Mountain Creek Contractors Inc: NCDOT bid record
Mountain Creek Contractors Inc submitted 59 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 18 AUG 2026, and was the low bidder on 19 of them (32%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $136,976,804
- Latest bid
- 18 AUG 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 8 | 2 | 25% |
| 2015 | 7 | 3 | 43% |
| 2016 | 9 | 3 | 33% |
| 2017 | 2 | 1 | 50% |
| 2018 | 2 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2022 | 3 | 2 | 67% |
| 2023 | 8 | 4 | 50% |
| 2024 | 6 | 0 | 0% |
| 2025 | 9 | 2 | 22% |
| 2026 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Buncombe | 4 | 0 | 0% |
| Guilford | 3 | 0 | 0% |
| Haywood | 3 | 1 | 33% |
| New Hanover | 2 | 1 | 50% |
| Mitchell, Yancey | 2 | 2 | 100% |
| Ashe | 2 | 0 | 0% |
| Henderson | 2 | 1 | 50% |
| Rockingham | 2 | 0 | 0% |
| Graham | 2 | 1 | 50% |
| Transylvania | 2 | 2 | 100% |
| Jackson | 2 | 0 | 0% |
| Wake | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder for plant mix | 1575000000-E | TON | 45 | 25 (56%) | $641.75 | $595.00 |
| Work zone signs (portable) | 4405000000-E | SF | 35 | 25 (71%) | $8.85 | $11.02 |
| Barricades (type III) | 4445000000-E | LF | 41 | 24 (59%) | $24.00 | $24.30 |
| Coir fiber mat | 6037000000-E | SY | 32 | 23 (72%) | $5.25 | $5.75 |
| Safety fence | 6029000000-E | LF | 36 | 22 (61%) | $2.00 | $2.20 |
| Temporary mulching | 6015000000-E | ACRE | 35 | 21 (60%) | $1,344.83 | $1,100.00 |
| Additional guardrail posts | 3150000000-N | EACH | 32 | 21 (66%) | $11.00 | $13.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 44 | 20 (45%) | $7.17 | $7.25 |
| Seed for temporary seeding | 6018000000-E | LB | 35 | 20 (57%) | $3.50 | $3.00 |
| Seed for supplemental seeding | 6096000000-E | LB | 35 | 20 (57%) | $5.00 | $4.50 |
| Silt excavation | 6030000000-E | CY | 34 | 20 (59%) | $8.00 | $9.62 |
| 1/4" hardware cloth | 6042000000-E | LF | 36 | 19 (53%) | $4.75 | $4.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 13 | 3 of 13 |
| NHM Constructors, LLC | 12 | 2 of 12 |
| Crowder Construction Company | 9 | 3 of 9 |
| Blythe Development Co. | 9 | 2 of 9 |
| American Contracting & Services Inc | 8 | 5 of 8 |
| Buckeye Bridge LLC | 8 | 3 of 8 |
| D.H. Griffin Infrastructure, LLC | 8 | 2 of 8 |
| James R Vannoy & Sons Construction Company Inc | 7 | 3 of 7 |
| American Civil Constructors West Coast LLC | 6 | 5 of 6 |
| Smith-Rowe, LLC | 6 | 3 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 AUG 2026 | C205202 | Guilford | BRIDGE PRESERVATION., GRADING, DRAINAGE, PAVING, AND CULVERT. BRIDGE #400052 OVER DEEP RIVER TRIBUTARY 1 ON SR-1332 (SCIENTIFIC ST) | 3 of 5 | $5,157,444 | +1.0% |
| 21 APR 2026 | C205180 | Henderson | GRADING, DRAINAGE, PAVING, AND CULVERT., GRADING, DRAINAGE, PAVING, AND RETAINING WALL., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SIT | 1 of 2 | $19,403,469 | Low, 23% under the second |
| 21 OCT 2025 | C205011 | Buncombe | BRIDGE PRESERVATION. BRIDGE #100007 OVER FRENCH BROAD RIVER/NSRR ON SR-1620 (FLETCHER MARTIN RD) | 4 of 7 | $4,790,841 | +39% |
| 21 OCT 2025 | C205111 | Mitchell, Yancey | ROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD), ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). CULVERT #600050 ON SR-120 | 1 of 2 | $7,471,434 | Low, 5.0% under the second |
| 16 SEP 2025 | C204836 | Clay | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. US-64 BUSINESS FROM US-64 TO SR-1307 (MAIN ST) | 2 of 3 | $17,985,706 | +8.0% |
| 19 AUG 2025 | C204977 | Catawba, Alexander | BRIDGE REHABILITATION. BRIDGE #170091 OVER THE CATAWBA RIVER ON NC-127 AND BRIDGE #170139 OVER THE CATAWBA RIVER ON NC-16 | 3 of 3 | $3,355,302 | +38% |
| 17 JUN 2025 | C204454 | Buncombe | BRIDGE REHABILITATION. BRIDGE #76 OVER SR-3556 ON US-25, AND BRIDGES #53 & #278 OVER FRENCH BROAD RIVER ON NC-146 & SR-1348 | 7 of 7 | $5,542,238 | +34% |
| 17 JUN 2025 | C205015 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | 4 of 8 | $19,985,015 | +10% |
| 15 APR 2025 | C204567 | Ashe | BRIDGE PRESERVATION. BRIDGES #040032 ON NC-194, #040507 ON SR-1644, #040478 ON SR-1514, AND #040019 ON NC-194 | 2 of 8 | $6,248,004 | +9.0% |
| 18 MAR 2025 | C205030 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990173 OVER MIDDLE CREEK ON SR-1159, AND BRIDGE #990156 OVER COLBERT CREEK O | 2 of 3 | $4,293,000 | +41% |
| 21 JAN 2025 | C205024 | Mitchell, Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #600123 OVER CHARLES CRK ON SR-1345, BRG #600154 OVER CANE CRK ON SR-1188, BRG # | 1 of 3 | $7,600,000 | Low, 35% under the second |
| 17 DEC 2024 | C204821 | Guilford | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AN | 3 of 5 | $20,916,292 | +18% |
| 19 NOV 2024 | C204942 | New Hanover | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-2048 (GORDON RD) FROM US-17 (MARKET ST) TO I-40 | 2 of 5 | $53,559,830 | +5.0% |
| 18 JUN 2024 | C204455 | Chatham, Moore | BRIDGE PRESERVATION. BRIDGES #180007, #180477, #620049, AND #620072 OVER THE DEEP RIVER ON US-1 SOUTH, SR-1621, AND NC-22 | 4 of 6 | $7,083,878 | +11% |
| 28 MAY 2024 | C204796 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGES #248 AND #249 OVER SR-1613 (BEAVERDAM RD) ON I-40 | 5 of 5 | $39,996,488 | +21% |
| 16 APR 2024 | C204921 | Guilford | BRIDGE REHABILITATION AND BRIDGE PRESERVATION. I-40 EAST OF US-220 (FREEMAN MILL ROAD) TO EAST OF SR-3037/SR-4240 (EAST GATE CITY BOULEVARD) | 2 of 3 | $9,117,325 | +28% |
| 16 APR 2024 | C204208 | Surry | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGES #122 AND #126 OVER TOMS CREEK ON US-52 | 4 of 4 | $18,651,000 | +43% |
| 21 NOV 2023 | C204904 | Transylvania | Grading, drainage, paving, signals, and culvert. INTERSECTIONS OF US-64 / US-276 (HENDERSONVILLE HWY), AND US-64 / NC-280 (ASHEVILLE HWY). | 1 of 4 | $20,388,187 | Low, 9.0% under the second |
| 17 OCT 2023 | C204488 | Cherokee | Bridge preservation. BRIDGE #190009 AND #190010 OVER NOTTELY RIVER AND GRAVEL RD ON US-64 & US-74. | 3 of 7 | $4,193,745 | +40% |
| 15 AUG 2023 | C204462 | Wake, Durham | Bridge preservation. BRGS #306 OVER I-40 ON SR-1118, #39 OVER CRABTREE CRK ON SR-2517, AND #83 OVER US-1 & #84 OVER RICHLAND CRK ON NC-98. | 5 of 5 | $9,973,437 | +49% |
| 18 JUL 2023 | C204715 | Jackson | Grading, drainage, paving, and structure., grading, drainage, paving, bike lanes, and sidewalk. SR-1336 FROM N OF SR-1002 TO N OF SR-1337 AN | 2 of 6 | $6,473,349 | +3.0% |
| 16 MAY 2023 | C204237 | Mecklenburg | Bridge preservation., grading, drainage, paving, and bridge rehabilitation. I-277 FROM W OF I-77 TO E OF I-77 AND BRIDGE #345 ON NC-16 NB OV | 1 of 7 | $13,952,572 | Low, 5.0% under the second |
| 16 MAY 2023 | C204716 | Burke | Grading, drainage, paving, signals, and structure., grading, drainage, paving, signals, and structures. BRIDGE #99 OVER NORFOLK SOUTHERN RAI | 1 of 4 | $22,957,187 | Low, 15% under the second |
| 18 APR 2023 | C204726 | Buncombe | Pavement rehabilitation and bridge preservation. I-40 FROM MILEMARKER 45.25 TO MILEMARKER 50. | 2 of 3 | $29,157,087 | +4.0% |
| 17 JAN 2023 | C204804 | Iredell, Catawba | Structure rehabilitation. I-40 FROM EAST OF SR-1007 (1ST ST WEST) TO EAST OF NC-115. | 1 of 5 | $9,122,439 | Low, 2.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way