FSC II LLC DBA Fred Smith Company: NCDOT bid record

FSC II LLC DBA Fred Smith Company submitted 396 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 114 of them (29%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
North Carolina DOT
Low bid volume
$848,946,659
Latest bid
20 OCT 2026
Data through
20 OCT 2026
396Bids
114Low bids
29Win rate, percent
+8.0%Median gap to the low bid when not low, 282 bids

By year

YearBidsLow bidsWin rate
2013371027%
201425728%
201519421%
201620630%
201712325%
2018291034%
201917529%
202014429%
2021531936%
202233927%
202331723%
2024441227%
2025321134%
202630723%
FSC II LLC DBA Fred Smith Company, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Wake883641%
Johnston21629%
Chatham19842%
Randolph1616%
Durham15533%
Granville15213%
Moore14857%
Franklin14321%
Nash13215%
Alamance10220%
Wilson10110%
Person900%
FSC II LLC DBA Fred Smith Company, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Thermoplastic pavement marking symbol (90 mils)4725000000-EEACH283218 (77%)$125.00$135.00
Thermoplastic pavement marking lines (4", 90 mils)4685000000-ELF275193 (70%)$0.61$0.75
Paint pavement marking symbol4845000000-NEACH211181 (86%)$40.00$50.00
Paint pavement marking lines (4")4810000000-ELF247173 (70%)$0.20$0.27
Seeding and mulching6084000000-EACRE273169 (62%)$2,219.00$2,365.00
Thermoplastic pavement marking lines (8", 90 mils)4695000000-ELF212167 (79%)$2.00$2.25
Paint pavement marking lines (24")4835000000-ELF211164 (78%)$3.00$3.50
Inductive loop sawcut7444000000-ELF217146 (67%)$6.90$7.25
Temporary silt fence6000000000-ELF269140 (52%)$2.50$2.63
Removal of pavement marking lines (4")4850000000-ELF166137 (83%)$1.00$1.00
Mill asp PVMT *****" DTH - (1-1/2")1297000000-ESY224136 (61%)$1.56$2.75
Thermoplastic pavement marking lines (12", 90 mils)4700000000-ELF176136 (77%)$3.00$3.05
FSC II LLC DBA Fred Smith Company, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FSC II LLC DBA Fred Smith Company, NCDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
20 OCT 2026C205216MartinGRADING, DRAINAGE, AND PAVING. US-17 FROM SR-1521 (MILL INN RD) TO SR-1119 (RALPH TAYLOR RD)3 of 4$8,282,828+10%
20 OCT 2026C204338WakeWIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.532 of 8$42,481,019+6.0%
15 SEP 2026C205203WayneGRADING, DRAINAGE, AND PAVING. INTERSECTION OF NC-55 AND SR-1744 (OLD SEVEN SPRINGS RD/INDIAN SPRINGS RD)3 of 6$3,191,193+10%
15 SEP 2026C205233WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS3 of 4$4,560,540+4.0%
15 SEP 2026C204349Wake, DurhamPAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE)3 of 4$26,234,524+25%
15 SEP 2026C204990RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS4 of 9$9,029,900+8.0%
21 JUL 2026C205183NashPAVEMENT REHABILITATION AND BRIDGE PRESERVATION. I-95 FROM SR-1770 (SUNSET AVE) TO SR-1524 (RED OAK BATTLEBORO RD)1 of 2$7,456,789Low, 13% under the second
16 JUN 2026C205186RockinghamGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS6 of 6$14,710,000+20%
16 JUN 2026C205157RandolphGRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI7 of 11$14,779,900+19%
19 MAY 2026C205153HertfordGRADING, DRAINAGE, AND PAVING. US-158/US-258 FROM 0.56 MILES WEST OF SR-1157 (POWELL RD) TO 0.60 MILES EAST OF SR-1160 (BENTHALL BRIDGE RD)1 of 4$5,555,556Low, 4.0% under the second
19 MAY 2026C205187CumberlandGRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURES., GRADING, DRAINAGE, AND PAVI2 of 4$15,992,000+3.0%
21 APR 2026C205192SampsonMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-421, 1 SECTION OF US-701, AND 7 SECTIONS OF SECONDARY ROADS2 of 3$6,314,516+3.0%
21 APR 2026C205130WayneGRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-422 of 5$20,118,811+2.0%
21 APR 2026C204857JohnstonGRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD)2 of 7$13,247,007+7.0%
21 APR 2026C205190WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS2 of 6$4,110,576+3.0%
21 APR 2026C205088Wake, FranklinPAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE1 of 4$15,727,427Low, 7.0% under the second
17 MAR 2026C205156WilsonPAVEMENT REHABILITATION. US-264 FROM WILSON CO LINE TO I-952 of 2$7,045,745+22%
17 MAR 2026C205181Durham, WakeMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, AND 28 SECTIONS OF SECONDARY ROADS2 of 3$4,715,751+12%
17 MAR 2026C204512WakeGRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, AND SIGNALS. US-401 FROM SOUTH OF SR-1006 (OLD STAGE ROAD) TO SOUTH OF 4 of 4$31,690,000+24%
17 MAR 2026C205038WakeGRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD)1 of 6$6,939,396Low, 15% under the second
17 MAR 2026C205176RichmondMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-74, AND 7 SECTIONS OF SECONDARY ROADS2 of 2$4,460,293+4.0%
17 FEB 2026C205036RobesonGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1997 (FAYETTEVILLE RD) FROM FARRINGDOM ST TO EAST 22ND ST4 of 4$46,934,500+20%
17 FEB 2026C205035WayneGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS3 of 8$32,854,321+7.0%
17 FEB 2026C204765WakeGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-3126 (AIRPORT BLVD) FROM GARDEN SQUARE LANE TO SR-1637 (CHURCH ST) IN MORRISVILLE3 of 9$10,437,373+6.0%
17 FEB 2026C205166Hoke, ScotlandMILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-401, 1 SECTION OF NC-79, AND 4 SECTIONS OF SECONDARY ROADS1 of 2$3,796,081Low, 8.0% under the second
FSC II LLC DBA Fred Smith Company: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy