NCDOT contract C205035 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS. Let by North Carolina DOT on February 17, 2026, Wayne. 8 bids received; low bid $30,715,185 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 17 FEB 2026
- Pay items
- 223
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $30,715,185 | Low |
| 2 | Barnhill Contracting Company | $31,573,717 | +3.0% |
| 3 | FSC II LLC DBA Fred Smith Company | $32,854,321 | +7.0% |
| 4 | Blythe Construction Inc | $33,486,011 | +9.0% |
| 5 | Conti Civil LLC | $33,553,442 | +9.0% |
| 6 | Zachry Construction Corporation | $34,903,188 | +14% |
| 7 | S T Wooten Corporation | $35,720,626 | +16% |
| 8 | Civil Works Contracting LLC | $39,265,564 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. Barnhill Contracting Company | 3. FSC II LLC DBA Fred Smith Company | 4. Blythe Construction Inc | 5. Conti Civil LLC | 6. Zachry Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,380,830 | $1,579,000 | $1,640,000 | $1,650,000 | $1,670,000 | $1,745,159 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $313,490 | $1,500,000 | $250,000 | $350,000 | $450,000 | $400,000 |
| 0003 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $11,177 | $100.00 | $1.00 | $20,000 | $2,500.00 | $1,000.00 |
| 0004 | Undercut excavation (0057000000-E) | CY | 2,350 | $22.45 | $40.00 | $19.00 | $18.00 | $25.00 | $25.96 |
| 0005 | Grading (0063000000-N) | LS | 1 | $1,628,382 | $5,291,182 | $5,492,003 | $5,600,000 | $5,332,630 | $1,087,969 |
| 0006 | Borrow excavation (0106000000-E) | CY | 61,400 | $25.50 | $15.00 | $22.00 | $22.00 | $0.01 | $32.73 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 200 | $31.05 | $7.40 | $38.00 | $32.00 | $23.00 | $10.17 |
| 0008 | Select granular material (0195000000-E) | CY | 2,350 | $25.50 | $50.00 | $22.00 | $75.00 | $95.00 | $70.25 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 3,750 | $3.50 | $3.85 | $4.00 | $5.00 | $3.50 | $4.16 |
| 0010 | Temporary shoring (0199000000-E) | SF | 450 | $130.00 | $150.00 | $90.00 | $40.00 | $0.01 | $92.19 |
| 0011 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 60 | $89.50 | $88.20 | $150.00 | $120.00 | $200.00 | $108.27 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 2,360 | $86.50 | $55.40 | $75.00 | $65.00 | $70.00 | $62.16 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 7,400 | $2.65 | $7.50 | $7.00 | $5.00 | $4.25 | $4.48 |
| 0014 | **" side drain pipe - (54") (0342000000-E) | LF | 44 | $242.00 | $427.75 | $390.00 | $450.00 | $360.00 | $438.15 |
| 0015 | 15" side drain pipe (0343000000-E) | LF | 838 | $65.50 | $81.80 | $90.00 | $80.00 | $86.00 | $83.06 |
| 0016 | 18" RC pipe culverts, class III (0372000000-E) | LF | 18 | $155.00 | $102.85 | $92.00 | $170.00 | $150.00 | $131.45 |
| 0017 | 24" RC pipe culverts, class III (0378000000-E) | LF | 96 | $141.00 | $115.95 | $120.00 | $110.00 | $155.00 | $174.86 |
| 0018 | 36" RC pipe culverts, class III (0390000000-E) | LF | 48 | $258.00 | $194.40 | $175.00 | $210.00 | $250.00 | $295.73 |
| 0019 | 42" RC pipe culverts, class III (0396000000-E) | LF | 16 | $511.00 | $299.90 | $260.00 | $310.00 | $425.00 | $399.67 |
| 0020 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 228 | $725.00 | $558.35 | $380.00 | $440.00 | $585.00 | $656.37 |
| 0021 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 10,726 | $93.75 | $103.30 | $95.00 | $85.00 | $120.00 | $119.31 |
| 0022 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,452 | $110.00 | $110.55 | $99.00 | $100.00 | $133.00 | $141.54 |
