Zachry Construction Corporation submitted 80 bids on North Carolina DOT contracts in the data, from 21 MAY 2013 to 20 OCT 2026, and was the low bidder on 11 of them (14%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $348,170,859
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 1 | 0 | 0% |
| 2015 | 3 | 0 | 0% |
| 2016 | 2 | 2 | 100% |
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 4 | 1 | 25% |
| 2021 | 7 | 1 | 14% |
| 2022 | 5 | 0 | 0% |
| 2023 | 11 | 3 | 27% |
| 2024 | 14 | 1 | 7% |
| 2025 | 22 | 2 | 9% |
| 2026 | 9 | 1 | 11% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 10 | 2 | 20% |
| Haywood | 9 | 3 | 33% |
| Johnston | 3 | 1 | 33% |
| Chatham | 3 | 0 | 0% |
| Guilford | 3 | 1 | 33% |
| Forsyth | 3 | 0 | 0% |
| Mecklenburg | 2 | 0 | 0% |
| Cabarrus | 2 | 0 | 0% |
| Stokes | 2 | 0 | 0% |
| Davie | 2 | 0 | 0% |
| Beaufort | 2 | 0 | 0% |
| Rockingham | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Drainage ditch excavation | 0134000000-E | CY | 63 | 29 (46%) | $9.00 | $13.33 |
| Geotextile for soil stabilization | 0196000000-E | SY | 76 | 28 (37%) | $2.67 | $2.50 |
| Incidental stone base | 1220000000-E | TON | 67 | 28 (42%) | $44.61 | $40.00 |
| 6" outlet pipe | 2077000000-E | LF | 67 | 26 (39%) | $38.21 | $35.00 |
| Flagger | 4455000000-N | DAY | 64 | 26 (41%) | $351.14 | $374.36 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 66 | 25 (38%) | $0.37 | $0.27 |
| Concrete washout structure | 6117500000-N | EACH | 70 | 23 (33%) | $1,003.66 | $1,277.12 |
| Subdrain pipe outlet | 2070000000-N | EACH | 67 | 22 (33%) | $441.56 | $352.00 |
| Foundation conditioning material, minor structures | 0318000000-E | TON | 76 | 21 (28%) | $52.56 | $42.00 |
| Geotextile for subsurface drains | 2026000000-E | SY | 62 | 21 (34%) | $3.00 | $4.10 |
| Subdrain coarse aggregate | 2036000000-E | CY | 62 | 21 (34%) | $75.04 | $68.63 |
| Pipe removal | 0995000000-E | LF | 73 | 20 (27%) | $28.61 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 30 | 21 of 30 |
| Caton Construction Group Inc | 30 | 9 of 30 |
| W C English Incorporated | 30 | 15 of 30 |
| Smith-Rowe, LLC | 24 | 21 of 24 |
| FSC II LLC DBA Fred Smith Company | 22 | 17 of 22 |
| Dane Construction, Inc. | 20 | 8 of 20 |
| S T Wooten Corporation | 19 | 14 of 19 |
| Conti Civil LLC | 17 | 11 of 17 |
| Branch Civil Inc | 16 | 11 of 16 |
| Crowder Construction Company | 13 | 3 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C204338 | Wake | WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53 | 4 of 8 | $44,930,882 | +12% |
| 21 JUL 2026 | C205225 | Polk | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 | 3 of 3 | $36,504,473 | +14% |
| 19 MAY 2026 | C204773 | Gaston, Mecklenburg | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. INTERSECTIONS OF NC-7 AND SR-2083 AT US-74, B | 1 of 10 | $78,019,775 | Low, 1.0% under the second |
| 21 APR 2026 | C204857 | Johnston | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD) | 6 of 7 | $14,755,117 | +20% |
| 21 APR 2026 | C205180 | Henderson | GRADING, DRAINAGE, PAVING, AND CULVERT., GRADING, DRAINAGE, PAVING, AND RETAINING WALL., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SIT | 2 of 2 | $23,879,538 | +23% |
| 24 MAR 2026 | C205165 | Polk | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 | 3 of 5 | $36,465,398 | +17% |
