Blythe Construction Inc submitted 346 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 70 of them (20%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $762,363,252
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 54 | 13 | 24% |
| 2014 | 22 | 6 | 27% |
| 2015 | 26 | 5 | 19% |
| 2016 | 27 | 3 | 11% |
| 2017 | 15 | 1 | 7% |
| 2018 | 18 | 5 | 28% |
| 2019 | 5 | 3 | 60% |
| 2020 | 9 | 3 | 33% |
| 2021 | 27 | 2 | 7% |
| 2022 | 14 | 5 | 36% |
| 2023 | 12 | 1 | 8% |
| 2024 | 38 | 4 | 11% |
| 2025 | 44 | 9 | 20% |
| 2026 | 35 | 10 | 29% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 42 | 13 | 31% |
| Mecklenburg | 39 | 8 | 21% |
| Guilford | 30 | 6 | 20% |
| Randolph | 23 | 1 | 4% |
| Davidson | 23 | 5 | 22% |
| Forsyth | 20 | 3 | 15% |
| Cabarrus | 20 | 5 | 25% |
| Union | 17 | 4 | 24% |
| Gaston | 12 | 3 | 25% |
| Rockingham | 11 | 3 | 27% |
| Rowan | 8 | 0 | 0% |
| Cleveland | 8 | 1 | 13% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 256 | 159 (62%) | $125.00 | $135.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 250 | 153 (61%) | $0.24 | $0.27 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 211 | 137 (65%) | $2.00 | $2.25 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 205 | 129 (63%) | $3.00 | $3.50 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 227 | 120 (53%) | $0.65 | $0.75 |
| Paint pavement marking symbol | 4845000000-N | EACH | 192 | 114 (59%) | $50.00 | $50.00 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 151 | 113 (75%) | $3.00 | $3.05 |
| Additional guardrail posts | 3150000000-N | EACH | 154 | 112 (73%) | $13.00 | $13.00 |
| Paint pavement marking lines (8") | 4820000000-E | LF | 169 | 98 (58%) | $0.75 | $0.82 |
| Asphalt binder for plant mix | 1575000000-E | TON | 324 | 94 (29%) | $600.00 | $595.00 |
| Removal of pavement marking lines (4") | 4850000000-E | LF | 144 | 93 (65%) | $1.00 | $1.00 |
| Inductive loop sawcut | 7444000000-E | LF | 162 | 91 (56%) | $8.97 | $7.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FSC II LLC DBA Fred Smith Company | 87 | 55 of 87 |
| Smith-Rowe, LLC | 69 | 58 of 69 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 69 | 48 of 69 |
| Blythe Development Co. | 63 | 36 of 63 |
| S T Wooten Corporation | 61 | 26 of 61 |
| J. T. Russell & Sons, Inc. | 61 | 30 of 61 |
| Dane Construction, Inc. | 55 | 36 of 55 |
| The Lane Construction Corp | 47 | 16 of 47 |
| W C English Incorporated | 45 | 19 of 45 |
| Vecellio & Grogan Inc | 34 | 14 of 34 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C204338 | Wake | WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53 | 1 of 8 | $40,085,604 | Low, 6.0% under the second |
| 20 OCT 2026 | C205236 | Union | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-74 EAST, 1 SECTION OF NC-84, AND 15 SECTIONS OF SECONDARY ROADS | 3 of 3 | $7,733,373 | +11% |
| 15 SEP 2026 | C205233 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS | 1 of 4 | $4,383,731 | Low, 1.0% under the second |
| 15 SEP 2026 | C204349 | Wake, Durham | PAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE) | 1 of 4 | $21,049,440 | Low, 8.0% under the second |
| 15 SEP 2026 | C205234 | Rockingham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-704, 1 SECTION OF NC-14, 1 SECTION OF US-158, AND 6 SECTIONS OF SECONDARY | 3 of 3 | $8,011,914 | +14% |
| 18 AUG 2026 | C205070 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-120 | 9 of 9 | $9,113,060 | +29% |
| 18 AUG 2026 | C205224 | Rutherford | BRIDGE REPLACEMENT (EXPRESS DESIGN-BUILD). BRIDGE #800239 OVER CATHEYS CREEK ON SR-1325 (NANNEYTOWN RD) | 4 of 4 | $2,486,005 | +68% |
| 21 JUL 2026 | C205225 | Polk | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 | 1 of 3 | $32,021,844 | Low, 11% under the second |
| 16 JUN 2026 | C205160 | Forsyth | GRADING DRAINAGE, PAVING, SIGNALS AND STRUCTURE., GRADING DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #330289 OVER US-52 ON SR-4000 | 1 of 5 | $19,008,330 | Low, 2.0% under the second |
| 16 JUN 2026 | C205186 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS | 5 of 6 | $13,284,719 | +8.0% |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 3 of 11 | $13,414,717 | +8.0% |
| 19 MAY 2026 | C205197 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS, AND 1 SECTION OF NC-49 | 5 of 5 | $6,129,956 | +6.0% |
| 19 MAY 2026 | C205138 | Mecklenburg, Iredell | GRADING, DRAINAGE, AND PAVING. I-77 RAMPS AT US-21, NC-73, NC-24, SR-1109, AND SR-2158 | 3 of 4 | $5,797,086 | +12% |
| 19 MAY 2026 | C204733 | Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #980029 OVER I-77 ON US-21 BUS | 1 of 4 | $16,487,471 | Low, 13% under the second |
| 19 MAY 2026 | C205200 | Rutherford | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 17 SECTIONS OF SECONDARY ROADS, 3 SCHOOL BUS DRIVES, AND 1 FIRE DEPARTMENT | 4 of 4 | $7,799,401 | +32% |
| 21 APR 2026 | C205130 | Wayne | GRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-42 | 4 of 5 | $21,974,635 | +11% |
| 21 APR 2026 | C204857 | Johnston | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD) | 5 of 7 | $13,878,501 | +13% |
| 21 APR 2026 | C205190 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | 1 of 6 | $3,998,445 | Low, 3.0% under the second |
| 21 APR 2026 | C205193 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDA | 5 of 5 | $6,836,741 | +19% |
| 21 APR 2026 | C205088 | Wake, Franklin | PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE | 4 of 4 | $20,756,165 | +32% |
| 21 APR 2026 | C205178 | Polk | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE,P | 2 of 3 | $24,843,910 | +7.0% |
| 24 MAR 2026 | C205165 | Polk | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 | 5 of 5 | $49,751,779 | +59% |
| 17 MAR 2026 | C205181 | Durham, Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, AND 28 SECTIONS OF SECONDARY ROADS | 3 of 3 | $4,926,272 | +17% |
| 17 MAR 2026 | C205038 | Wake | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD) | 4 of 6 | $8,587,245 | +24% |
| 17 MAR 2026 | C205179 | Union | RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-205, AND 9 SECTIONS OF SECONDARY ROADS | 2 of 2 | $6,113,200 | +13% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.