| 0023 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 3,744 | $164.00 | $139.90 | $120.00 | $130.00 | $172.00 | $147.49 |
| 0024 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 1,816 | $230.00 | $179.30 | $150.00 | $170.00 | $216.00 | $256.18 |
| 0025 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 2,796 | $309.00 | $224.75 | $187.00 | $220.00 | $300.00 | $335.34 |
| 0026 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 112 | $454.00 | $311.15 | $290.00 | $305.00 | $400.00 | $468.39 |
| 0027 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 64 | $116.00 | $154.90 | $100.00 | $80.00 | $123.00 | $126.32 |
| 0028 | **" RC pipe culv class V - (54") (0449000000-E) | LF | 176 | $846.00 | $585.95 | $425.00 | $450.00 | $670.00 | $735.01 |
| 0029 | Pipe removal (0995000000-E) | LF | 5,507 | $47.00 | $22.65 | $35.00 | $40.00 | $35.00 | $27.44 |
| 0030 | Pipe clean out (0996000000-N) | EACH | 2 | $29,985 | $2,217.00 | $3,000.00 | $2,000.00 | $1,500.00 | $10,151 |
| 0031 | Shallow undercut (1099500000-E) | CY | 3,750 | $20.40 | $28.90 | $28.00 | $10.00 | $22.50 | $27.73 |
| 0032 | Class IV subgrade stabilization (1099700000-E) | TON | 9,075 | $55.00 | $35.00 | $40.00 | $45.00 | $42.00 | $48.33 |
| 0033 | Class IV aggregate stabilization (1111000000-E) | TON | 300 | $55.00 | $75.50 | $40.00 | $50.00 | $56.00 | $43.62 |
| 0034 | Geotextile for subgrade stabilization (1112000000-E) | SY | 13,575 | $4.45 | $4.00 | $4.00 | $4.00 | $4.25 | $4.45 |
| 0035 | Incidental stone base (1220000000-E) | TON | 1,000 | $61.50 | $94.75 | $68.00 | $80.00 | $65.00 | $43.62 |
| 0036 | Mill asp PVMT *****" DTH - (2-1/2") (1297000000-E) | SY | 46,075 | $2.70 | $2.75 | $5.00 | $3.00 | $1.26 | $5.36 |
| 0037 | Incidental milling (1330000000-E) | SY | 4,400 | $8.40 | $10.85 | $14.00 | $10.00 | $6.25 | $15.85 |
| 0038 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 21,100 | $93.00 | $85.50 | $95.00 | $100.00 | $89.78 | $116.29 |
| 0039 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 26,500 | $93.00 | $85.50 | $117.00 | $100.00 | $89.78 | $116.29 |
| 0040 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 1,800 | $146.00 | $131.00 | $160.00 | $131.00 | $137.55 | $178.17 |
| 0041 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 19,000 | $106.00 | $95.00 | $115.00 | $100.00 | $99.75 | $129.21 |
| 0042 | Asphalt binder for plant mix (1575000000-E) | TON | 3,460 | $598.00 | $550.00 | $600.00 | $550.00 | $577.50 | $748.05 |
| 0043 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 500 | $266.00 | $215.00 | $265.00 | $233.54 | $310.00 | $390.70 |
| 0044 | Generic paving item (TON) - joint repair (1880000000-E) | TON | 200 | $447.00 | $360.00 | $475.00 | $600.00 | $650.00 | $533.38 |
| 0045 | Subdrain excavation (2022000000-E) | CY | 807 | $32.20 | $35.00 | $35.00 | $35.00 | $55.00 | $14.98 |
| 0046 | Geotextile for subsurface drains (2026000000-E) | SY | 3,600 | $5.90 | $12.00 | $12.00 | $12.00 | $1.00 | $2.72 |
| 0047 | Subdrain coarse aggregate (2036000000-E) | CY | 605 | $137.00 | $85.00 | $85.00 | $85.00 | $80.00 | $78.76 |
| 0048 | 6" perforated subdrain pipe (2044000000-E) | LF | 3,600 | $13.75 | $17.00 | $17.00 | $17.00 | $10.00 | $25.24 |
| 0049 | Subdrain pipe outlet (2070000000-N) | EACH | 8 | $1,271.00 | $400.00 | $400.00 | $400.00 | $425.00 | $225.27 |
| 0050 | 6" outlet pipe (2077000000-E) | LF | 48 | $105.00 | $40.00 | $40.00 | $40.00 | $50.00 | $27.74 |
| 0051 | Endwalls (2209000000-E) | CY | 29.30 | $1,946.00 | $2,063.00 | $1,950.00 | $1,500.00 | $1,800.00 | $2,436.69 |
| 0052 | Reinforced endwalls (2220000000-E) | CY | 17.10 | $3,761.00 | $2,387.00 | $3,000.00 | $3,000.00 | $1,900.00 | $2,631.10 |
| 0053 | Pipe collars (2253000000-E) | CY | 0.89 | $7,743.00 | $6,210.00 | $3,000.00 | $5,000.00 | $3,725.00 | $3,261.91 |
| 0054 | Flowable fill (2275000000-E) | CY | 13 | $1,241.00 | $2,110.00 | $225.00 | $450.00 | $625.00 | $771.83 |
| 0055 | Masonry drainage structures (2286000000-N) | EACH | 196 | $3,725.00 | $2,975.00 | $4,250.00 | $3,500.00 | $3,250.00 | $5,509.97 |
| 0056 | Masonry drainage structures (2297000000-E) | CY | 6.72 | $8,690.00 | $7,280.00 | $11,000 | $10,000 | $10,000 | $7,892.95 |
| 0057 | Masonry drainage structures (2308000000-E) | LF | 22.60 | $1,502.00 | $385.00 | $1,250.00 | $750.00 | $900.00 | $1,141.54 |
| 0058 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 36 | $1,935.00 | $966.00 | $1,350.00 | $2,000.00 | $1,925.00 | $1,357.47 |
| 0059 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $1,740.00 | $880.00 | $1,350.00 | $2,000.00 | $1,750.00 | $1,259.26 |
| 0060 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 2 | $1,777.00 | $880.00 | $1,350.00 | $2,000.00 | $1,775.00 | $1,259.26 |
| 0061 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 27 | $2,044.00 | $1,036.00 | $1,350.00 | $2,000.00 | $1,700.00 | $1,435.76 |
| 0062 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 73 | $2,106.00 | $1,036.00 | $1,350.00 | $2,000.00 | $1,700.00 | $1,435.76 |
| 0063 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 61 | $2,106.00 | $1,036.00 | $1,350.00 | $2,000.00 | $1,700.00 | $1,435.76 |
| 0064 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 5 | $1,269.00 | $712.00 | $1,350.00 | $1,500.00 | $1,600.00 | $1,072.78 |
| 0065 | Concrete transitional section for catch basin (2440000000-N) | EACH | 15 | $1,248.00 | $1,100.00 | $850.00 | $1,350.00 | $1,490.00 | $1,379.29 |
| 0066 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 9 | $1,248.00 | $1,100.00 | $850.00 | $1,350.00 | $1,490.00 | $1,379.29 |
| 0067 | **"X**" concrete curb - (8" X 12") (2535000000-E) | LF | 770 | $31.10 | $23.66 | $25.00 | $35.80 | $40.40 | $39.10 |
| 0068 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 6,700 | $31.10 | $23.66 | $25.00 | $24.50 | $28.25 | $27.56 |
| 0069 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 23,550 | $36.70 | $28.15 | $25.00 | $27.75 | $32.00 | $30.88 |
| 0070 | 4" concrete sidewalk (2591000000-E) | SY | 2,900 | $64.00 | $49.25 | $45.00 | $54.45 | $77.00 | $60.68 |
| 0071 | Concrete curb ramps (2605000000-N) | EACH | 17 | $2,837.00 | $2,500.00 | $1,250.00 | $2,910.00 | $3,650.00 | $3,225.78 |
| 0072 | 6" concrete driveway (2612000000-E) | SY | 3,120 | $87.75 | $77.44 | $65.00 | $86.10 | $107.00 | $94.28 |
| 0073 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 5,925 | $87.75 | $77.44 | $72.00 | $77.30 | $81.25 | $78.98 |
| 0074 | Adjustment of manholes (2830000000-N) | EACH | 1 | $384.00 | $1,962.00 | $2,750.00 | $1,780.01 | $2,000.00 | $5,108.88 |
| 0075 | Steel beam guardrail (3030000000-E) | LF | 412.50 | $42.25 | $38.00 | $23.50 | $23.00 | $40.00 | $23.61 |
| 0076 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 2 | $112.00 | $100.00 | $100.00 | $350.00 | $105.00 | $359.35 |
| 0077 | Additional guardrail posts (3150000000-N) | EACH | 5 | $49.20 | $44.00 | $44.00 | $50.00 | $46.20 | $51.34 |
| 0078 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 2 | $1,062.00 | $950.00 | $950.00 | $1,100.00 | $997.50 | $1,129.40 |