| 17 FEB 2026 | C205035 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-13 (BERKELEY BLVD) FROM SR-1003 (NEW HOPE RD) TO US-70 BYPASS | 6 of 8 | $34,903,188 | +14% |
| 17 FEB 2026 | C205098 | Davidson, Forsyth | PAVEMENT REHABILITATION. I-285/US-52/NC-8 FROM SR-3010 (OLD US-52) TO SR-4205 (S MAIN ST) | 6 of 6 | $12,823,836 | +80% |
| 20 JAN 2026 | C204814 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #950020 OVER CSX TRANSPORTATION RAILROAD TRACKS ON US-70 BUS | 5 of 7 | $10,501,999 | +20% |
| 16 DEC 2025 | C205018 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. UPGRADE FUTURE I-73/US-220 AT US-311/NC-135 INTERCHANGE AND REPLACE BRIDGE #780074 | 3 of 6 | $20,794,730 | +15% |
| 18 NOV 2025 | C205044 | Surry, Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | 2 of 6 | $17,043,768 | +2.0% |
| 18 NOV 2025 | C205086 | Jackson | GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNING, SIGNALS, & STRUCTURES. US-23 BUSINESS AT MILL ST, TO | 2 of 4 | $104,361,751 | +1.0% |
| 21 OCT 2025 | C204711 | Beaufort | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060009 OVER BLOUNTS CREEK ON SR-1112 (MOUTH OF THE CREEK ROAD) | 4 of 8 | $15,558,569 | +41% |
| 21 OCT 2025 | C205093 | Davie | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40 | 6 of 10 | $37,220,364 | +16% |
| 21 OCT 2025 | C205133 | Mitchell | ROADWAY AND CULVERT. (EXPRESS DESIGN BUILD), ROADWAY AND STRUCTURE. (EXPRESS DESIGN BUILD). BRIDGE ON CANE CRK ON SR-1207, BRIDGE OVER BIG R | 3 of 3 | $9,567,615 | +67% |
| 16 SEP 2025 | C205033 | Bertie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #070024 OVER CASHIE RIVER ON NC-11 | 4 of 6 | $6,795,912 | +58% |
| 19 AUG 2025 | C204975 | Forsyth | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. I-40/US-311 AT NC-109 INTERCHANGE | 2 of 3 | $43,525,295 | +12% |
| 19 AUG 2025 | C204956 | Burke, Caldwell | DRAINAGE, GRADING, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #110010 OVER CATAWBA RIVER ON SR-1001 (CONNELL | 3 of 3 | $31,764,528 | +3.0% |
| 15 JUL 2025 | C205074 | Forsyth | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-65 (BETHANIA-RURAL HALL RD) FROM US-52 TO SR-3983 (NORTHRIDGE PARK DR) | 6 of 7 | $13,829,578 | +12% |
| 17 JUN 2025 | C205041 | Forsyth | GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY) | 3 of 8 | $13,867,719 | +3.0% |
| 17 JUN 2025 | C205015 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | 1 of 8 | $18,127,601 | Low, 7.0% under the second |
| 20 MAY 2025 | C205032 | Chatham | DRAINAGE, GRADING, PAVING, SIGNALS, AND STRUCTURES. SR-2700 (CHATHAM PARK WAY) FROM US-15/US-501 SOUTH OF PITTSBORO TO US-64 BUSINESS | 11 of 12 | $52,756,960 | +33% |
| 15 APR 2025 | C205061 | Guilford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #400224 OVER SOUTH BUFFALO CREEK ON SR-3000 (MCCONNELL RD) | 6 of 8 | $5,700,491 | +43% |
| 15 APR 2025 | C205059 | Stokes | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840286 OVER LITTLE YADKIN RIVER ON SR-1236 (NORTH OLD 52) | 5 of 7 | $8,263,961 | +27% |
| 18 MAR 2025 | C204933 | Chatham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. CHATHAM PARKWAY FROM NORTH OF PROPOSED GRANT DRIVE TO US-15/US-501 | 11 of 12 | $19,661,969 | +33% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.