NCDOT contract C204933 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES. CHATHAM PARKWAY FROM NORTH OF PROPOSED GRANT DRIVE TO US-15/US-501. Let by North Carolina DOT on March 18, 2025, Chatham. 12 bids received; low bid $14,818,648 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 18 MAR 2025
- Pay items
- 188
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $14,818,648 | Low |
| 2 | Triangle Grading & Paving Inc | $14,946,300 | +1.0% |
| 3 | FSC II LLC DBA Fred Smith Company | $15,495,000 | +5.0% |
| 4 | Branch Civil Inc | $16,185,000 | +9.0% |
| 5 | K West Group LLC DBA Kwest Group LLC | $18,057,125 | +22% |
| 6 | Conti Civil LLC | $18,086,442 | +22% |
| 7 | Cardinal Civil Contracting LLC | $18,095,215 | +22% |
| 8 | Vecellio & Grogan Inc | $18,260,000 | +23% |
| 9 | Blythe Construction Inc | $19,012,925 | +28% |
| 10 | S T Wooten Corporation | $19,276,619 | +30% |
| 11 | Zachry Construction Corporation | $19,661,969 | +33% |
| 12 | The Lane Construction Corp | $21,822,450 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. Triangle Grading & Paving Inc | 3. FSC II LLC DBA Fred Smith Company | 4. Branch Civil Inc | 5. K West Group LLC DBA Kwest Group LLC | 6. Conti Civil LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $720,000 | $730,000 | $770,000 | $613,000 | $867,690 | $900,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $251,580 | $250,000 | $200,000 | $144,000 | $290,000 | $300,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $805,000 | $2,265,203 | $900,000 | $315,681 | $375,000 | $4,355,652 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 2 | $6,500.00 | $3,000.00 | $1,000.00 | $18,200 | $9,500.00 | $2,500.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 112,000 | $6.50 | $8.50 | $5.50 | $7.50 | $12.00 | $6.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 2,835 | $24.20 | $7.00 | $47.00 | $11.00 | $9.00 | $50.00 |
| 0007 | Borrow excavation (0106000000-E) | CY | 110,000 | $13.80 | $0.10 | $9.00 | $14.50 | $26.00 | $0.01 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 1,400 | $20.60 | $11.00 | $14.00 | $7.25 | $23.00 | $26.00 |
| 0009 | Berm ditch construction (0141000000-E) | LF | 700 | $8.60 | $6.00 | $5.50 | $8.75 | $16.00 | $10.00 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 1,300 | $5.80 | $5.00 | $5.00 | $11.00 | $29.00 | $15.00 |
| 0011 | Proof rolling (0192000000-N) | HR | 30 | $261.60 | $250.00 | $250.00 | $209.00 | $685.00 | $200.00 |
| 0012 | Select granular material (0195000000-E) | CY | 1,335 | $34.00 | $22.00 | $30.00 | $17.00 | $26.00 | $36.00 |
| 0013 | Geotextile for soil stabilization (0196000000-E) | SY | 4,150 | $3.10 | $4.00 | $6.50 | $3.25 | $3.25 | $4.00 |
| 0014 | Foundation conditioning material, minor structures (0318000000-E) | TON | 1,219 | $44.00 | $45.00 | $35.00 | $79.00 | $22.00 | $55.00 |
| 0015 | Foundation conditioning geo-textile (0320000000-E) | SY | 3,803 | $5.80 | $5.00 | $3.00 | $5.75 | $4.25 | $5.00 |
| 0016 | 15" drainage pipe (0335200000-E) | LF | 224 | $41.70 | $60.00 | $77.00 | $82.00 | $94.00 | $90.00 |
| 0017 | 18" drainage pipe (0335300000-E) | LF | 132 | $49.40 | $70.00 | $82.00 | $76.00 | $88.00 | $96.00 |
| 0018 | 24" drainage pipe (0335400000-E) | LF | 140 | $67.30 | $80.00 | $96.00 | $97.00 | $86.00 | $108.00 |
| 0019 | 30" drainage pipe (0335500000-E) | LF | 96 | $87.30 | $90.00 | $110.00 | $127.00 | $136.00 | $135.00 |
| 0020 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 4 | $175.00 | $600.00 | $585.00 | $577.00 | $1,200.00 | $400.00 |
| 0021 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 4 | $295.00 | $625.00 | $635.00 | $703.00 | $1,225.00 | $480.00 |
| 0022 | **" drainage pipe elbow - (24") (0335850000-E) | EACH | 4 | $400.00 | $725.00 | $720.00 | $1,100.00 | $1,400.00 | $575.00 |
| 0023 | **" drainage pipe elbow - (30") (0335850000-E) | EACH | 2 | $715.00 | $1,000.00 | $910.00 | $1,900.00 | $1,810.00 | $760.00 |
| 0024 | ***" RC pipe culv ***** - (15", V) (0354000000-E) | LF | 268 | $84.20 | $75.00 | $113.00 | $117.00 | $113.00 | $115.00 |
| 0025 | ***" RC pipe culv ***** - (18", V) (0354000000-E) | LF | 892 | $77.60 | $85.00 | $100.00 | $135.00 | $122.00 | $130.00 |
| 0026 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 120 | $338.00 | $390.00 | $480.00 | $675.00 | $485.00 | $465.00 |
| 0027 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 6,232 | $56.40 | $70.00 | $79.00 | $95.00 | $97.00 | $80.00 |
| 0028 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 2,296 | $67.90 | $80.00 | $100.00 | $116.00 | $116.00 | $130.00 |
| 0029 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 304 | $95.60 | $105.00 | $118.00 | $170.00 | $213.00 | $150.00 |
| 0030 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 248 | $133.00 | $140.00 | $158.00 | $241.00 | $235.00 | $200.00 |
| 0031 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 372 | $174.10 | $185.00 | $203.00 | $295.00 | $287.00 | $250.00 |
| 0032 | Pipe removal (0995000000-E) | LF | 243 | $20.70 | $24.00 | $20.00 | $37.00 | $60.00 | $55.00 |
| 0033 | Generic grading item (SY) SP - geotextile for subgrade stabilization (1004500000-E) | SY | 10,350 | $3.50 | $4.00 | $4.50 | $5.00 | $2.00 | $5.00 |
| 0034 | Fine grading (1011000000-N) | LS | 1 | $380,000 | $570,000 | $860,500 | $433,000 | $110,000 | $300,000 |
| 0035 | Lime treated soil (slurry method) (1044000000-E) | SY | 21,000 | $5.29 | $5.29 | $3.70 | $4.00 | $8.78 | $3.55 |
| 0036 | Lime for lime treated soil used based on county (1066000000-E) | TON | 260 | $308.00 | $308.00 | $345.00 | $367.00 | $293.19 | $331.00 |
| 0037 | Shallow undercut (1099500000-E) | CY | 575 | $40.00 | $27.00 | $33.00 | $13.00 | $8.00 | $40.00 |
| 0038 | Class IV subgrade stabilization (1099700000-E) | TON | 1,150 | $41.00 | $28.50 | $31.00 | $44.50 | $32.00 | $36.00 |
| 0039 | Stabilizer aggregate (1110000000-E) | TON | 300 | $45.00 | $30.00 | $25.00 | $44.50 | $24.00 | $44.00 |
| 0040 | Aggregate base course (1121000000-E) | TON | 6,900 | $34.90 | $28.50 | $36.50 | $46.00 | $40.00 | $42.00 |
| 0041 | Soil cement base (1176000000-E) | SY | 21,000 | $5.29 | $5.29 | $3.20 | $3.50 | $8.96 | $3.20 |
| 0042 | Portland cement for soil cement base (1187000000-E) | TON | 590 | $232.00 | $232.00 | $285.00 | $307.00 | $197.54 | $285.00 |
| 0043 | Incidental stone base (1220000000-E) | TON | 500 | $29.00 | $40.00 | $60.00 | $45.25 | $25.00 | $49.00 |
| 0044 | Incidental milling (1330000000-E) | SY | 920 | $19.30 | $15.00 | $18.00 | $10.75 | $19.30 | $20.50 |
| 0045 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 7,540 | $70.90 | $81.00 | $73.00 | $85.00 | $70.90 | $76.00 |
| 0046 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 8,160 | $68.40 | $77.00 | $67.00 | $80.00 | $68.40 | $73.00 |
| 0047 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 9,260 | $74.90 | $87.00 | $87.00 | $92.00 | $74.90 | $80.00 |
| 0048 | Asphalt binder for plant mix (1575000000-E) | TON | 1,335 | $550.00 | $480.00 | $620.00 | $475.00 | $550.00 | $556.00 |
| 0049 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 100 | $200.00 | $200.00 | $170.00 | $300.00 | $200.00 | $200.00 |
| 0050 | Right-of-way markers (2000000000-N) | EACH | 4 | $380.00 | $375.00 | $350.00 | $328.00 | $290.00 | $300.00 |
| 0051 | Control-of-access markers (2020000000-N) | EACH | 65 | $380.00 | $350.00 | $450.00 | $328.00 | $290.00 | $325.00 |
| 0052 | Subdrain excavation (2022000000-E) | CY | 168 | $40.00 | $20.00 | $25.00 | $55.00 | $23.00 | $53.00 |
| 0053 | Geotextile for subsurface drains (2026000000-E) | SY | 500 | $8.20 | $7.00 | $6.00 | $13.75 | $3.50 | $1.00 |
| 0054 | Subdrain coarse aggregate (2036000000-E) | CY | 84 | $88.00 | $50.00 | $60.00 | $169.00 | $66.00 | $58.00 |
| 0055 | 6" perforated subdrain pipe (2044000000-E) | LF | 500 | $22.00 | $8.00 | $10.00 | $22.25 | $21.00 | $8.50 |
| 0056 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $1,000.00 | $400.00 | $400.00 | $554.00 | $1,400.00 | $500.00 |
| 0057 | 6" outlet pipe (2077000000-E) | LF | 6 | $71.70 | $35.00 | $40.00 | $55.00 | $75.00 | $85.00 |
| 0058 | Blotting sand (2143000000-E) | TON | 10 | $255.00 | $75.00 | $110.00 | $111.00 | $90.00 | $41.00 |
| 0059 | Endwalls (2209000000-E) | CY | 6.80 | $1,390.00 | $1,500.00 | $1,250.00 | $2,300.00 | $1,960.00 | $2,250.00 |
| 0060 | Reinforced endwalls (2220000000-E) | CY | 5 | $2,810.00 | $1,500.00 | $1,875.00 | $2,700.00 | $2,690.00 | $4,200.00 |
| 0061 | Pipe collars (2253000000-E) | CY | 0.66 | $1,650.00 | $7,000.00 | $4,000.00 | $2,800.00 | $4,500.00 | $3,380.00 |
| 0062 | Masonry drainage structures (2286000000-N) | EACH | 114 | $2,405.00 | $2,700.00 | $3,700.00 | $3,700.00 | $4,550.00 | $2,700.00 |
| 0063 | Masonry drainage structures (2308000000-E) | LF | 100.10 | $608.00 | $590.00 | $600.00 | $667.00 | $500.00 | $750.00 |
| 0064 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 47 | $1,115.00 | $1,100.00 | $1,200.00 | $3,900.00 | $1,300.00 | $1,500.00 |
| 0065 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 1 | $1,132.00 | $1,150.00 | $1,190.00 | $1,400.00 | $1,300.00 | $1,500.00 |
| 0066 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 3 | $1,154.00 | $1,350.00 | $1,350.00 | $1,500.00 | $1,500.00 | $1,700.00 |