| 0079 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 2 | $3,744.00 | $3,350.00 | $3,350.00 | $3,300.00 | $3,517.50 | $3,388.20 |
| 0080 | Remove existing guardrail (3360000000-E) | LF | 400 | $1.10 | $1.00 | $1.00 | $2.00 | $1.05 | $2.05 |
| 0081 | Rip rap, class I (3628000000-E) | TON | 410 | $127.00 | $97.50 | $95.00 | $75.00 | $88.00 | $84.58 |
| 0082 | Rip rap, class B (3649000000-E) | TON | 150 | $109.00 | $85.15 | $96.00 | $70.00 | $88.00 | $82.59 |
| 0083 | Geotextile for drainage (3656000000-E) | SY | 2,900 | $4.35 | $3.65 | $3.75 | $5.00 | $2.70 | $4.36 |
| 0084 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 3,185 | $10.70 | $9.00 | $8.00 | $7.75 | $8.14 | $10.07 |
| 0085 | Sign erection, type D (4096000000-N) | EACH | 1 | $178.00 | $150.00 | $305.00 | $250.00 | $262.50 | $216.43 |
| 0086 | Sign erection, type E (4102000000-N) | EACH | 119 | $88.75 | $75.00 | $240.00 | $215.00 | $225.75 | $196.29 |
| 0087 | Sign erection, type F (4108000000-N) | EACH | 22 | $118.00 | $100.00 | $340.00 | $225.00 | $236.25 | $186.23 |
| 0088 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 5 | $178.00 | $150.00 | $265.00 | $200.00 | $210.00 | $216.43 |
| 0089 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 8 | $178.00 | $150.00 | $265.00 | $185.00 | $194.25 | $196.29 |
| 0090 | Sign erect, reloc ** GRD MTD - (F) (4116100000-N) | EACH | 1 | $178.00 | $150.00 | $265.00 | $185.00 | $194.25 | $186.23 |
| 0091 | Disposal of support, wood (4141000000-N) | EACH | 1 | $59.25 | $50.00 | $16.00 | $5.00 | $5.25 | $51.34 |
| 0092 | Disposal of sign system, U-channel (4155000000-N) | EACH | 53 | $2.35 | $2.00 | $16.00 | $5.00 | $5.25 | $20.13 |
| 0093 | Disposal of sign system, wood (4158000000-N) | EACH | 1 | $2.35 | $2.00 | $16.00 | $5.00 | $5.25 | $20.13 |
| 0094 | Disposal of support, U-channel (4192000000-N) | EACH | 14 | $2.35 | $2.00 | $16.00 | $5.00 | $5.25 | $20.13 |
| 0095 | Work zone signs (stationary) (4400000000-E) | SF | 1,716 | $13.90 | $10.30 | $6.65 | $6.75 | $7.09 | $11.00 |
| 0096 | Work zone signs (portable) (4405000000-E) | SF | 180 | $11.00 | $49.65 | $30.00 | $8.35 | $16.70 | $22.00 |
| 0097 | Work zone signs (barricade mounted) (4410000000-E) | SF | 252 | $9.25 | $25.45 | $10.00 | $7.65 | $8.03 | $11.34 |
| 0098 | Portable changeable message sign (4420000000-N) | EACH | 2 | $4,423.00 | $8,565.00 | $15,000 | $9,100.00 | $8,500.00 | $991.40 |
| 0099 | Drums (4430000000-N) | EACH | 1,500 | $48.75 | $64.40 | $30.00 | $53.00 | $55.00 | $46.30 |
| 0100 | Cones (4435000000-N) | EACH | 500 | $25.45 | $26.70 | $10.00 | $21.50 | $25.00 | $10.07 |
| 0101 | Barricades (type III) (4445000000-E) | LF | 488 | $25.45 | $30.50 | $26.00 | $18.50 | $19.43 | $24.16 |
| 0102 | Flagger (4455000000-N) | DAY | 1,080 | $510.00 | $400.00 | $700.00 | $400.00 | $500.00 | $352.28 |
| 0103 | Temporary crash cushions (4465000000-N) | EACH | 2 | $6,159.00 | $10,000 | $5,500.00 | $6,000.00 | $5,250.00 | $6,159.79 |
| 0104 | Portable concrete barrier (4485000000-E) | LF | 120 | $83.75 | $65.00 | $135.00 | $74.10 | $52.50 | $46.30 |
| 0105 | Water filled barrier (4507000000-E) | LF | 500 | $75.25 | $67.60 | $95.00 | $52.00 | $80.00 | $53.38 |
| 0106 | Law enforcement (4510000000-N) | HR | 120 | $112.00 | $59.50 | $65.00 | $65.00 | $45.00 | $75.49 |
| 0107 | Temporary raised pavement markers (4650000000-N) | EACH | 630 | $9.50 | $8.50 | $8.50 | $8.50 | $8.93 | $8.56 |
| 0108 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 50,234 | $0.70 | $0.62 | $0.62 | $0.62 | $0.65 | $0.62 |
| 0109 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 8,118 | $1.50 | $1.36 | $1.36 | $1.36 | $1.43 | $1.37 |
