Apac Atlantic Inc DBA Harrison Construction Company: NCDOT bid record
Apac Atlantic Inc DBA Harrison Construction Company submitted 14 bids on North Carolina DOT contracts in the data, from 19 JAN 2021 to 18 JUN 2024, and was the low bidder on 10 of them (71%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $114,054,986
- Latest bid
- 18 JUN 2024
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 6 | 5 | 83% |
| 2022 | 3 | 2 | 67% |
| 2023 | 4 | 2 | 50% |
| 2024 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rutherford | 2 | 1 | 50% |
| Buncombe | 2 | 2 | 100% |
| Haywood | 2 | 2 | 100% |
| Henderson | 1 | 0 | 0% |
| Cherokee | 1 | 1 | 100% |
| Jackson | 1 | 1 | 100% |
| Polk | 1 | 1 | 100% |
| Mcdowell | 1 | 0 | 0% |
| Swain | 1 | 0 | 0% |
| Macon | 1 | 1 | 100% |
| Polk, Transylvania | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 9 | 8 (89%) | $180.00 | $135.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 7 | 6 (86%) | $2.00 | $2.25 |
| Patching existing pavement | 1704000000-E | TON | 8 | 5 (63%) | $160.00 | $125.00 |
| Shoulder reconstruction | 1245000000-E | SMI | 7 | 5 (71%) | $6,200.00 | $2,670.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 6 | 5 (83%) | $87.50 | $50.00 |
| Mill asp PVMT *****" DTH - (1-1/2") | 1297000000-E | SY | 7 | 4 (57%) | $3.25 | $2.75 |
| Asphalt conc surface course, type S9.5C | 1523000000-E | TON | 6 | 4 (67%) | $69.37 | $64.72 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 6 | 4 (67%) | $5.35 | $3.05 |
| Polymer modified asphalt binder for plant mix | 1577000000-E | TON | 6 | 4 (67%) | $987.50 | $750.00 |
| Adjustment of manholes | 2830000000-N | EACH | 5 | 4 (80%) | $1,500.00 | $900.00 |
| Thermoplastic pavement marking character (90 mils) | 4720000000-E | EACH | 5 | 4 (80%) | $175.00 | $116.50 |
| Paint pavement marking lines (12") | 4825000000-E | LF | 5 | 4 (80%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 5 | 1 of 5 |
| Blythe Construction Inc | 2 | 1 of 2 |
| Maymead, Inc. | 1 | 1 of 1 |
| WNC Paving , Inc. | 1 | 1 of 1 |
| Mountain Creek Contractors Inc | 1 | 0 of 1 |
| Crowder Construction Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 JUN 2024 | C204960 | Rutherford | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 26 SECTIONS OF SECONDARY ROADS | 1 of 2 | $5,031,065 | Low, 5.0% under the second |
| 18 JUL 2023 | C204738 | Mcdowell | Pavement rehabilitation. I-40 FROM MILEMARKER 67 TO MILEMARKER 73 (OLD FORT MOUNTAIN). | 2 of 2 | $16,917,610 | +14% |
| 18 APR 2023 | C204726 | Buncombe | Pavement rehabilitation and bridge preservation. I-40 FROM MILEMARKER 45.25 TO MILEMARKER 50. | 1 of 3 | $27,988,062 | Low, 4.0% under the second |
| 21 MAR 2023 | C204784 | Polk | Pavement rehabilitation. I-26 FROM MM-65 TO SOUTH CAROLINA STATE LINE. | 1 of 2 | $16,759,298 | Low, 10% under the second |
| 21 FEB 2023 | C204774 | Swain | Milling and resurfacing. US-74 FROM SR-1190 (HYATT CREEK RD) TO US-19 (ALARKA RD) INCLUDING RAMPS. | 2 of 2 | $9,521,784 | +2.0% |
| 18 OCT 2022 | C204776 | Rutherford | Milling and resurfacing. 1 SECTION OF US-74. | 2 of 3 | $4,540,786 | +1.0% |
| 19 APR 2022 | C204717 | Buncombe | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-74 AND 23 SECTIONS OF SECONDARY ROADS. | 1 of 2 | $7,519,598 | Low, 30% under the second |
| 15 MAR 2022 | C204701 | Haywood | Pavement rehabilitation. I-40 FROM MILEMARKER 30 TO MILEMARKER 34.45. | 1 of 1 | $11,717,004 | Low |
| 21 DEC 2021 | C204681 | Polk, Transylvania | Milling, resurfacing, and shoulder construction. 1 SECTION OF US-276, AND 19 SECTIONS OF SECONDARY ROADS. | 1 of 2 | $6,043,450 | Low, 13% under the second |
| 21 SEP 2021 | C204651 | Haywood | Pavement rehabilitation. I-40 FROM MILEMARKER 27 TO MILEMARKER 31.265. | 1 of 1 | $8,697,459 | Low |
| 16 MAR 2021 | C204609 | Macon | Milling and resurfacing. 1 SECTION OF US-23/441. | 1 of 1 | $11,767,325 | Low |
| 16 FEB 2021 | C204600 | Henderson | Milling, resurfacing, and shoulder grading. 1 SECTION OF US-25. | 2 of 2 | $5,499,333 | +35% |
| 16 FEB 2021 | C204605 | Cherokee | Milling, resurfacing, and shoulder grading. 1 SECTION OF US-19/74. | 1 of 1 | $10,546,246 | Low |
| 19 JAN 2021 | C204590 | Jackson | Milling and resurfacing. 1 SECTION OF US-74/441 AND RAMPS. | 1 of 1 | $7,985,479 | Low |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.