FSC II LLC DBA Fred Smith Company: NCDOT bid record
FSC II LLC DBA Fred Smith Company submitted 396 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 114 of them (29%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $848,946,659
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 37 | 10 | 27% |
| 2014 | 25 | 7 | 28% |
| 2015 | 19 | 4 | 21% |
| 2016 | 20 | 6 | 30% |
| 2017 | 12 | 3 | 25% |
| 2018 | 29 | 10 | 34% |
| 2019 | 17 | 5 | 29% |
| 2020 | 14 | 4 | 29% |
| 2021 | 53 | 19 | 36% |
| 2022 | 33 | 9 | 27% |
| 2023 | 31 | 7 | 23% |
| 2024 | 44 | 12 | 27% |
| 2025 | 32 | 11 | 34% |
| 2026 | 30 | 7 | 23% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 88 | 36 | 41% |
| Johnston | 21 | 6 | 29% |
| Chatham | 19 | 8 | 42% |
| Randolph | 16 | 1 | 6% |
| Durham | 15 | 5 | 33% |
| Granville | 15 | 2 | 13% |
| Moore | 14 | 8 | 57% |
| Franklin | 14 | 3 | 21% |
| Nash | 13 | 2 | 15% |
| Alamance | 10 | 2 | 20% |
| Wilson | 10 | 1 | 10% |
| Person | 9 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 283 | 218 (77%) | $125.00 | $135.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 275 | 193 (70%) | $0.61 | $0.75 |
| Paint pavement marking symbol | 4845000000-N | EACH | 211 | 181 (86%) | $40.00 | $50.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 247 | 173 (70%) | $0.20 | $0.27 |
| Seeding and mulching | 6084000000-E | ACRE | 273 | 169 (62%) | $2,219.00 | $2,365.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 212 | 167 (79%) | $2.00 | $2.25 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 211 | 164 (78%) | $3.00 | $3.50 |
| Inductive loop sawcut | 7444000000-E | LF | 217 | 146 (67%) | $6.90 | $7.25 |
| Temporary silt fence | 6000000000-E | LF | 269 | 140 (52%) | $2.50 | $2.63 |
| Removal of pavement marking lines (4") | 4850000000-E | LF | 166 | 137 (83%) | $1.00 | $1.00 |
| Mill asp PVMT *****" DTH - (1-1/2") | 1297000000-E | SY | 224 | 136 (61%) | $1.56 | $2.75 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 176 | 136 (77%) | $3.00 | $3.05 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| S T Wooten Corporation | 231 | 107 of 231 |
| Barnhill Contracting Company | 126 | 46 of 126 |
| Carolina Sunrock LLC | 92 | 50 of 92 |
| Blythe Construction Inc | 87 | 32 of 87 |
| Dane Construction, Inc. | 64 | 25 of 64 |
| W C English Incorporated | 44 | 10 of 44 |
| The Lane Construction Corp | 38 | 11 of 38 |
| Branch Civil Inc | 35 | 12 of 35 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 32 | 21 of 32 |
| Smith-Rowe, LLC | 31 | 21 of 31 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205216 | Martin | GRADING, DRAINAGE, AND PAVING. US-17 FROM SR-1521 (MILL INN RD) TO SR-1119 (RALPH TAYLOR RD) | 3 of 4 | $8,282,828 | +10% |
| 20 OCT 2026 | C204338 | Wake | WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53 | 2 of 8 | $42,481,019 | +6.0% |
| 15 SEP 2026 | C205203 | Wayne | GRADING, DRAINAGE, AND PAVING. INTERSECTION OF NC-55 AND SR-1744 (OLD SEVEN SPRINGS RD/INDIAN SPRINGS RD) | 3 of 6 | $3,191,193 | +10% |
| 15 SEP 2026 | C205233 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64 BUS, AND 46 SECTIONS OF SECONDARY ROADS | 3 of 4 | $4,560,540 | +4.0% |
| 15 SEP 2026 | C204349 | Wake, Durham | PAVEMENT REHABILITATION. I-40 FROM EAST OF I-885/NC-885 TO SR-1728 (WADE AVE) | 3 of 4 | $26,234,524 | +25% |
| 15 SEP 2026 | C204990 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS | 4 of 9 | $9,029,900 | +8.0% |
| 21 JUL 2026 | C205183 | Nash | PAVEMENT REHABILITATION AND BRIDGE PRESERVATION. I-95 FROM SR-1770 (SUNSET AVE) TO SR-1524 (RED OAK BATTLEBORO RD) | 1 of 2 | $7,456,789 | Low, 13% under the second |
| 16 JUN 2026 | C205186 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #780023 OVER US-29 ON US-29 BUSINESS | 6 of 6 | $14,710,000 | +20% |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 7 of 11 | $14,779,900 | +19% |
| 19 MAY 2026 | C205153 | Hertford | GRADING, DRAINAGE, AND PAVING. US-158/US-258 FROM 0.56 MILES WEST OF SR-1157 (POWELL RD) TO 0.60 MILES EAST OF SR-1160 (BENTHALL BRIDGE RD) | 1 of 4 | $5,555,556 | Low, 4.0% under the second |
| 19 MAY 2026 | C205187 | Cumberland | GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURES., GRADING, DRAINAGE, AND PAVI | 2 of 4 | $15,992,000 | +3.0% |
| 21 APR 2026 | C205192 | Sampson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-421, 1 SECTION OF US-701, AND 7 SECTIONS OF SECONDARY ROADS | 2 of 3 | $6,314,516 | +3.0% |
| 21 APR 2026 | C205130 | Wayne | GRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-42 | 2 of 5 | $20,118,811 | +2.0% |
| 21 APR 2026 | C204857 | Johnston | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD) | 2 of 7 | $13,247,007 | +7.0% |
| 21 APR 2026 | C205190 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | 2 of 6 | $4,110,576 | +3.0% |
| 21 APR 2026 | C205088 | Wake, Franklin | PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE | 1 of 4 | $15,727,427 | Low, 7.0% under the second |
| 17 MAR 2026 | C205156 | Wilson | PAVEMENT REHABILITATION. US-264 FROM WILSON CO LINE TO I-95 | 2 of 2 | $7,045,745 | +22% |
| 17 MAR 2026 | C205181 | Durham, Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, AND 28 SECTIONS OF SECONDARY ROADS | 2 of 3 | $4,715,751 | +12% |
| 17 MAR 2026 | C204512 | Wake | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, AND SIGNALS. US-401 FROM SOUTH OF SR-1006 (OLD STAGE ROAD) TO SOUTH OF | 4 of 4 | $31,690,000 | +24% |
| 17 MAR 2026 | C205038 | Wake | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD) | 1 of 6 | $6,939,396 | Low, 15% under the second |
| 17 MAR 2026 | C205176 | Richmond | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-74, AND 7 SECTIONS OF SECONDARY ROADS | 2 of 2 | $4,460,293 | +4.0% |
| 17 FEB 2026 | C205036 | Robeson | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1997 (FAYETTEVILLE RD) FROM FARRINGDOM ST TO EAST 22ND ST | 4 of 4 | $46,934,500 | +20% |
| 17 FEB 2026 | C205035 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS | 3 of 8 | $32,854,321 | +7.0% |
| 17 FEB 2026 | C204765 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-3126 (AIRPORT BLVD) FROM GARDEN SQUARE LANE TO SR-1637 (CHURCH ST) IN MORRISVILLE | 3 of 9 | $10,437,373 | +6.0% |
| 17 FEB 2026 | C205166 | Hoke, Scotland | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-401, 1 SECTION OF NC-79, AND 4 SECTIONS OF SECONDARY ROADS | 1 of 2 | $3,796,081 | Low, 8.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.