| 0110 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 785 | $11.20 | $10.00 | $10.00 | $10.00 | $10.50 | $10.07 |
| 0111 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 115 | $106.00 | $95.00 | $95.00 | $95.00 | $99.75 | $95.63 |
| 0112 | Paint pavement marking lines (4") (4810000000-E) | LF | 250,335 | $0.15 | $0.14 | $0.14 | $0.14 | $0.15 | $0.14 |
| 0113 | Paint pavement marking lines (8") (4820000000-E) | LF | 12,220 | $0.30 | $0.28 | $0.28 | $0.28 | $0.29 | $0.28 |
| 0114 | Paint pavement marking lines (24") (4835000000-E) | LF | 1,590 | $5.85 | $5.22 | $5.22 | $5.22 | $5.48 | $5.25 |
| 0115 | Paint pavement marking symbol (4845000000-N) | EACH | 378 | $72.75 | $65.00 | $65.00 | $65.00 | $68.25 | $65.43 |
| 0116 | Removal of pavement marking lines (4") (4850000000-E) | LF | 500 | $2.25 | $2.00 | $2.00 | $2.00 | $2.10 | $2.01 |
| 0117 | Removal of pavement marking lines (8") (4860000000-E) | LF | 249 | $4.45 | $4.00 | $4.00 | $4.00 | $4.20 | $4.03 |
| 0118 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 13 | $58.00 | $52.00 | $52.00 | $52.00 | $54.60 | $52.35 |
| 0119 | Generic pavement marking item (LF) - yield line paint pavement marking (24") (4890000000-E) | LF | 100 | $27.95 | $25.00 | $30.00 | $25.00 | $26.25 | $25.17 |
| 0120 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90MILS) (4890000000-E) | LF | 40 | $27.95 | $25.00 | $30.00 | $25.00 | $26.25 | $25.17 |
| 0121 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 1,775 | $49.75 | $44.50 | $44.50 | $44.50 | $46.73 | $44.80 |
| 0122 | **" water line - (18") (5325000000-E) | LF | 296 | $191.00 | $168.00 | $168.00 | $240.00 | $84.00 | $226.25 |
| 0123 | 6" water line (5325600000-E) | LF | 20 | $84.25 | $74.20 | $74.20 | $640.00 | $280.00 | $99.93 |
| 0124 | 8" water line (5325800000-E) | LF | 323 | $63.75 | $56.10 | $56.10 | $150.00 | $285.00 | $75.55 |
| 0125 | 16" water line (5326600000-E) | LF | 5,063 | $242.00 | $213.00 | $213.00 | $295.00 | $290.00 | $286.86 |
| 0126 | DI H2O pipe fittings (5329000000-E) | LB | 19,855 | $19.65 | $17.30 | $17.30 | $14.00 | $12.00 | $23.30 |
| 0127 | 6" valve (5540000000-E) | EACH | 12 | $3,223.00 | $2,840.00 | $2,840.00 | $5,000.00 | $3,000.00 | $3,824.86 |
| 0128 | 8" valve (5546000000-E) | EACH | 7 | $4,188.00 | $3,690.00 | $3,690.00 | $6,000.00 | $4,100.00 | $4,969.60 |
| 0129 | 16" valve (5558600000-E) | EACH | 11 | $18,613 | $16,400 | $16,400 | $23,000 | $18,500 | $22,087 |
| 0130 | Relocate water meter (5648000000-N) | EACH | 68 | $3,632.00 | $3,200.00 | $3,200.00 | $2,000.00 | $2,750.00 | $4,309.69 |
| 0131 | Reconnect water meter (5649000000-N) | EACH | 11 | $2,690.00 | $2,370.00 | $2,370.00 | $3,400.00 | $2,040.00 | $3,191.87 |
| 0132 | Fire hydrant (5666000000-N) | EACH | 11 | $7,979.00 | $7,030.00 | $7,030.00 | $9,000.00 | $7,350.00 | $9,467.85 |
| 0133 | Fire hydrant leg (5673000000-E) | LF | 76 | $111.00 | $98.10 | $125.00 | $250.00 | $200.00 | $132.11 |
| 0134 | 8" line stop (5678600000-E) | EACH | 4 | $16,332 | $14,390 | $14,390 | $13,000 | $6,700.00 | $19,380 |
| 0135 | **" water service line - (2") (5686000000-E) | LF | 197 | $118.00 | $104.00 | $125.00 | $110.00 | $59.00 | $140.06 |
| 0136 | Water service line (<2") (5686500000-E) | LF | 2,339 | $81.00 | $71.40 | $85.00 | $96.00 | $85.00 | $96.16 |
| 0137 | Sanitary sewer clean-out (5768000000-N) | EACH | 17 | $1,498.00 | $1,320.00 | $1,320.00 | $500.00 | $1,500.00 | $1,777.75 |
| 0138 | Abandon 8" utility pipe (5801000000-E) | LF | 235 | $47.65 | $42.00 | $42.00 | $65.00 | $20.00 | $56.56 |
| 0139 | Abandon 16" utility pipe (5810000000-E) | LF | 5,323 | $22.45 | $19.80 | $20.00 | $25.00 | $26.00 | $26.67 |
| 0140 | Remove fire hydrant (5815500000-N) | EACH | 11 | $1,884.00 | $1,660.00 | $1,660.00 | $3,750.00 | $750.00 | $2,235.65 |
| 0141 | Direct drill **" - (18") (5872600000-E) | LF | 211 | $163.00 | $144.00 | $175.00 | $610.00 | $260.00 | $193.93 |
| 0142 | Temporary silt fence (6000000000-E) | LF | 45,690 | $3.05 | $1.25 | $2.65 | $2.93 | $3.07 | $3.46 |
| 0143 | Stone for erosion control, class A (6006000000-E) | TON | 1,120 | $0.01 | $60.00 | $25.00 | $70.00 | $95.00 | $45.87 |
| 0144 | Stone for erosion control, class B (6009000000-E) | TON | 4,010 | $102.00 | $55.00 | $30.00 | $70.00 | $96.00 | $48.29 |
| 0145 | Sediment control stone (6012000000-E) | TON | 3,680 | $96.25 | $40.00 | $30.00 | $65.00 | $105.00 | $39.21 |
| 0146 | Temporary mulching (6015000000-E) | ACRE | 40.50 | $1,806.00 | $1,600.00 | $1,150.00 | $2,026.01 | $1,714.29 | $1,660.83 |
| 0147 | Seed for temporary seeding (6018000000-E) | LB | 2,100 | $2.25 | $2.00 | $2.20 | $1.07 | $2.14 | $2.08 |
| 0148 | Fertilizer for temporary seeding (6021000000-E) | TON | 11 | $960.00 | $850.00 | $1,400.00 | $319.90 | $910.71 | $882.31 |
| 0149 | Temporary slope drains (6024000000-E) | LF | 585 | $112.25 | $37.70 | $30.00 | $18.00 | $29.25 | $25.19 |
| 0150 | Safety fence (6029000000-E) | LF | 1,120 | $2.80 | $1.85 | $3.00 | $1.92 | $3.09 | $2.05 |
| 0151 | Silt excavation (6030000000-E) | CY | 23,370 | $1.00 | $1.00 | $0.50 | $9.00 | $0.01 | $12.93 |
| 0152 | Matting for erosion control (6036000000-E) | SY | 20,500 | $1.80 | $1.60 | $1.80 | $1.81 | $1.71 | $1.66 |
| 0153 | Coir fiber mat (6037000000-E) | SY | 920 | $7.10 | $7.00 | $4.50 | $5.60 | $7.50 | $7.27 |
| 0154 | 1/4" hardware cloth (6042000000-E) | LF | 10,650 | $6.75 | $14.20 | $4.25 | $6.40 | $6.51 | $5.39 |
| 0155 | Special stilling basins (6070000000-N) | EACH | 4 | $1,960.00 | $750.00 | $2,750.00 | $750.00 | $416.63 | $1,105.37 |
| 0156 | Flocculant (6071002000-E) | LB | 5,390 | $8.10 | $1.00 | $1.00 | $7.46 | $5.36 | $5.19 |
| 0157 | Coir fiber wattle (6071012000-E) | LF | 8,360 | $9.05 | $10.00 | $9.00 | $13.60 | $8.57 | $8.31 |
| 0158 | Coir fiber baffle (6071030000-E) | LF | 3,760 | $7.75 | $6.00 | $5.35 | $6.66 | $8.57 | $4.62 |
| 0159 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 18 | $5,848.00 | $3,465.00 | $750.00 | $900.00 | $2,175.00 | $1,460.62 |
| 0160 | **" skimmer - (2") (6071050000-E) | EACH | 3 | $6,131.00 | $3,660.00 | $1,250.00 | $1,100.00 | $2,400.00 | $1,627.14 |
| 0161 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 4 | $6,414.00 | $3,875.00 | $1,575.00 | $1,300.00 | $2,700.00 | $1,809.77 |
| 0162 | Seeding and mulching (6084000000-E) | ACRE | 50 | $2,935.00 | $2,600.00 | $2,050.00 | $3,012.36 | $2,785.71 | $2,699.16 |
| 0163 | Mowing (6087000000-E) | ACRE | 27 | $169.00 | $150.00 | $395.00 | $186.61 | $160.71 | $155.72 |
| 0164 | Seed for repair seeding (6090000000-E) | LB | 450 | $4.50 | $4.00 | $4.15 | $5.33 | $4.29 | $4.15 |
| 0165 | Fertilizer for repair seeding (6093000000-E) | TON | 2 | $1,129.00 | $1,000.00 | $1,400.00 | $479.85 | $1,071.43 | $1,038.14 |
| 0166 | Seed for supplemental seeding (6096000000-E) | LB | 725 | $4.50 | $4.00 | $4.15 | $5.33 | $4.29 | $4.15 |
| 0167 | Fertilizer topdressing (6108000000-E) | TON | 21.50 | $1,016.00 | $900.00 | $1,400.00 | $479.84 | $964.29 | $934.32 |
| 0168 | Impervious dike (6111000000-E) | LF | 445 | $92.00 | $75.00 | $250.00 | $350.00 | $60.00 | $400.00 |
| 0169 | Specialized hand mowing (6114500000-N) | MHR | 10 | $169.00 | $150.00 | $225.00 | $58.65 | $160.71 | $155.72 |
| 0170 | Manual litter removal (6114800000-N) | MHR | 15 | $169.00 | $150.00 | $175.00 | $58.65 | $160.71 | $155.72 |
| 0171 | Litter disposal (6114900000-E) | TON | 4 | $226.00 | $200.00 | $950.00 | $319.90 | $214.29 | $207.63 |
| 0172 | Response for erosion control (6117000000-N) | EACH | 100 | $141.00 | $145.00 | $60.00 | $453.19 | $133.93 | $129.77 |
| 0173 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,136.00 | $750.00 | $2,350.00 | $1,526.89 | $1,500.00 | $845.76 |
| 0174 | Culvert diversion channel (6120000000-E) | CY | 192 | $58.00 | $50.00 | $125.00 | $53.97 | $115.00 | $25.00 |
| 0175 | Reforestation (6123000000-E) | ACRE | 0.10 | $28,224 | $25,000 | $25,000 | $8,450.00 | $26,786 | $25,953 |
| 0176 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 12 | $1,069.00 | $1,025.00 | $2,350.00 | $666.61 | $525.00 | $1,332.58 |
| 0177 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 2 | $1,205.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,129.55 | $1,093.46 |
| 0178 | Signal cable (7060000000-E) | LF | 8,970 | $4.55 | $4.00 | $4.00 | $4.00 | $4.24 | $4.11 |
| 0179 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 56 | $1,417.00 | $1,252.00 | $1,252.00 | $1,252.00 | $1,327.88 | $1,285.46 |
| 0180 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 8 | $1,688.00 | $1,492.00 | $1,492.00 | $1,492.00 | $1,582.43 | $1,531.88 |
| 0181 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $2,039.00 | $1,802.00 | $1,802.00 | $1,802.00 | $1,911.21 | $1,850.16 |
| 0182 | Messenger cable (1/4") (7252000000-E) | LF | 2,160 | $5.75 | $5.10 | $5.10 | $5.10 | $5.41 | $5.24 |
| 0183 | Messenger cable (3/8") (7264000000-E) | LF | 3,270 | $3.50 | $3.10 | $3.10 | $3.10 | $3.29 | $3.18 |
| 0184 | Tracer wire (7279000000-E) | LF | 3,770 | $1.60 | $1.40 | $1.40 | $1.40 | $1.48 | $1.44 |
| 0185 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 850 | $12.80 | $11.30 | $11.30 | $11.30 | $11.98 | $11.60 |
| 0186 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 2,720 | $20.35 | $18.00 | $18.00 | $18.00 | $19.09 | $18.48 |
| 0187 | Unpaved trench (***********) - (3, 2") (7300000000-E) | LF | 40 | $30.55 | $27.00 | $27.00 | $27.00 | $28.64 | $27.72 |
| 0188 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 1,427 | $35.05 | $31.00 | $31.00 | $31.00 | $32.88 | $31.83 |
| 0189 | Junction box (***************) - (special over-sized, heavy duty) (7312000000-N) | EACH | 2 | $1,245.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,166.67 | $1,129.40 |
| 0190 | Junction box (standard size) (7324000000-N) | EACH | 19 | $463.00 | $409.00 | $409.00 | $409.00 | $433.79 | $419.93 |
| 0191 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 17 | $799.00 | $706.00 | $706.00 | $706.00 | $748.79 | $724.87 |
| 0192 | Wood pole (7360000000-N) | EACH | 13 | $1,245.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,166.67 | $1,129.40 |
| 0193 | Guy assembly (7372000000-N) | EACH | 34 | $665.00 | $588.00 | $588.00 | $588.00 | $623.64 | $603.72 |
| 0194 | 1" riser with weatherhead (7408000000-E) | EACH | 3 | $508.00 | $449.00 | $449.00 | $449.00 | $476.21 | $461.00 |
| 0195 | 2" riser with weatherhead (7420000000-E) | EACH | 8 | $720.00 | $636.00 | $636.00 | $636.00 | $674.55 | $653.00 |
| 0196 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 5 | $1,042.00 | $921.00 | $921.00 | $921.00 | $976.82 | $945.61 |