| 0067 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 18 | $1,154.00 | $1,450.00 | $1,390.00 | $1,500.00 | $1,600.00 | $1,700.00 |
| 0068 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 27 | $1,154.00 | $1,450.00 | $1,390.00 | $1,500.00 | $1,600.00 | $1,800.00 |
| 0069 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $840.00 | $1,150.00 | $1,025.00 | $1,100.00 | $1,100.00 | $1,350.00 |
| 0070 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 17 | $2,735.00 | $3,300.00 | $3,100.00 | $3,600.00 | $4,000.00 | $3,300.00 |
| 0071 | Concrete transitional section for catch basin (2440000000-N) | EACH | 33 | $1,000.00 | $1,000.00 | $1,550.00 | $1,100.00 | $1,000.00 | $1,152.00 |
| 0072 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 17 | $1,000.00 | $1,000.00 | $1,550.00 | $1,100.00 | $1,000.00 | $1,150.00 |
| 0073 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 14,300 | $17.75 | $17.75 | $17.75 | $23.25 | $17.75 | $25.00 |
| 0074 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 3,800 | $29.15 | $29.15 | $29.15 | $35.75 | $29.15 | $37.25 |
| 0075 | Concrete curb ramps (2605000000-N) | EACH | 13 | $2,650.00 | $2,650.00 | $2,650.00 | $2,900.00 | $2,650.00 | $3,500.00 |
| 0076 | 4" concrete paved ditch (2619000000-E) | SY | 220 | $110.50 | $110.50 | $120.00 | $122.00 | $110.50 | $144.00 |
| 0077 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 1,190 | $85.00 | $85.00 | $85.00 | $94.00 | $85.00 | $91.00 |
| 0078 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $1,000.00 | $900.00 | $1,550.00 | $671.00 | $5,500.00 | $1,000.00 |
| 0079 | Steel beam guardrail (3030000000-E) | LF | 2,125 | $23.00 | $23.00 | $23.00 | $25.00 | $23.00 | $24.15 |
| 0080 | Additional guardrail posts (3150000000-N) | EACH | 5 | $44.00 | $44.00 | $44.00 | $48.75 | $44.00 | $46.20 |
| 0081 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 6 | $850.00 | $850.00 | $850.00 | $942.00 | $850.00 | $892.50 |
| 0082 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 6 | $3,250.00 | $3,250.00 | $3,250.00 | $3,600.00 | $3,250.00 | $3,412.50 |
| 0083 | Rip rap, class I (3628000000-E) | TON | 320 | $75.00 | $55.00 | $90.00 | $100.00 | $70.00 | $71.00 |
| 0084 | Rip rap, class II (3635000000-E) | TON | 190 | $115.00 | $60.00 | $105.00 | $114.00 | $132.00 | $89.00 |
| 0085 | Rip rap, class B (3649000000-E) | TON | 290 | $68.00 | $50.00 | $90.00 | $88.00 | $65.00 | $74.00 |
| 0086 | Geotextile for drainage (3656000000-E) | SY | 3,050 | $2.00 | $5.00 | $3.50 | $4.50 | $2.75 | $3.60 |
| 0087 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 140 | $12.50 | $12.00 | $12.00 | $13.25 | $12.00 | $13.00 |
| 0088 | Contr furn, type ***sign - (F) (4025000000-E) | SF | 80 | $12.50 | $13.00 | $13.00 | $14.50 | $13.00 | $13.00 |
| 0089 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 375 | $6.00 | $7.00 | $7.00 | $7.75 | $7.00 | $6.30 |
| 0090 | Sign erection, type E (4102000000-N) | EACH | 19 | $125.00 | $75.00 | $75.00 | $83.00 | $75.00 | $130.00 |
