Crowder Construction Company: NCDOT bid record
Crowder Construction Company submitted 83 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 20 OCT 2026, and was the low bidder on 6 of them (7%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $125,743,821
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 18 | 1 | 6% |
| 2014 | 7 | 0 | 0% |
| 2015 | 4 | 0 | 0% |
| 2016 | 3 | 0 | 0% |
| 2017 | 3 | 0 | 0% |
| 2018 | 7 | 3 | 43% |
| 2019 | 4 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 4 | 0 | 0% |
| 2022 | 4 | 1 | 25% |
| 2023 | 7 | 0 | 0% |
| 2024 | 6 | 0 | 0% |
| 2025 | 8 | 0 | 0% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 9 | 2 | 22% |
| Mecklenburg | 7 | 2 | 29% |
| Haywood | 5 | 0 | 0% |
| Henderson | 4 | 1 | 25% |
| Buncombe | 3 | 0 | 0% |
| Cabarrus | 3 | 0 | 0% |
| Davidson | 3 | 0 | 0% |
| Yancey | 2 | 0 | 0% |
| Stokes | 2 | 0 | 0% |
| Stanly | 2 | 0 | 0% |
| Columbus | 2 | 0 | 0% |
| Guilford | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Remove existing guardrail | 3360000000-E | LF | 36 | 24 (67%) | $1.00 | $1.00 |
| Additional guardrail posts | 3150000000-N | EACH | 47 | 23 (49%) | $30.00 | $13.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 51 | 20 (39%) | $6.25 | $7.25 |
| Guardrail end units, type TL-3 | 3287000000-N | EACH | 28 | 20 (71%) | $3,253.50 | $3,250.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 39 | 19 (49%) | $0.30 | $0.27 |
| Steel beam guardrail | 3030000000-E | LF | 31 | 19 (61%) | $23.80 | $24.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 32 | 18 (56%) | $1.00 | $0.75 |
| Temporary silt fence | 6000000000-E | LF | 57 | 17 (30%) | $3.00 | $2.63 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 51 | 16 (31%) | $7.50 | $7.50 |
| Temporary slope drains | 6024000000-E | LF | 46 | 16 (35%) | $15.00 | $14.20 |
| Drums | 4430000000-N | EACH | 40 | 16 (40%) | $47.00 | $50.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 28 | 16 (57%) | $61.78 | $50.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 24 | 16 of 24 |
| Blythe Construction Inc | 19 | 6 of 19 |
| Smith-Rowe, LLC | 19 | 18 of 19 |
| Zachry Construction Corporation | 13 | 10 of 13 |
| Blythe Development Co. | 13 | 8 of 13 |
| S T Wooten Corporation | 12 | 7 of 12 |
| James R Vannoy & Sons Construction Company Inc | 12 | 10 of 12 |
| NHM Constructors, LLC | 11 | 8 of 11 |
| R.E. Burns & Sons Co., Inc. | 10 | 10 of 10 |
| Mountain Creek Contractors Inc | 9 | 6 of 9 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C204338 | Wake | WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53 | 7 of 8 | $51,014,755 | +27% |
| 15 SEP 2026 | C204947 | Caldwell | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND WALL. INTERSECTIONS ON US-321 WITH SR-1160 (MOUNT HERMAN RD | 3 of 3 | $38,179,903 | +49% |
| 21 JUL 2026 | C205201 | Pitt | GREENWAY AND MULTI-USE PATH CONSTRUCTION. (EXPRESS DB), MILL AND FILL. SR-1531 - 1ST ST TO BRG #730411, SR-1611 - N OF 1ST ST TO BRG #730470 | 2 of 4 | $2,994,803 | +2.0% |
| 19 MAY 2026 | C205106 | Hyde, Beaufort | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060066 OVER PUNGO RIVER ON US-264 | 5 of 5 | $20,257,695 | +56% |
| 19 MAY 2026 | C204773 | Gaston, Mecklenburg | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. INTERSECTIONS OF NC-7 AND SR-2083 AT US-74, B | 8 of 10 | $89,551,347 | +15% |
| 17 MAR 2026 | C205139 | Henderson | GREENWAY CONSTRUCTION & PEDESTRIAN BRIDGE REHAB. (DB). ECUSTA TRAIL FROM US-64 TO TRANSYLVANIA COUNTY LINE | 1 of 3 | $21,299,900 | Low, 29% under the second |
