NCDOT contract C205044 bid tabulation

GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77. Let by North Carolina DOT on November 18, 2025, Surry, Yadkin. 6 bids received; low bid $16,781,818 by Smith-Rowe, LLC.

Owner
North Carolina DOT
Letting
18 NOV 2025
Pay items
189
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Smith-Rowe, LLC$16,781,818Low
2Zachry Construction Corporation$17,043,768+2.0%
3W C English Incorporated$19,502,517+16%
4Caton Construction Group Inc$19,548,450+16%
5Crowder Construction Company$21,817,897+30%
6Blythe Construction Inc$22,843,170+36%
NCDOT contract C205044: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Smith-Rowe, LLC2. Zachry Construction Corporation3. W C English Incorporated4. Caton Construction Group Inc5. Crowder Construction Company6. Blythe Construction Inc
0001Mobilization (0000100000-N)LS1$839,000$851,823$1,000,000$977,423$1,090,895$1,126,000
0002Construction surveying (0000400000-N)LS1$45,000$250,000$169,188$44,746$118,603$360,000
0003Unclassified excavation (0022000000-E)CY22,640$0.01$12.30$20.27$25.50$27.75$20.00
0004Supplementary clearing & grubbing (0050000000-E)ACRE1$1.00$23,326$1.15$28,210$5,282.06$5,000.00
0005Undercut excavation (0057000000-E)CY450$39.61$56.89$28.70$78.00$73.11$20.00
0006Grading (0063000000-N)LS1$1,742,086$750,000$925,000$898,553$520,553$4,860,000
0007Drainage ditch excavation (0134000000-E)CY330$0.01$8.21$20.37$38.50$62.68$26.00
0008Select granular material (0195000000-E)CY400$0.01$71.85$75.35$123.50$97.61$66.00
0009Geotextile for soil stabilization (0196000000-E)SY500$3.45$3.07$3.73$6.50$6.20$5.00
0010Temporary shoring (0199000000-E)SF1,035$59.48$70.00$88.70$68.73$286.21$150.00
0011Generic grading item (LS) - type 1 bridge approach fill, station 32+28.00 -L- (0248000000-N)LS1$54,800$109,525$37,371$71,874$130,034$50,000
0012Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E)TON100$83.28$105.53$118.09$348.00$1,523.30$200.00
0013Foundation conditioning material, minor structures (0318000000-E)TON240$61.85$60.58$68.38$86.50$94.34$70.00
0014FND condit geotextile (4A) (0321000000-E)SY760$6.25$4.30$4.89$6.50$4.56$5.00
0015**" side drain pipe - (30") (0342000000-E)LF12$281.80$149.77$252.43$196.50$341.74$140.00
001615" side drain pipe (0343000000-E)LF784$89.16$86.18$77.04$149.50$130.88$140.00
001718" side drain pipe (0344000000-E)LF52$150.04$107.58$147.43$162.00$176.20$135.00
001824" side drain pipe (0345000000-E)LF76$131.86$136.80$120.05$176.00$163.10$130.00
001915" RC pipe culverts, class III (0366000000-E)LF160$115.34$97.48$118.14$126.50$198.39$110.00
002015" RC pipe culverts, class IV (0448200000-E)LF60$90.54$104.08$117.30$134.50$186.91$130.00
002118" RC pipe culverts, class IV (0448300000-E)LF164$111.87$128.34$136.41$264.50$193.22$125.00
002230" RC pipe culverts, class IV (0448500000-E)LF40$362.93$234.83$222.50$374.00$354.28$130.00
002315" CS pipe culverts, 0.064" thick (0582000000-E)LF80$108.14$79.56$129.69$370.50$227.32$95.00
002424" CS pipe culverts, 0.064" thick (0594000000-E)LF448$121.51$120.71$158.19$159.00$203.91$155.00
0025**" CS elbow *****" thick - (15", 0.064") (0636000000-E)EACH2$300.00$1,003.66$530.31$1,919.00$916.40$450.00