| 0091 | Sign erection, type F (4108000000-N) | EACH | 6 | $125.00 | $100.00 | $100.00 | $111.00 | $100.00 | $130.00 |
| 0092 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 1 | $250.00 | $100.00 | $100.00 | $111.00 | $100.00 | $260.00 |
| 0093 | Disposal of sign system, U-channel (4155000000-N) | EACH | 7 | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.50 |
| 0094 | Work zone signs (stationary) (4400000000-E) | SF | 80 | $10.50 | $6.75 | $25.00 | $11.75 | $6.75 | $12.00 |
| 0095 | Work zone signs (barricade mounted) (4410000000-E) | SF | 40 | $11.00 | $7.00 | $15.00 | $12.25 | $7.00 | $9.00 |
| 0096 | Drums (4430000000-N) | EACH | 115 | $85.00 | $75.00 | $45.00 | $71.00 | $20.00 | $60.00 |
| 0097 | Barricades (type III) (4445000000-E) | LF | 80 | $50.00 | $24.00 | $28.00 | $41.75 | $10.00 | $24.00 |
| 0098 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 28,217 | $0.82 | $0.82 | $0.82 | $1.00 | $0.82 | $0.86 |
| 0099 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 3,311 | $1.80 | $1.80 | $1.80 | $2.00 | $1.80 | $1.90 |
| 0100 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 560 | $3.00 | $3.00 | $3.00 | $3.25 | $3.00 | $3.15 |
| 0101 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 373 | $13.00 | $13.00 | $13.00 | $14.00 | $13.00 | $13.65 |
| 0102 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 41 | $125.00 | $125.00 | $125.00 | $139.00 | $125.00 | $131.00 |
| 0103 | Paint pavement marking lines (4") (4810000000-E) | LF | 20,075 | $0.30 | $0.30 | $0.30 | $0.35 | $0.30 | $0.32 |
| 0104 | Paint pavement marking lines (8") (4820000000-E) | LF | 1,598 | $0.70 | $0.70 | $0.70 | $0.75 | $0.70 | $0.75 |
| 0105 | Paint pavement marking lines (12") (4825000000-E) | LF | 116 | $0.80 | $0.80 | $0.80 | $1.00 | $0.80 | $0.85 |
| 0106 | Paint pavement marking symbol (4845000000-N) | EACH | 6 | $50.00 | $50.00 | $50.00 | $55.00 | $50.00 | $52.50 |
| 0107 | Permanent raised pavement markers (4900000000-N) | EACH | 241 | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.50 |
| 0108 | 7' U-channel posts (4915000000-E) | EACH | 5 | $56.00 | $75.00 | $75.00 | $83.00 | $75.00 | $126.00 |
| 0109 | Object markers (end of road) (4955000000-N) | EACH | 5 | $115.00 | $95.00 | $95.00 | $105.00 | $95.00 | $52.50 |
| 0110 | 12" water line (5326200000-E) | LF | 986 | $116.00 | $130.00 | $102.00 | $103.00 | $200.00 | $100.00 |
| 0111 | DI H2O pipe fittings (5329000000-E) | LB | 740 | $12.50 | $13.00 | $14.00 | $10.00 | $8.00 | $10.00 |
| 0112 | 6" valve (5540000000-E) | EACH | 2 | $2,750.00 | $2,900.00 | $2,512.00 | $3,700.00 | $7,100.00 | $3,500.00 |
| 0113 | 12" valve (5558000000-E) | EACH | 1 | $5,800.00 | $6,600.00 | $5,650.36 | $5,100.00 | $9,125.00 | $4,800.00 |
| 0114 | 2" air release valve (5589200000-E) | EACH | 1 | $12,800 | $5,300.00 | $10,750 | $9,100.00 | $14,175 | $8,500.00 |
| 0115 | Fire hydrant (5666000000-N) | EACH | 2 | $9,140.00 | $7,100.00 | $7,500.00 | $10,500 | $10,450 | $10,000 |
| 0116 | Fire hydrant leg (5673000000-E) | LF | 27 | $102.00 | $84.00 | $130.00 | $194.00 | $305.00 | $200.00 |
