
| 0016 | Skinny drum (4516000000-N) | EACH | 25 | $53.00 | $27.00 | $96.00 | $42.00 | $55.00 | $45.00 |
| 0017 | Paint pavement marking lines (4") (4810000000-E) | LF | 9,000 | $3.00 | $3.00 | $1.00 | $3.00 | $2.00 | $2.50 |
| 0018 | Paint pavement marking lines (8") (4820000000-E) | LF | 100 | $4.50 | $14.00 | $2.50 | $14.00 | $11.20 | $4.00 |
| 0019 | Paint pavement marking lines (24") (4835000000-E) | LF | 100 | $23.00 | $16.00 | $5.50 | $15.00 | $12.50 | $8.00 |
| 0020 | 7' U-channel posts (4915000000-E) | EACH | 70 | $63.00 | $175.00 | $49.00 | $722.00 | $45.00 | $600.00 |
| 0021 | Portable lighting (5255000000-N) | LS | 1 | $60,000 | $29,269 | $450,000 | $50,000 | $120,000 | $10,000 |
| 0022 | Generic miscellaneous item (day) - railroad contractor protective services (0000820000-N) | DAY | 120 | $708.30 | $1,800.00 | $2,475.00 | $2,000.00 | $2,000.00 | $2,200.00 |
| 0023 | Grooving bridge floors (8161000000-E) | SF | 16,834 | $2.00 | $2.00 | $1.25 | $0.68 | $1.00 | $4.00 |
| 0024 | Epoxy coated reinforcing steel (bridge) (8224000000-E) | LB | 4,796 | $5.00 | $6.00 | $17.50 | $4.05 | $5.00 | $5.00 |
| 0025 | Pollution control (8296000000-N) | LS | 1 | $7,530.00 | $40,000 | $5,000.00 | $5,000.00 | $5,000.00 | $50,000 |
| 0026 | Class II, surface preparation (8559000000-E) | SY | 80.80 | $320.00 | $300.00 | $268.00 | $2,000.00 | $300.00 | $350.00 |
| 0027 | Concrete repairs (8660000000-E) | CF | 1.60 | $905.00 | $1,800.00 | $2,300.00 | $2,500.00 | $2,000.00 | $1,000.00 |
| 0028 | Shotcrete repairs (8664000000-E) | CF | 103.50 | $625.00 | $1,000.00 | $1,185.00 | $2,500.00 | $1,000.00 | $1,000.00 |
| 0029 | Epoxy resin injection (8678000000-E) | LF | 66 | $80.00 | $225.00 | $200.00 | $150.00 | $150.00 | $150.00 |
| 0030 | Generic structure item (LS) - bridge drainage cleanout and repair (8860000000-N) | LS | 1 | $8,530.00 | $15,000 | $69,000 | $30,000 | $50,000 | $35,000 |
| 0031 | Generic structure item (LS) - cleaning and repainting of bridge #100278 (8860000000-N) | LS | 1 | $390,000 | $390,000 | $393,000 | $375,000 | $290,000 | $520,000 |
| 0032 | Generic structure item (LS) - molded rubber segmental expansion joint (8860000000-N) | LS | 1 | $500,000 | $300,000 | $410,000 | $440,000 | $355,000 | $500,000 |
| 0033 | Generic structure item (LS) - painting containment for bridge #100278 (8860000000-N) | LS | 1 | $470,000 | $150,000 | $230,000 | $425,000 | $340,000 | $250,000 |
| 0034 | Generic structure item (LF) - expansion joint seals for preservation (8867000000-E) | LF | 84 | $28.00 | $250.00 | $1,120.00 | $400.00 | $625.00 | $1,200.00 |
| 0035 | Generic structure item (LF) - foam joint seals for preservation (8867000000-E) | LF | 623 | $74.00 | $70.00 | $157.00 | $95.00 | $140.00 | $200.00 |
| 0036 | Generic structure item (LF) - strip seals for preservation (8867000000-E) | LF | 99.70 | $552.00 | $900.00 | $1,545.00 | $451.00 | $1,300.00 | $2,000.00 |
| 0037 | Generic structure item (CY) - latex modified concrete overlay - very early strength (8881000000-E) | CY | 114.30 | $1,925.00 | $1,050.00 | $1,075.00 | $2,255.00 | $1,620.00 | $1,750.00 |
| 0038 | Generic structure item (CF) - elastomeric concrete for preservation (8882000000-E) | CF | 154.50 | $510.00 | $450.00 | $780.00 | $524.00 | $725.00 | $1,200.00 |
| 0039 | Generic structure item (LB) - beam repair plating (8889000000-E) | LB | 1,172 | $94.00 | $240.00 | $83.00 | $300.00 | $150.00 | $115.00 |
| 0040 | Generic structure item (SF) - bridge joint demolition (8892000000-E) | SF | 551 | $71.00 | $100.00 | $172.00 | $85.00 | $50.00 | $80.00 |
| 0041 | Generic structure item (SF) - concrete deck repair for silane deck treatment (8892000000-E) | SF | 19 | $265.00 | $500.00 | $725.00 | $970.00 | $90.00 | $500.00 |
| 0042 | Generic structure item (SF) - concrete work for joint replacement (8892000000-E) | SF | 499 | $340.70 | $400.00 | $508.00 | $110.00 | $475.00 | $200.00 |
| 0043 | Generic structure item (SF) - concrete work for median replacement (8892000000-E) | SF | 527 | $341.60 | $90.00 | $53.00 | $100.00 | $100.00 | $275.00 |
| 0044 | Generic structure item (SF) - epoxy coating (8892000000-E) | SF | 605.50 | $11.00 | $30.00 | $32.00 | $10.00 | $7.00 | $50.00 |
| 0045 | Generic structure item (SF) - modular joint repair (8892000000-E) | SF | 1,043 | $326.00 | $475.00 | $375.00 | $90.00 | $425.00 | $250.00 |
| 0046 | Generic structure item (SY) - hydro-demolition of bridge deck (8893000000-E) | SY | 2,055 | $146.00 | $80.00 | $103.00 | $225.00 | $110.00 | $80.00 |
| 0047 | Generic structure item (SY) - placing & finishing of latex modified concrete overlay - very early strength (8893000000-E) | SY | 2,055 | $92.50 | $185.00 | $75.00 | $120.00 | $110.00 | $95.00 |
| 0048 | Generic structure item (SY) - scarifying bridge deck (8893000000-E) | SY | 2,055 | $47.00 | $45.00 | $16.00 | $30.00 | $30.00 | $42.00 |
| 0049 | Generic structure item (SY) - shotblasting bridge deck (8893000000-E) | SY | 15,037 | $1.00 | $7.50 | $5.55 | $15.00 | $25.00 | $8.00 |
| 0050 | Generic structure item (SY) - silane deck treatment (8893000000-E) | SY | 15,037 | $7.50 | $13.50 | $4.80 | $15.00 | $15.00 | $18.00 |
| 0051 | Generic structure item (EA) - cleaning and painting existing bearings with high ratio calcium sulfonate (8897000000-N) | EACH | 80 | $687.50 | $1,200.00 | $308.00 | $1,500.00 | $500.00 | $700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way