| 18 NOV 2025 | C205044 | Surry, Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | 5 of 6 | $21,817,897 | +30% |
| 21 OCT 2025 | C205124 | Mcdowell, Rutherford | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD)., ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). CULVERT #580382 ON SR-144 | 2 of 3 | $7,947,821 | +10% |
| 17 JUN 2025 | C205015 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | 7 of 8 | $22,114,856 | +22% |
| 18 MAR 2025 | C205065 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #990157 OVER ELK SHOAL CREEK ON SR-1388 AND BRIDGES #990233, #990192, AND #99 | 3 of 3 | $6,150,370 | +24% |
| 18 FEB 2025 | C205027 | Buncombe | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #100200 AND BRG #100175 BOTH ON NC-197, BRG #100147 ON SR-2173, AND BRG #100139 | 2 of 2 | $8,629,560 | +15% |
| 21 JAN 2025 | C205017 | Henderson | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALL. US-64 (CHIMNEY ROCK RD) FROM SR-1613 (SLICK ROCK RD, MM 22.79 | 4 of 4 | $44,158,916 | +34% |
| 21 JAN 2025 | C205056 | Henderson | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #440109 OVER CLEAR CREEK ON SR-1578 (TOWNSEND RD) AND BRIDGE #440198 OVER CLE | 2 of 2 | $5,813,926 | +17% |
| 21 JAN 2025 | C205022 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #990047 OVER MINE FORK CREEK ON SR-1416 AND BRG #990014 OVER BANKS CREEK ON SR-1 | 2 of 2 | $5,512,020 | +49% |
| 15 OCT 2024 | C204339 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW HOPE CHURCH ROAD GRADE SEPARATION OVER CSX RAIL LINE (CROSSING #630607N AT MILE POST | 7 of 7 | $28,747,191 | +21% |
| 20 AUG 2024 | C204925 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430095 OVER SOUTHERN RAILROAD ON US-74 | 5 of 7 | $20,851,162 | +18% |
| 16 JUL 2024 | C204884 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. I-40 FROM 0.348 MILES WEST OF SR-1550 (INCINERATOR RD) TO 0.345 MILES EAST OF SR-1550 (INCINERATO | 4 of 4 | $25,770,125 | +11% |
| 18 JUN 2024 | C204204 | Wake | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. GRADE SEPARATION OF SR-2006 (DURANT ROAD) OVER CSX S LINE RAILROAD IN RALEIGH | 6 of 8 | $22,822,026 | +21% |
| 28 MAY 2024 | C204796 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGES #248 AND #249 OVER SR-1613 (BEAVERDAM RD) ON I-40 | 4 of 5 | $38,799,638 | +18% |
| 16 APR 2024 | C204921 | Guilford | BRIDGE REHABILITATION AND BRIDGE PRESERVATION. I-40 EAST OF US-220 (FREEMAN MILL ROAD) TO EAST OF SR-3037/SR-4240 (EAST GATE CITY BOULEVARD) | 3 of 3 | $9,188,989 | +29% |
| 19 DEC 2023 | C204684 | Haywood | Grading, drainage, paving, and structure., grading, drainage, paving, and structures. BRIDGES #155 AND 158 OVER RICHLAND CREEK ON US-23/74 A | 3 of 4 | $49,122,666 | +15% |
| 15 AUG 2023 | C204462 | Wake, Durham | Bridge preservation. BRGS #306 OVER I-40 ON SR-1118, #39 OVER CRABTREE CRK ON SR-2517, AND #83 OVER US-1 & #84 OVER RICHLAND CRK ON NC-98. | 3 of 5 | $7,994,836 | +19% |
| 18 JUL 2023 | C204786 | Wake | Grading, drainage, paving, signals, and structures. US-401 AT SR-2044 (LIGON MILL RD)/SR-2224 (MITCHELL MILL RD) AND SR-2006 (PERRY CREEK RD | 4 of 4 | $59,549,594 | +31% |
| 18 JUL 2023 | C204176 | Mecklenburg | Grading, drainage, and culvert., grading, drainage, and paving. CHARLOTTE GATEWAY STATION - RAIL (STI); WYE CONNECTION TRACK AT CHARLOTTE JU | 2 of 2 | $12,963,787 | +59% |
| 16 MAY 2023 | C204237 | Mecklenburg | Bridge preservation., grading, drainage, paving, and bridge rehabilitation. I-277 FROM W OF I-77 TO E OF I-77 AND BRIDGE #345 ON NC-16 NB OV | 6 of 7 | $17,291,326 | +24% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.