| 0117 | Generic utility item (LF) - 2" PVC casing (5888000000-E) | LF | 946 | $16.70 | $22.00 | $19.00 | $25.00 | $13.00 | $27.00 |
| 0118 | Generic utility item (LF) - 4" PVC casing (5888000000-E) | LF | 3,730 | $20.10 | $24.00 | $19.00 | $30.50 | $17.00 | $30.00 |
| 0119 | Generic utility item (LF) - 6" PVC casing (5888000000-E) | LF | 1,884 | $24.80 | $26.00 | $24.00 | $35.00 | $25.00 | $36.00 |
| 0120 | Temporary silt fence (6000000000-E) | LF | 21,360 | $2.70 | $2.50 | $2.70 | $3.00 | $2.95 | $3.50 |
| 0121 | Stone for erosion control, class A (6006000000-E) | TON | 1,350 | $54.00 | $45.00 | $60.00 | $65.00 | $72.00 | $70.00 |
| 0122 | Stone for erosion control, class B (6009000000-E) | TON | 3,200 | $56.00 | $50.00 | $30.00 | $85.00 | $58.00 | $74.00 |
| 0123 | Sediment control stone (6012000000-E) | TON | 2,940 | $46.00 | $40.00 | $35.00 | $79.00 | $64.00 | $63.00 |
| 0124 | Temporary mulching (6015000000-E) | ACRE | 20.50 | $1,500.00 | $1,100.00 | $2,000.00 | $1,700.00 | $1,900.00 | $1,785.00 |
| 0125 | Seed for temporary seeding (6018000000-E) | LB | 1,200 | $3.00 | $2.00 | $4.00 | $3.25 | $2.00 | $2.10 |
| 0126 | Fertilizer for temporary seeding (6021000000-E) | TON | 6.50 | $900.00 | $1,100.00 | $1,000.00 | $998.00 | $1,000.00 | $945.00 |
| 0127 | Temporary slope drains (6024000000-E) | LF | 1,350 | $15.80 | $27.00 | $25.00 | $27.50 | $34.00 | $27.35 |
| 0128 | Safety fence (6029000000-E) | LF | 1,560 | $3.00 | $3.25 | $3.00 | $3.25 | $2.75 | $2.75 |
| 0129 | Silt excavation (6030000000-E) | CY | 10,810 | $11.80 | $3.00 | $4.00 | $16.25 | $18.00 | $12.00 |
| 0130 | Matting for erosion control (6036000000-E) | SY | 46,000 | $1.45 | $1.89 | $1.45 | $1.50 | $1.65 | $1.60 |
| 0131 | Coir fiber mat (6037000000-E) | SY | 100 | $6.00 | $15.00 | $12.65 | $6.75 | $8.00 | $6.30 |
| 0132 | 1/4" hardware cloth (6042000000-E) | LF | 3,940 | $3.50 | $5.00 | $3.50 | $4.00 | $5.00 | $5.00 |
| 0133 | **" temporary pipe - (24") (6045000000-E) | LF | 270 | $50.00 | $57.00 | $50.00 | $144.00 | $83.00 | $95.00 |
| 0134 | **" temporary pipe - (30") (6045000000-E) | LF | 430 | $66.00 | $75.00 | $55.00 | $174.00 | $106.00 | $110.00 |
| 0135 | **" temporary pipe - (36") (6045000000-E) | LF | 370 | $90.00 | $95.00 | $67.00 | $200.00 | $112.00 | $140.00 |
| 0136 | Temporary pipe for stream crossing (6046000000-E) | LF | 75 | $205.00 | $115.00 | $80.00 | $181.00 | $130.00 | $130.00 |
| 0137 | Special stilling basins (6070000000-N) | EACH | 4 | $3,230.00 | $575.00 | $1,250.00 | $1,100.00 | $1,220.00 | $400.00 |
| 0138 | Coir fiber wattle (6071012000-E) | LF | 350 | $10.50 | $9.50 | $17.75 | $11.75 | $9.50 | $9.45 |
| 0139 | Polyacrylamide (pam) (6071020000-E) | LB | 170 | $8.00 | $1.00 | $8.00 | $8.75 | $6.00 | $6.30 |
| 0140 | Coir fiber baffle (6071030000-E) | LF | 2,360 | $7.00 | $8.45 | $7.50 | $7.75 | $10.00 | $8.40 |
| 0141 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 7 | $1,625.00 | $1,450.00 | $2,500.00 | $1,100.00 | $1,300.00 | $2,100.00 |
| 0142 | **" skimmer - (2") (6071050000-E) | EACH | 1 | $1,965.00 | $1,650.00 | $2,800.00 | $1,300.00 | $1,450.00 | $2,100.00 |
| 0143 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 1 | $2,175.00 | $1,900.00 | $3,000.00 | $1,700.00 | $1,600.00 | $2,100.00 |
| 0144 | Seeding and mulching (6084000000-E) | ACRE | 25 | $2,575.00 | $2,810.00 | $2,575.00 | $2,900.00 | $3,000.00 | $2,835.00 |
| 0145 | Mowing (6087000000-E) | ACRE | 18 | $250.00 | $200.00 | $250.00 | $277.00 | $225.00 | $210.00 |
| 0146 | Seed for repair seeding (6090000000-E) | LB | 200 | $6.00 | $5.00 | $6.00 | $6.75 | $5.00 | $4.20 |
| 0147 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $980.00 | $1,200.00 | $980.00 | $1,100.00 | $1,300.00 | $1,260.00 |
| 0148 | Seed for supplemental seeding (6096000000-E) | LB | 650 | $6.00 | $3.00 | $6.00 | $6.75 | $3.50 | $3.15 |
| 0149 | Fertilizer topdressing (6108000000-E) | TON | 18.25 | $1,025.00 | $1,150.00 | $760.00 | $1,100.00 | $1,000.00 | $945.00 |
| 0150 | Impervious dike (6111000000-E) | LF | 175 | $100.00 | $100.00 | $125.00 | $104.00 | $93.00 | $150.00 |
| 0151 | Specialized hand mowing (6114500000-N) | MHR | 10 | $180.00 | $150.00 | $225.00 | $200.00 | $200.00 | $185.00 |
| 0152 | Response for erosion control (6117000000-N) | EACH | 75 | $50.00 | $300.00 | $50.00 | $55.00 | $125.00 | $105.00 |
| 0153 | Concrete washout structure (6117500000-N) | EACH | 6 | $4,600.00 | $1,000.00 | $1,000.00 | $2,200.00 | $2,070.00 | $1,265.00 |
| 0154 | Culvert diversion channel (6120000000-E) | CY | 41 | $125.00 | $25.00 | $465.00 | $157.00 | $140.00 | $100.00 |
| 0155 | Reforestation (6123000000-E) | ACRE | 0.10 | $3,200.00 | $10,000 | $32,000 | $3,500.00 | $2,500.00 | $21,000 |
| 0156 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 12 | $1,100.00 | $1,100.00 | $1,100.00 | $1,200.00 | $1,507.00 | $1,200.00 |
| 0157 | Signal cable (7060000000-E) | LF | 7,875 | $2.50 | $2.50 | $2.50 | $2.75 | $4.50 | $2.75 |
| 0158 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 24 | $1,100.00 | $1,100.00 | $1,100.00 | $1,200.00 | $1,359.00 | $1,193.00 |
| 0159 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 11 | $1,400.00 | $1,400.00 | $1,400.00 | $1,600.00 | $1,736.00 | $1,515.00 |
| 0160 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $1,900.00 | $1,900.00 | $1,900.00 | $2,100.00 | $2,139.00 | $2,060.00 |
| 0161 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 175 | $30.00 | $30.00 | $30.00 | $33.50 | $69.00 | $32.50 |
| 0162 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 3,150 | $14.00 | $14.00 | $14.00 | $15.75 | $18.00 | $15.25 |
| 0163 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 1,125 | $31.00 | $31.00 | $31.00 | $34.75 | $38.00 | $33.50 |
| 0164 | Junction box (standard size) (7324000000-N) | EACH | 23 | $825.00 | $825.00 | $825.00 | $924.00 | $783.00 | $894.00 |
| 0165 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 11 | $1,300.00 | $1,300.00 | $1,300.00 | $1,500.00 | $1,463.00 | $1,410.00 |
| 0166 | Inductive loop sawcut (7444000000-E) | LF | 2,100 | $12.00 | $12.00 | $12.00 | $13.50 | $21.50 | $13.00 |
| 0167 | 900MHZ serial/ethernet spread spectrum radio (7575142010-N) | EACH | 2 | $9,000.00 | $9,000.00 | $9,000.00 | $10,100 | $9,952.00 | $9,750.00 |
| 0168 | Metal pole with single mast arm (7588000000-N) | EACH | 11 | $24,100 | $24,100 | $24,100 | $27,000 | $32,923 | $26,125 |
| 0169 | Soil test (7613000000-N) | EACH | 11 | $1,600.00 | $1,600.00 | $1,600.00 | $1,800.00 | $2,639.00 | $1,735.00 |
| 0170 | Drilled pier foundation (7614100000-E) | CY | 60.50 | $1,400.00 | $1,400.00 | $1,400.00 | $1,600.00 | $2,037.00 | $1,515.00 |
| 0171 | Mast arm with metal pole design (7631000000-N) | EACH | 11 | $500.00 | $500.00 | $500.00 | $560.00 | $293.00 | $542.00 |
| 0172 | Sign for signals (7636000000-N) | EACH | 23 | $525.00 | $525.00 | $525.00 | $588.00 | $819.00 | $570.00 |
| 0173 | Type II pedestal with foundation (7642200000-N) | EACH | 12 | $3,650.00 | $3,650.00 | $3,650.00 | $4,100.00 | $3,915.00 | $3,950.00 |
| 0174 | Signal cabinet foundation (7684000000-N) | EACH | 4 | $3,200.00 | $3,200.00 | $3,200.00 | $3,600.00 | $3,790.00 | $3,470.00 |
| 0175 | Contlrs with CBNT (**************) - (2070LX base MTD) (7696000000-N) | EACH | 4 | $22,500 | $22,500 | $22,500 | $25,200 | $28,809 | $24,400 |
| 0176 | Detector card (type 170) (7744000000-N) | EACH | 25 | $300.00 | $300.00 | $300.00 | $336.00 | $412.00 | $325.00 |
| 0177 | Cabinet base extender (7901000000-N) | EACH | 4 | $650.00 | $650.00 | $650.00 | $728.00 | $604.00 | $705.00 |
| 0178 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 2 | $1,750.00 | $1,750.00 | $1,750.00 | $2,000.00 | $3,299.00 | $1,900.00 |
| 0179 | Generic signal item (EA) - install cellular modem and antenna (7980000000-N) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,800.00 | $2,338.00 | $2,710.00 |
| 0180 | Generic signal item (EA) - protective coating for single mast arm pole (7980000000-N) | EACH | 11 | $4,450.00 | $4,450.00 | $4,450.00 | $5,000.00 | $2,149.00 | $4,825.00 |
| 0181 | Generic signal item (EA) - protective coating for type II signal pedestal (7980000000-N) | EACH | 11 | $275.00 | $275.00 | $275.00 | $308.00 | $286.00 | $300.00 |
| 0182 | Culv excav @ ************ - (108+98.22 -L-) (8126000000-N) | LS | 1 | $50,000 | $35,000 | $75,000 | $75,000 | $41,600 | $125,000 |
| 0183 | Culv excav @ ************ - (124+63.87 -L-) (8126000000-N) | LS | 1 | $60,000 | $55,000 | $90,000 | $81,000 | $37,330 | $125,000 |
| 0184 | Foundation conditioning material, box culvert (8133000000-E) | TON | 638 | $80.00 | $35.65 | $55.00 | $88.00 | $71.30 | $85.00 |
| 0185 | Class A concrete (culvert) (8196000000-E) | CY | 1,202.80 | $600.00 | $690.00 | $750.00 | $695.00 | $696.25 | $635.00 |
| 0186 | Reinforcing steel (culvert) (8245000000-E) | LB | 177,098 | $1.95 | $2.00 | $2.00 | $2.00 | $2.24 | $2.06 |
| 0187 | Soldier pile retaining walls (8802014000-E) | SF | 3,818 | $305.77 | $137.00 | $285.00 | $154.00 | $350.00 | $180.00 |
| 0188 | Generic ret wall item (SF) - simulated stone form liner system and surface finish (8847000000-E) | SF | 3,818 | $12.42 | $78.00 | $37.00 | $88.00 | $15.00 | $36.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.