0026**" CS elbow *****" thick - (24", 0.064") (0636000000-E)EACH8$400.00$1,209.38$763.74$2,256.00$1,214.64$500.00
0027**"WLD STL pipe grad B in soil - (18", 0.500") (0973100000-E)LF38$1,358.66$2,169.54$1,753.75$739.80$1,813.27$700.00
0028**"WLD STL pipe grad B in soil - (24", 0.500") (0973100000-E)LF151$3,065.20$2,210.54$1,817.00$893.88$1,870.49$715.00
0029**"WLD STL pipe grad B not in soil - (18", 0.500") (0973300000-E)LF38$1.00$2,169.54$2,725.50$1,693.88$2,692.41$1,355.00
0030**"WLD STL pipe grad B not in soil - (24", 0.500") (0973300000-E)LF151$1.00$2,210.54$2,794.50$2,857.14$2,754.84$1,420.00
0031Pipe removal (0995000000-E)LF1,309$17.91$35.68$19.20$94.00$39.10$20.00
0032Shallow undercut (1099500000-E)CY1,200$17.75$23.90$20.13$53.50$75.38$25.00
0033Class IV subgrade stabilization (1099700000-E)TON3,800$48.14$44.28$47.21$92.50$82.51$40.00
0034Geotextile for subgrade stabilization (1112000000-E)SY5,640$4.73$5.33$5.02$6.00$4.39$5.00
0035Aggregate base course (1121000000-E)TON50$87.11$46.83$78.28$446.00$109.08$100.00
0036Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY630$16.02$16.26$23.00$9.55$20.20$25.00
0037Mill asp PVMT *****" DTH - (3") (1297000000-E)SY630$16.02$16.26$34.50$9.55$30.30$12.00
0038Asphalt conc base course, type B25.0C (1491000000-E)TON2,650$103.00$124.75$118.45$104.04$104.04$103.00
0039Asphalt conc intermediate course, type I19.0C (1503000000-E)TON2,110$103.00$124.75$118.45$104.04$104.04$103.00
0040Asphalt conc surface course, type S9.5B (1519000000-E)TON270$120.00$145.34$138.00$121.21$121.21$120.00
0041Asphalt conc surface course, type S9.5C (1523000000-E)TON1,770$113.00$136.86$129.95$114.14$114.14$113.00
0042Asphalt binder for plant mix (1575000000-E)TON345$865.00$1,047.65$994.75$873.74$873.74$865.00
0043Asphalt plant mix, pavement repair (1693000000-E)TON75$290.29$419.71$231.06$600.00$225.00$191.28
0044Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E)LF1,097$3.77$1.22$8.27$6.15$1.06$2.00
0045******"PCC PVMT thru LNS - (13") (1847000000-E)SY3,200$269.00$182.63$314.06$269.00$273.10$140.00
0046******"PCC PVMT misc - (13") (1869000000-E)SY775$237.00$161.00$276.70$237.00$240.61$140.00
0047Nonwoven geotextile interlayer (1920000000-E)SY3,920$6.20$4.81$9.09$5.50$4.86$6.00
0048Milled rumble strips (concrete shoulders) (1925000000-E)LF1,097$15.46$1.22$8.27$6.15$1.06$2.00
0049Right-of-way markers (2000000000-N)EACH9$275.00$479.67$316.25$302.00$0.00$355.00
0050Subdrain excavation (2022000000-E)CY44.80$27.63$13.20$44.83$85.00$70.03$56.00
0051Geotextile for subsurface drains (2026000000-E)SY200$4.29$2.85$4.30$12.00$5.89$20.00
0052Subdrain coarse aggregate (2036000000-E)CY33.60$94.34$84.47$104.47$209.00$159.94$150.00
00536" perforated subdrain pipe (2044000000-E)LF200$6.22$24.36$17.34$45.00$18.93$31.00
0054Subdrain pipe outlet (2070000000-N)EACH1$547.24$198.50$387.38$3,499.50$605.78$600.00
00556" outlet pipe (2077000000-E)LF6$64.21$47.96$57.80$104.00$66.79$125.00
0056Shoulder drain (2099000000-E)LF2,150$15.12$24.36$27.08$24.30$24.75$26.83
00574" shoulder drain pipe (2110000000-E)LF2,150$8.13$21.44$2.88$2.58$2.63$2.85
