NCDOT letting results, April 18, 2023
8 contracts let by North Carolina DOT on April 18, 2023, $115,310,863 in low bids, a median of 3.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $115,310,863
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204726 | Pavement rehabilitation and bridge preservation. I-40 FROM MILEMARKER 45.25 TO MILEMARKER 50. | Buncombe | 3 | Apac Atlantic Inc DBA Harrison Construction Company | $27,988,062 | $29,157,087 | +4.0% | NCDOT |
| C204793 | Grading, drainage, paving, signals, and structures. BRIDGE 780001 OVER US-29 ON SR-2817 AND BRIDGE 780151 OVER US-29 ON US-158. | Rockingham | 7 | W C English Incorporated | $26,223,171 | $27,232,958 | +4.0% | NCDOT |
| C204380 | Grading, drainage, paving, signals, and structure. SR-2000 (FALLS OF NEUSE RD) FROM I-540 TO SR-2006 (DURANT RD). | Wake | 2 | FSC II LLC DBA Fred Smith Company | $19,385,000 | $20,768,246 | +7.0% | NCDOT |
| C204741 | Grading, drainage, paving, signals, and structures. BRIDGES #57 AND #59 OVER IRISH BUFFALO CREEK ON US-29 AND US-601. | Cabarrus | 4 | Dane Construction, Inc. | $11,730,808 | $12,749,176 | +9.0% | NCDOT |
| C204736 | Pavement rehabilitation. I-40 FROM BUFFALO CREEK BRIDGE EAST OF US-220 TO EAST OF SR-3037/SR-4240 (GATE CITY BLVD) IN GREENSBORO. | Guilford | 3 | Vecellio & Grogan Inc DBA Sharpe Brothers | $11,499,384 | $12,493,000 | +9.0% | NCDOT |
| C204813 | Grading, drainage, paving, signals, and structures. BRIDGE #400225 OVER US-29/70 ON SR-1115 (REHOBETH CHURCH RD) IN GREENSBORO. | Guilford | 7 | Zachry Construction Corporation | $8,420,830 | $8,797,556 | +4.0% | NCDOT |
| C204871 | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-64 AND 5 SECTIONS OF SECONDARY ROADS. | Davidson | 2 | J. T. Russell & Sons, Inc. | $6,185,165 | $7,238,116 | +17% | NCDOT |
| C204795 | Grading, drainage, paving, and structure. BRIDGE #230005 OVER GAPWAY SWAMP ON US-76. | Columbus | 7 | Es Wagner Company LLC | $3,878,443 | $3,969,743 | +2.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.