The Lane Construction Corp: NCDOT bid record
The Lane Construction Corp submitted 98 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 19 MAY 2026, and was the low bidder on 13 of them (13%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $444,248,846
- Latest bid
- 19 MAY 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 22 | 3 | 14% |
| 2014 | 12 | 0 | 0% |
| 2015 | 11 | 0 | 0% |
| 2016 | 15 | 2 | 13% |
| 2017 | 10 | 3 | 30% |
| 2018 | 20 | 3 | 15% |
| 2019 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 2 | 0 | 0% |
| 2025 | 2 | 1 | 50% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 20 | 3 | 15% |
| Mecklenburg | 14 | 2 | 14% |
| Gaston | 9 | 2 | 22% |
| Cabarrus | 6 | 0 | 0% |
| Rowan | 5 | 1 | 20% |
| Cleveland | 5 | 1 | 20% |
| Durham | 4 | 1 | 25% |
| Lincoln | 4 | 0 | 0% |
| Guilford | 4 | 0 | 0% |
| Franklin | 3 | 0 | 0% |
| Union | 3 | 0 | 0% |
| Granville | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking lines (24", 120 mils) | 4710000000-E | LF | 84 | 54 (64%) | $8.00 | $8.90 |
| Thermoplastic pavement marking character (120 mils) | 4721000000-E | EACH | 82 | 54 (66%) | $102.34 | $100.00 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 91 | 50 (55%) | $125.00 | $135.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 77 | 45 (58%) | $2.00 | $2.25 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 81 | 41 (51%) | $0.20 | $0.27 |
| Thermoplastic pavement marking lines (8", 120 mils) | 4697000000-E | LF | 64 | 38 (59%) | $2.40 | $2.50 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 68 | 37 (54%) | $3.00 | $3.50 |
| Paint pavement marking symbol | 4845000000-N | EACH | 65 | 36 (55%) | $50.00 | $50.00 |
| Paint pavement marking lines (8") | 4820000000-E | LF | 59 | 32 (54%) | $0.60 | $0.82 |
| Temporary silt fence | 6000000000-E | LF | 76 | 30 (39%) | $2.15 | $2.63 |
| Snowplowable pavement markers | 4905000000-N | EACH | 66 | 30 (45%) | $27.25 | $29.50 |
| Paint pavement marking character | 4840000000-N | EACH | 52 | 30 (58%) | $40.36 | $50.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 47 | 31 of 47 |
| FSC II LLC DBA Fred Smith Company | 38 | 27 of 38 |
| Carolina Sunrock LLC | 23 | 16 of 23 |
| S T Wooten Corporation | 21 | 12 of 21 |
| J. T. Russell & Sons, Inc. | 19 | 15 of 19 |
| Blythe Brothers Asphalt Co LLC | 19 | 13 of 19 |
| Barnhill Contracting Company | 15 | 5 of 15 |
| Asphalt Paving of Shelby Inc | 10 | 9 of 10 |
| Blythe Development Co. | 9 | 8 of 9 |
| Vecellio & Grogan Inc | 7 | 6 of 7 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 MAY 2026 | C204773 | Gaston, Mecklenburg | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. INTERSECTIONS OF NC-7 AND SR-2083 AT US-74, B | 4 of 10 | $81,539,000 | +5.0% |
| 24 JUN 2025 | C205001 | Gaston | DESIGN-BUILD. NC-7 (MAIN ST) INTERSECTION WITH US-29/74 (WILKINSON BLVD), AND I-85 FROM NC-7 TO EAST OF NC-273 | 1 of 4 | $336,985,000 | Low, 17% under the second |
| 18 MAR 2025 | C204933 | Chatham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. CHATHAM PARKWAY FROM NORTH OF PROPOSED GRANT DRIVE TO US-15/US-501 | 12 of 12 | $21,822,450 | +47% |
| 15 OCT 2024 | C204348 | Iredell, Catawba | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-150 FROM SR-1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US-21 IN IREDELL COUNTY | 2 of 5 | $249,700,000 | 0.0% |
| 16 JUL 2024 | C204878 | Buncombe | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. I-40 FROM EAST OF SR-1224 TO PAVEMENT JOINT WEST OF SR-3412, AND I-26, I-40 AT I-40/US 1 | 2 of 3 | $111,447,299 | +6.0% |
| 21 NOV 2023 | C204852 | Iredell | Widening, grading, drainage, paving, and structures. SR-1100 (BRAWLEY SCHOOL RD) FROM I-77 TO US-21 | 1 of 5 | $34,788,496 | Low, 14% under the second |