| 0197 | Inductive loop sawcut (7444000000-E) | LF | 600 | $9.85 | $8.70 | $8.70 | $8.70 | $9.23 | $8.93 |
| 0198 | Lead-in cable (14-2) (7456100000-E) | LF | 2,110 | $3.60 | $3.20 | $3.20 | $3.20 | $3.39 | $3.29 |
| 0199 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 12,699 | $5.65 | $5.00 | $5.00 | $5.00 | $5.30 | $5.13 |
| 0200 | Drop cable (7528000000-E) | LF | 305 | $5.65 | $5.00 | $5.00 | $5.00 | $5.30 | $5.13 |
| 0201 | Splice enclosure (7540000000-N) | EACH | 3 | $2,661.00 | $2,352.00 | $2,352.00 | $2,352.00 | $2,494.54 | $2,414.86 |
| 0202 | Modify splice enclosure (7541000000-N) | EACH | 1 | $2,332.00 | $2,061.00 | $2,061.00 | $2,061.00 | $2,185.91 | $2,116.08 |
| 0203 | Interconnect center (7552000000-N) | EACH | 4 | $3,085.00 | $2,727.00 | $2,727.00 | $2,727.00 | $2,892.27 | $2,799.88 |
| 0204 | Delineator marker (7566000000-N) | EACH | 18 | $197.00 | $174.00 | $174.00 | $174.00 | $184.55 | $178.65 |
| 0205 | Modify radio installation (7575142060-N) | EACH | 1 | $1,183.00 | $1,046.00 | $1,046.00 | $1,046.00 | $1,109.40 | $1,073.96 |
| 0206 | Metal strain signal pole (7576000000-N) | EACH | 9 | $18,083 | $15,982 | $15,982 | $15,982 | $16,951 | $16,409 |
| 0207 | Soil test (7613000000-N) | EACH | 9 | $4,710.00 | $4,163.00 | $4,163.00 | $4,163.00 | $4,415.30 | $4,274.26 |
| 0208 | Drilled pier foundation (7614100000-E) | CY | 67.50 | $1,797.00 | $1,588.00 | $1,588.00 | $1,588.00 | $1,684.24 | $1,630.44 |
| 0209 | Sign for signals (7636000000-N) | EACH | 6 | $635.00 | $561.00 | $561.00 | $561.00 | $595.00 | $575.99 |
| 0210 | Type II pedestal with foundation (7642200000-N) | EACH | 2 | $3,393.00 | $2,999.00 | $2,999.00 | $2,999.00 | $3,180.76 | $3,079.15 |
| 0211 | Signal cabinet foundation (7684000000-N) | EACH | 3 | $1,134.00 | $1,002.00 | $1,002.00 | $1,002.00 | $1,062.73 | $1,028.78 |
| 0212 | Contlrs with CBNT (**************) - (type 2070LX, base mounted) (7696000000-N) | EACH | 5 | $26,592 | $23,503 | $23,503 | $23,503 | $24,927 | $24,131 |
| 0213 | Detector card (type 170) (7744000000-N) | EACH | 12 | $260.00 | $230.00 | $230.00 | $230.00 | $243.94 | $236.15 |
| 0214 | Cabinet base extender (7901000000-N) | EACH | 5 | $619.00 | $547.00 | $547.00 | $547.00 | $580.15 | $561.62 |
| 0215 | Metal pole foundation removal (7960000000-N) | EACH | 1 | $2,111.00 | $1,866.00 | $1,866.00 | $1,866.00 | $1,979.09 | $1,915.87 |
| 0216 | Metal pole removal (7972000000-N) | EACH | 1 | $855.00 | $756.00 | $756.00 | $756.00 | $801.82 | $776.21 |
| 0217 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 3 | $2,618.00 | $2,314.00 | $2,314.00 | $2,314.00 | $2,454.24 | $2,375.84 |
| 0218 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 15 | $16,749 | $14,803 | $14,803 | $14,803 | $15,700 | $15,199 |
| 0219 | Remv exist STR ****** culv (402) - (55+17.00 -L-) (8056000000-N) | LS | 1 | $58,036 | $50,000 | $75,000 | $40,000 | $25,000 | $500,000 |
| 0220 | Box culv excav @ ******** - (55+17.00 -L-) (8130000000-N) | LS | 1 | $175,450 | $125,000 | $150,000 | $75,000 | $250,000 | $400,000 |
| 0221 | Foundation conditioning material, box culvert (8133000000-E) | TON | 355 | $98.75 | $85.00 | $75.00 | $73.60 | $80.00 | $80.00 |
| 0222 | Class A concrete (culvert) (8196000000-E) | CY | 594.30 | $813.00 | $700.00 | $750.00 | $1,000.00 | $2,500.00 | $1,500.00 |
| 0223 | Reinforcing steel (culvert) (8245000000-E) | LB | 85,862 | $2.30 | $2.00 | $3.00 | $2.43 | $2.25 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of February 17, 2026. Compiled by Mirage Metrics.