00584" outlet pipe for shoulder drains (2121000000-E)LF170$22.30$22.11$33.73$30.26$30.83$33.42
0059Concrete pad for shoulder drain pipe outlet (2132000000-N)EACH1$528.42$508.09$632.73$567.71$578.27$626.88
0060Temporary steel plate covers for masonry drainage structure (2190000000-N)EACH3$1,939.89$9,947.48$1,288.92$2,008.50$1,606.17$3,100.00
0061Endwalls (2209000000-E)CY1.40$2,730.38$2,402.94$3,397.01$5,191.50$8,418.52$3,000.00
0062Flowable fill (2275000000-E)CY36$769.13$402.06$294.75$352.50$856.31$225.00
0063Masonry drainage structures (2286000000-N)EACH42$5,086.71$4,499.33$5,741.44$8,648.00$13,336$3,000.00
0064Masonry drainage structures (2308000000-E)LF22.10$704.53$719.77$640.06$1,027.50$1,272.64$700.00
0065Frame with two grates, STD 840.20 (2364200000-N)EACH14$2,864.77$1,137.82$1,456.16$1,217.50$1,442.14$1,500.00
0066Frame with two grates, STD 840.22 (2365000000-N)EACH15$2,850.53$1,137.82$1,554.35$1,217.50$1,442.15$1,500.00
0067Frame with two grates, STD 840.29 (2367000000-N)EACH3$1,311.13$1,137.82$1,738.93$1,217.50$1,442.15$1,500.00
0068Frame with cover, STD 840.54 (2396000000-N)EACH1$1,176.48$963.99$1,211.90$910.50$1,201.88$1,500.00
0069Steel frame with two grates, STD 840.37 (2407000000-N)EACH7$3,299.79$3,328.28$2,169.60$4,312.00$4,470.19$3,500.00
0070Shoulder berm gutter (2556000000-E)LF570$50.00$40.88$57.62$56.35$80.25$50.00
0071Precast reinforced concrete barrier, single faced (2724000000-E)LF207$124.66$103.35$130.79$96.34$172.00$120.00
0072Steel beam guardrail (3030000000-E)LF737.50$23.00$28.13$26.45$23.00$24.40$25.00
0073Additional guardrail posts (3150000000-N)EACH10$1.00$1.23$1.15$1.00$1.06$1.00
0074Guardrail end units, type cat-1 (3210000000-N)EACH1$950.00$1,161.99$1,092.50$950.00$1,007.86$950.00
0075Guardrail end units, type TL-3 (3287000000-N)EACH5$3,200.00$3,914.03$3,680.00$3,200.00$3,394.88$3,200.00
0076Guardrail anchor units, type B-77 (3317000000-N)EACH6$2,600.00$3,180.16$3,105.00$2,600.00$2,758.34$2,600.00
0077Remove & reset existing guardrail (3345000000-E)LF222$10.00$12.23$11.50$10.00$10.61$10.00
0078Remove existing guardrail (3360000000-E)LF870$1.00$1.23$1.15$1.00$1.06$1.00
0079Remove existing guiderail (3365000000-E)LF3,100$2.00$2.44$2.30$2.00$2.12$2.00
0080Double faced cable guiderail (3389400000-E)LF3,050$14.00$17.12$16.10$14.00$14.85$14.00
0081Additional guiderail posts (3389500000-N)EACH10$1.00$91.74$86.25$75.00$79.57$75.00
0082Cable guiderail anchor units (3389600000-N)EACH4$2,500.00$3,057.84$2,875.00$2,500.00$2,652.25$2,500.00
0083Woven wire fence reset (3566000000-E)LF60$20.00$24.46$23.00$75.00$21.22$20.00
0084Rip rap, class I (3628000000-E)TON90$82.27$83.52$79.09$112.50$158.45$60.00
0085Geotextile for drainage (3656000000-E)SY3,770$5.28$4.19$4.11$5.50$4.79$5.00
0086Reinforced concrete sign foundations (4048000000-E)CY1.82$850.00$1,049.86$977.50$850.00$2,562.96$850.00
0087Plain concrete sign foundations (4054000000-E)CY0.30$10.00$12.35$11.50$10.00$6,137.83$10.00
0088Supports, breakaway steel beam (4060000000-E)LB1,508.50$9.00$11.12$10.35$9.00$6.37$9.00
0089Supports, simple steel beam (4066000000-E)LB304.27$14.00$17.29$16.10$14.00$6.37$14.00