| 15 NOV 2022 | C204345 | Cabarrus | Grading, drainage, paving, retaining wall, and structure. GRADE SEPARATION AT SR-1625 (ROGERS LAKE RD) OVER NS/NCRR AND CLOSURE OF AT-GRADE | 11 of 11 | $24,226,030 | +49% |
| 16 APR 2019 | C204244 | Rowan | Pavement rehabilitation and bridge preservation. I-85 FROM US-29/601 IN CHINA GROVE TO US-601 IN SALISBURY & FROM S OF US-52 IN SALISBURY TO | 5 of 6 | $18,894,331 | +16% |
| 16 OCT 2018 | C204256 | Durham, Wake | Milling, resurfacing, and shoulder grading. 1 SECTION OF US-70, 1 SECTION OF NC-98, AND 3 SECTIONS OF SECONDARY ROADS. | 2 of 4 | $4,129,895 | +9.0% |
| 02 OCT 2018 | C204250 | Wake | Milling, resurfacing, signals, and shoulder reconstruction. 91 SECTIONS OF SECONDARY ROADS. | 2 of 3 | $6,458,122 | +8.0% |
| 02 OCT 2018 | C204226 | Mecklenburg, Cabarrus | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-21, 1 SECTION OF US-29, 1 SECTION OF NC-51, 1 SECTION OF NC-115, AND 44 | 3 of 3 | $9,967,492 | +1.0% |
| 02 OCT 2018 | C204146 | Mecklenburg | Pavement rehabilitation and structures overlay. I-485 FROM I-85 TO ROCKY RIVER ROAD. | 3 of 3 | $11,619,304 | +6.0% |
| 21 AUG 2018 | C204227 | Wake | Milling, resurfacing, and shoulder grading. 37 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $4,265,544 | Low, 4.0% under the second |
| 17 JUL 2018 | C204199 | Franklin | Milling, resurfacing, signals & shoulder reconstruction. 1 SECTION OF US-1. | 4 of 4 | $6,043,412 | +33% |
| 05 JUN 2018 | C204165 | Surry, Yadkin | Express design build. I-77 FROM MILE MARKER 78.4 TO MILE MARKER 83.4. | 2 of 3 | $54,855,000 | +11% |
| 15 MAY 2018 | C204168 | Durham, Wake | Milling, resurfacing, shoulder reconstruction, and signals. 14 SECTIONS OF SECONDARY ROADS. | 3 of 4 | $5,596,251 | +5.0% |
| 15 MAY 2018 | C204173 | Mecklenburg | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-21, 1 SECTION OF US-29, 1 SECTION OF NC-16, 1 SECTION OF NC-27, AND 18 SE | 2 of 3 | $8,044,874 | +4.0% |
| 15 MAY 2018 | C204117 | Mecklenburg | Pavement rehabilitation and structure rehabilitation. I-77 FROM PAVEMENT JOINT AT MM-5.3 NORTH OF TYVOLA RD TO BRIDGE DECK AT MM-9.8 OVER W. | 2 of 2 | $13,248,071 | +3.0% |
| 17 APR 2018 | C204158 | Wake | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-64 BUS AND NC-96, 1 SECTION OF NC-97, AND 13 SECTIONS OF SECONDARY ROADS | 3 of 3 | $6,810,046 | +16% |
| 17 APR 2018 | C204159 | Mecklenburg | Milling, resurfacing, and shoulder reconstruction. 7 SECTIONS OF NC-51 AND 11 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $6,032,945 | Low, 9.0% under the second |
| 17 APR 2018 | C204161 | Gaston | Milling, resurfacing, shoulder reconstruction, and signals. 2 SECTIONS OF NC-16, 3 SECTIONS OF NC-279, 1 SECTION OF NC-274, AND 99 SECTIONS | 2 of 3 | $11,029,259 | +2.0% |
| 20 MAR 2018 | C204096 | Guilford | Grading, drainage, paving, signals, its, and structures. GREENSBORO EASTERN LOOP FROM US-29 NORTH OF GREENSBORO TO SR-2303 (LAWNDALE DR). | 6 of 8 | $167,689,995 | +24% |
| 20 MAR 2018 | C204141 | Rowan | Milling, resurfacing & shoulder reconstruction. 2 SECTIONS OF US-52 AND 13 SECTIONS OF SECONDARY ROADS. | 3 of 3 | $5,231,095 | +5.0% |
| 20 MAR 2018 | C204126 | Mecklenburg | Grading, drainage, paving, and signals. INTERSECTION OF NC-16 (BROOKSHIRE BLVD) AND SR-2004 (MOUNT HOLLY HUNTERSVILLE RD). | 3 of 3 | $8,405,199 | +17% |
| 20 MAR 2018 | C204142 | Cleveland | Milling, resurfacing, widening, and shoulder reconstruction. 2 SECTIONS OF NC-216, 1 SECTION OF NC-150, NC-180, AND NC-182, AND 51 SECTIONS | 2 of 2 | $12,293,493 | +36% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.