0090Supports, 3-LB steel U-channel (4072000000-E)LF129$8.00$9.88$9.20$8.00$9.55$8.00
0091Sign erection, type D (4096000000-N)EACH2$250.00$308.79$287.50$250.00$212.18$250.00
0092Sign erection, type E (4102000000-N)EACH4$75.00$92.64$86.25$75.00$164.44$75.00
0093Sign erection, type *** (GRD MTD) - (A) (4110000000-N)EACH1$1,000.00$1,235.12$1,150.00$1,000.00$1,591.35$1,000.00
0094Sign erection, type *** (GRD MTD) - (B) (4110000000-N)EACH3$1,000.00$1,235.13$1,150.00$1,000.00$1,591.35$1,000.00
0095Disposal of sign system, steel beam (4152000000-N)EACH2$500.00$617.56$575.00$500.00$795.68$500.00
0096Disposal of sign system, U-channel (4155000000-N)EACH3$2.00$2.47$2.30$2.00$26.52$2.00
0097Disposal of sign system, wood (4158000000-N)EACH2$2.00$2.47$2.30$2.00$26.53$2.00
0098Work zone signs (stationary) (4400000000-E)SF602$7.50$6.42$8.63$6.10$6.38$7.50
0099High visibility stationary signs (4402000000-E)SF304$12.00$8.25$13.80$8.75$9.15$12.00
0100Work zone signs (portable) (4405000000-E)SF96$28.91$11.01$24.95$8.45$8.83$9.00
0101High visibility portable signs (4407000000-E)SF176$42.72$11.92$24.95$9.65$10.09$9.00
0102Work zone signs (barricade mounted) (4410000000-E)SF112$7.00$9.78$8.05$8.95$9.36$7.00
0103Flashing arrow board (4415000000-N)EACH7$3,300.00$2,385.12$1,539.21$2,100.00$2,195.55$2,500.00
0104Portable changeable message sign (4420000000-N)EACH5$12,365$11,131$9,825.39$8,478.26$8,154.90$11,000
0105Work zone digital speed limit signs (4423000000-N)EACH8$5,020.65$3,791.71$13,340$3,500.00$3,659.25$4,600.00
0106Work zone presence lighting (4424000000-N)EACH28$3,830.00$3,057.84$7,935.00$2,200.00$2,300.10$6,900.00
0107Drums (4430000000-N)EACH40$72.85$66.30$90.00$45.00$47.05$46.00
0108High visibility drums (4432000000-N)EACH100$160.15$66.30$112.15$56.00$58.55$68.00
0109Sequential flashing warning lights (4434000000-N)EACH30$228.40$165.12$182.54$135.00$141.14$95.00
0110Barricades (type III) (4445000000-E)LF72$20.00$24.46$23.00$25.00$26.14$20.00
0111Flagger (4455000000-N)DAY10$1,048.75$375.89$449.06$1,450.00$1,515.98$354.29
0112Temporary crash cushions (4465000000-N)EACH3$10,975$13,760$9,487.50$11,608$8,801.40$11,250
0113TMA (4480000000-N)EACH2$11,850$34,859$14,417$33,000$20,701$46,800
0114Portable concrete barrier (4485000000-E)LF4,950$43.20$49.31$46.37$41.60$72.50$40.32
0115Portable concrete barrier (anchored) (4490000000-E)LF2,250$59.70$71.11$66.86$59.99$62.03$58.14
0116Law enforcement (4510000000-N)HR500$91.75$95.94$115.00$100.00$83.64$65.00
0117Temporary glare screen (4570000000-E)LF3,325$23.45$24.32$22.87$20.52$21.22$19.89
0118Generic traffic control item (EA) - connected lane closure system (4600000000-N)EACH1$3,732.83$2,935.53$1,150.00$1,800.00$1,881.90$1,000.00
0119Temporary raised pavement markers (4650000000-N)EACH260$12.50$15.29$5.75$12.50$13.26$30.00
0120Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF1,648$1.65$2.02$0.23$1.65$1.75$7.50
0121Thermoplastic pavement marking symbol (90 mils) (4725000000-E)EACH10$250.00$305.80$287.50$250.00$265.23$600.00
0122Cold appl plastic sym type ** - (IV) (4805000000-N)EACH5$300.00$366.94$230.00$300.00$318.27$2,850.00
0123Paint pavement marking lines (6") (4815000000-E)LF7,425$1.00$1.23$0.35$1.00$1.06$1.25
0124Polyurea lines (**", *** mils) - (12", 30) (4846000000-E)LF430$3.50$4.28$17.25$3.50$3.71$20.00
0125Polyurea lines (**", *** mils) - (6", 30) (4846000000-E)LF27,355$1.50$1.83$5.75$1.50$1.59$1.55
0126Removal of pavement marking lines (6") (4855000000-E)LF7,000$1.80$0.98$2.30$0.80$0.85$1.50
0127Generic pavement marking item (LF) - integrated mutipolymer pavement marking lines, (6", 90 mils) (4890000000-E)LF27,399$1.85$2.27$11.50$1.85$1.96$1.55
0128Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH132$45.00$55.03$80.50$45.00$47.74$175.00
0129Permanent raised pavement markers (4900000000-N)EACH35$25.00$30.57$80.50$25.00$26.52$135.00
0130Portable lighting (5255000000-N)LS1$150,000$38,703$100,585$60,000$32,393$250,000
0131Temporary silt fence (6000000000-E)LF1,860$2.00$3.07$2.30$2.50$3.09$3.15
0132Stone for erosion control, class A (6006000000-E)TON455$87.55$79.52$75.38$101.50$95.20$65.00
0133Stone for erosion control, class B (6009000000-E)TON685$86.40$79.52$75.95$99.50$95.16$65.00
0134Sediment control stone (6012000000-E)TON1,550$0.01$60.44$70.81$87.50$84.64$60.00
0135Temporary mulching (6015000000-E)ACRE6$1,800.00$1,536.41$2,070.00$1,250.00$1,751.00$1,800.00
0136Seed for temporary seeding (6018000000-E)LB400$1.00$1.23$1.15$1.00$2.06$2.00
0137Fertilizer for temporary seeding (6021000000-E)TON3$1.00$1,597.87$1,150.00$1,300.00$978.50$1,000.00
0138Temporary slope drains (6024000000-E)LF360$22.85$22.97$15.39$50.50$30.50$23.25
0139Safety fence (6029000000-E)LF960$2.00$2.46$2.30$2.00$3.09$3.15
0140Silt excavation (6030000000-E)CY3,490$0.01$14.76$0.01$98.50$34.87$20.00
0141Matting for erosion control (6036000000-E)SY12,000$1.35$1.96$1.55$1.60$1.70$1.70
0142Coir fiber mat (6037000000-E)SY100$30.00$6.63$23.00$5.40$6.18$6.25
01431/4" hardware cloth (6042000000-E)LF1,110$4.00$4.92$4.60$9.00$5.15$5.25
0144Low permeability geotextile (6043000000-E)SY100$13.50$5.99$4.71$4.08$6.18$6.25
0145Floating turbidity curtain (6048000000-E)SY735$0.01$35.34$128.42$40.00$66.95$68.00
0146Special stilling basins (6070000000-N)EACH36$9.35$14.80$1,573.81$1,063.00$937.50$300.00
0147Flocculant (6071002000-E)LB400$1.00$1.23$1.15$1.00$5.15$5.25
0148Wattle (6071010000-E)LF560$8.00$8.60$9.20$7.00$9.27$9.50
0149Wattle barrier (6071013000-E)LF800$8.00$8.60$9.20$7.00$12.36$12.50
0150Coir fiber baffle (6071030000-E)LF390$10.00$8.60$11.50$7.00$8.24$8.50
0151**" skimmer - (2") (6071050000-E)EACH1$1,575.85$1,905.19$1,596.51$2,993.50$1,339.00$1,000.00
0152**" skimmer - (2-1/2") (6071050000-E)EACH1$1,815.00$2,152.51$1,781.08$3,350.00$1,596.50$1,200.00
0153Seeding and mulching (6084000000-E)ACRE5.40$2,700.00$3,072.84$3,105.00$2,500.00$2,884.00$2,900.00
0154Mowing (6087000000-E)ACRE2.70$100.00$122.92$115.00$100.00$257.50$260.00
0155Seed for repair seeding (6090000000-E)LB100$5.00$3.07$5.75$2.50$4.64$4.75
0156Fertilizer for repair seeding (6093000000-E)TON0.25$1,000.00$1,229.09$1,150.00$1,000.00$1,442.00$1,450.00
0157Seed for supplemental seeding (6096000000-E)LB150$4.00$3.69$4.60$3.00$4.64$4.75
0158Fertilizer topdressing (6108000000-E)TON4$500.00$2,212.44$575.00$1,800.00$978.50$1,000.00
0159Impervious dike (6111000000-E)LF300$1.05$160.08$48.73$127.00$80.98$100.00
0160Specialized hand mowing (6114500000-N)MHR10$200.00$61.46$230.00$50.00$180.25$185.00
0161Manual litter removal (6114800000-N)MHR2$316.00$149.89$247.01$102.52$180.25$185.00
0162Litter disposal (6114900000-E)TON1$502.00$3,597.46$2,182.82$2,167.00$206.00$200.00
0163Response for erosion control (6117000000-N)EACH75$1.00$1.23$1.15$1.00$180.25$185.00
0164Concrete washout structure (6117500000-N)EACH2$1,000.00$987.69$3,332.93$5,175.50$1,696.48$773.21
0165Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N)EACH81$56.00$157.49$187.12$134.00$257.50$199.59
0166Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N)EACH27$267.00$456.14$310.17$571.50$257.50$201.63
0167Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH9$650.00$2,222.25$310.17$5,074.50$515.00$444.26
0168CM&R temp access *********** - (32+28.00 -L-) (8017000000-N)LS1$529,000$534,720$1,248,000$858,071$968,731$1,000,000
0169Remv exist STR ****** BRG (402) - (32+28.00 -L-) (8035000000-N)LS1$1,066,501$1,500,000$1,151,000$515,886$1,050,808$1,000,000
0170Asbestos assessment (8065000000-N)LS1$1,586.01$1,438.99$1,380.00$1,200.00$4,302.08$7,000.00
0171**'-**" dia drilld piers - (5'-0") (8108000000-E)LF728.05$1,715.01$1,569.31$1,807.32$1,613.00$1,892.07$2,600.00
0172Perm STL casing for ** pier - (5'-0") (8111000000-E)LF70.89$576.81$931.66$697.67$680.00$800.30$1,000.00
0173Sid inspections (8113000000-N)EACH18$1.00$1,814.92$1,162.79$1,000.00$5,239.52$500.00
0174CSL testing (8115000000-N)EACH18$1.00$1,678.82$4,069.77$9,999.50$6,278.87$7,500.00
0175Uncl STR excav sta ***** - (32+28.00 -L-) (8121000000-N)LS1$32,100$52,036$51,578$58,500$54,650$50,000
0176Reinforced concrete deck slab (8147000000-E)SF41,660$41.63$39.17$40.60$54.00$62.05$53.00
0177Grooving bridge floors (8161000000-E)SF38,620$1.91$0.39$0.58$0.35$2.20$0.60
0178Class A concrete (bridge) (8182000000-E)CY727.70$963.55$1,334.40$1,599.98$1,576.00$2,145.40$1,500.00
0179BRG appr slab *********** - (32+28.00 -L-) (8210000000-N)LS1$90,000$92,084$96,540$90,803$165,091$90,000
0180Reinforcing steel (bridge) (8217000000-E)LB161,923$1.67$1.36$1.34$1.73$1.71$2.00
0181Spiral column reinforcing steel (bridge) (8238000000-E)LB41,934$3.65$2.05$2.00$2.55$2.62$2.00
0182Fib **" prestr conc girdr - (63") (8278000000-E)LF4,851$502.17$444.57$469.57$579.00$577.25$500.00
0183Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E)EACH22$882.64$1,073.08$467.37$753.00$3,912.21$800.00
0184HP 12 X 53 steel piles (8364000000-E)LF825$49.32$76.00$84.78$154.00$41.50$55.00
0185Concrete barrier rail (8503000000-E)LF1,665.78$130.82$150.78$141.30$141.00$145.43$130.00
0186Rip rap class II (2'-0" thick) (8608000000-E)TON465$84.55$0.01$70.92$111.00$66.70$0.01
0187Geotextile for drainage (8622000000-E)SY515$5.08$8.82$3.48$15.50$4.93$5.00
0188Elastomeric bearings (8657000000-N)LS1$23,125$74,797$116,453$128,000$272,631$25,000
0189Expansion joint seals (8706000000-N)LS1$156,600$140,921$163,657$206,944$211,636$140,000
NCDOT contract C205044: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of November 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy