GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060066 OVER PUNGO RIVER ON US-264. Let by North Carolina DOT on May 19, 2026, Hyde, Beaufort. 5 bids received; low bid $12,959,943 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 19 MAY 2026
- Pay items
- 147
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $12,959,943 | Low |
| 2 | Sanford Contractors Inc | $13,692,700 | +6.0% |
| 3 | McLean Contracting Co. | $18,680,000 | +44% |
| 4 | Mastec Civil, LLC | $20,094,122 | +55% |
| 5 | Crowder Construction Company | $20,257,695 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Sanford Contractors Inc | 3. McLean Contracting Co. | 4. Mastec Civil, LLC | 5. Crowder Construction Company |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $645,000 | $684,635 | $934,000 | $1,007,000 | $1,012,885 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $93,750 | $161,300 | $950,000 | $57,000 | $150,000 |
| 0003 | Sealing abandoned wells (0015000000-N) | EACH | 1 | $2,500.00 | $4,000.00 | $6,500.00 | $3,420.00 | $5,000.00 |
| 0004 | Grading (0043000000-N) | LS | 1 | $835,000 | $1,619,000 | $1,075,000 | $1,500,000 | $1,750,000 |
| 0005 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1,000.00 | $10,000 | $13,500 | $11,400 | $14,500 |
| 0006 | Undercut excavation (0057000000-E) | CY | 2,500 | $35.00 | $42.87 | $45.00 | $50.00 | $53.54 |
| 0007 | Embankment settlement gauges (0127000000-N) | EACH | 3 | $1,000.00 | $3,921.24 | $1,000.00 | $3,700.00 | $5,555.56 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 850 | $20.00 | $5.00 | $25.00 | $32.00 | $30.30 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 1,000 | $8.00 | $7.49 | $10.00 | $4.50 | $4.04 |
| 0010 | Temporary shoring (0199000000-E) | SF | 510 | $67.00 | $95.61 | $240.00 | $90.00 | $375.00 |
| 0011 | Rock plating (0223000000-E) | SY | 1,685 | $150.00 | $146.75 | $195.00 | $143.00 | $151.52 |
| 0012 | Generic grading item (CY) - select granular material, modified class III (0234000000-E) | CY | 3,550 | $45.00 | $25.41 | $59.00 | $0.01 | $35.35 |
| 0013 | Generic grading item (LS) - type 1 bridge approach fill, station 23+50.00 -L- (0248000000-N) | LS | 1 | $70,000 | $75,120 | $61,200 | $50,000 | $150,000 |
| 0014 | Foundation conditioning material, minor structures (0318000000-E) | TON | 110 | $100.00 | $56.00 | $131.00 | $100.00 | $60.61 |
| 0015 | FND condit geotextile (4A) (0321000000-E) | SY | 340 | $4.00 | $3.75 | $5.00 | $6.00 | $3.03 |
| 0016 | 15" drainage pipe (0335200000-E) | LF | 388 | $60.00 | $103.63 | $79.00 | $72.00 | $65.66 |
| 0017 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 636 | $105.00 | $109.50 | $137.00 | $86.00 | $92.93 |
| 0018 | Pipe removal (0995000000-E) | LF | 250 | $15.00 | $10.00 | $20.00 | $23.00 | $20.20 |
| 0019 | Shallow undercut (1099500000-E) | CY | 250 | $25.00 | $32.57 | $33.00 | $29.00 | $40.40 |
| 0020 | Class IV subgrade stabilization (1099700000-E) | TON | 500 | $50.00 | $67.37 | $65.00 | $84.00 | $55.56 |
| 0021 | Class IV aggregate stabilization (1111000000-E) | TON | 500 | $25.00 | $67.37 | $33.00 | $67.00 | $48.48 |
| 0022 | Geotextile for subgrade stabilization (1112000000-E) | SY | 750 | $7.00 | $7.49 | $9.00 | $4.50 | $2.02 |
| 0023 | Aggregate base course (1121000000-E) | TON | 240 | $50.00 | $68.27 | $65.00 | $79.00 | $151.52 |
| 0024 | Incidental milling (1330000000-E) | SY | 580 | $20.00 | $12.95 | $33.00 | $3.50 | $26.89 |
| 0025 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 2,580 | $115.00 | $115.00 | $161.00 | $128.00 | $101.01 |
| 0026 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 1,870 | $118.00 | $118.00 | $158.00 | $121.00 | $95.96 |
| 0027 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 50 | $250.00 | $250.00 | $158.00 | $335.00 | $95.96 |
| 0028 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 1,890 | $103.00 | $103.00 | $158.00 | $125.00 | $95.96 |
| 0029 | Asphalt binder for plant mix (1575000000-E) | TON | 325 | $600.00 | $600.00 | $1,000.00 | $900.00 | $707.07 |
| 0030 | Subdrain excavation (2022000000-E) | CY | 45 | $10.00 | $0.01 | $13.00 | $47.00 | $9.90 |
| 0031 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $2.50 | $0.01 | $3.30 | $2.00 | $4.04 |
| 0032 | Subdrain coarse aggregate (2036000000-E) | CY | 34 | $50.00 | $0.01 | $65.00 | $160.00 | $109.09 |
| 0033 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $10.00 | $0.01 | $13.00 | $25.00 | $20.20 |
| 0034 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $250.00 | $0.01 | $327.00 | $440.00 | $934.34 |
| 0035 | 6" outlet pipe (2077000000-E) | LF | 6 | $10.00 | $0.01 | $13.00 | $45.00 | $35.35 |
| 0036 | Pipe collars (2253000000-E) | CY | 0.40 | $15,000 | $1.00 | $1,280.00 | $3,270.00 | $493.66 |
| 0037 | Masonry drainage structures (2286000000-N) | EACH | 6 | $2,800.00 | $5,711.21 | $3,650.00 | $4,900.00 | $6,060.61 |
| 0038 | Masonry drainage structures (2308000000-E) | LF | 1 | $1,200.00 | $248.24 | $1,570.00 | $100.00 | $1,010.10 |
| 0039 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 6 | $870.00 | $1,623.91 | $1,140.00 | $730.00 | $1,313.13 |
| 0040 | Shoulder berm gutter (2556000000-E) | LF | 710 | $52.00 | $109.80 | $37.00 | $31.92 | $52.00 |
| 0041 | Steel beam guardrail (3030000000-E) | LF | 1,375 | $23.90 | $23.90 | $30.00 | $27.00 | $23.90 |
| 0042 | Steel beam guardrail, shop curved (3045000000-E) | LF | 50 | $25.00 | $25.00 | $32.00 | $28.00 | $25.00 |
| 0043 | EX length GR post ** STL - (8') (3145000000-E) | EACH | 170 | $30.00 | $30.00 | $39.00 | $33.00 | $30.00 |
| 0044 | Additional guardrail posts (3150000000-N) | EACH | 10 | $11.00 | $11.00 | $14.00 | $11.00 | $11.00 |
| 0045 | Guardrail end units, type at-1 (3195000000-N) | EACH | 1 | $950.00 | $950.00 | $1,240.00 | $1,050.00 | $950.00 |
| 0046 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,400.00 | $2,400.00 | $3,000.00 | $2,725.00 | $2,400.00 |
| 0047 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $3,200.00 | $3,200.00 | $4,100.00 | $3,650.00 | $3,200.00 |
| 0048 | Temporary steel beam guardrail (3380000000-E) | LF | 425 | $8.25 | $8.25 | $11.00 | $9.00 | $8.25 |
| 0049 | Temp GDRL anch units ****** - (III, modified) (3387000000-N) | EACH | 2 | $1,500.00 | $1,500.00 | $2,000.00 | $1,710.00 | $1,500.00 |
| 0050 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 3 | $2,100.00 | $2,100.00 | $2,750.00 | $2,380.00 | $2,100.00 |
| 0051 | Temporary additional guardrail posts (3389160000-N) | EACH | 5 | $1.00 | $1.00 | $1.50 | $1.10 | $1.00 |
| 0052 | Rip rap, class I (3628000000-E) | TON | 4 | $100.00 | $357.50 | $130.00 | $302.00 | $232.32 |
| 0053 | Rip rap, class B (3649000000-E) | TON | 2 | $150.00 | $630.00 | $195.00 | $190.00 | $232.33 |
| 0054 | Geotextile for drainage (3656000000-E) | SY | 475 | $6.00 | $3.75 | $8.00 | $2.40 | $3.03 |
| 0055 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 233 | $15.00 | $25.00 | $10.00 | $17.00 | $8.00 |
| 0056 | Supports, wood (4082000000-E) | LF | 88 | $25.00 | $45.00 | $65.00 | $28.50 | $16.00 |
| 0057 | Sign erection, type D (4096000000-N) | EACH | 4 | $175.00 | $400.00 | $457.00 | $200.00 | $220.00 |
| 0058 | Sign erection, type E (4102000000-N) | EACH | 6 | $125.00 | $400.00 | $425.00 | $142.00 | $125.00 |
| 0059 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 4 | $1,200.00 | $3,000.00 | $720.00 | $1,368.00 | $550.00 |
| 0060 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $250.00 | $1,000.00 | $200.00 | $285.00 | $400.00 |
| 0061 | Disposal of sign system, wood (4158000000-N) | EACH | 14 | $20.00 | $50.00 | $20.00 | $23.00 | $24.00 |
| 0062 | Work zone signs (stationary) (4400000000-E) | SF | 120 | $10.70 | $10.00 | $13.00 | $25.00 | $9.00 |
| 0063 | Work zone signs (portable) (4405000000-E) | SF | 96 | $70.00 | $8.25 | $11.00 | $11.00 | $16.00 |
| 0064 | Work zone signs (barricade mounted) (4410000000-E) | SF | 82 | $6.69 | $6.25 | $10.00 | $10.00 | $9.00 |
| 0065 | Drums (4430000000-N) | EACH | 107 | $125.00 | $53.50 | $70.00 | $56.00 | $49.00 |
| 0066 | Cones (4435000000-N) | EACH | 43 | $56.00 | $22.00 | $30.00 | $28.00 | $26.00 |
| 0067 | Barricades (type III) (4445000000-E) | LF | 168 | $19.26 | $18.00 | $24.00 | $31.00 | $37.00 |
| 0068 | Flagger (4455000000-N) | DAY | 58 | $480.00 | $1,325.00 | $1,730.00 | $445.00 | $2,050.00 |
| 0069 | Temporary crash cushions (4465000000-N) | EACH | 2 | $14,950 | $14,950 | $7,050.00 | $11,400 | $12,500 |
| 0070 | TMA (4480000000-N) | EACH | 2 | $38,000 | $26,000 | $34,000 | $5,600.00 | $86,400 |
| 0071 | Portable concrete barrier (4485000000-E) | LF | 2,020 | $74.00 | $73.98 | $155.00 | $45.00 | $48.00 |
| 0072 | Law enforcement (4510000000-N) | HR | 32 | $127.00 | $150.00 | $1,000.00 | $68.00 | $70.00 |
| 0073 | Temporary raised pavement markers (4650000000-N) | EACH | 61 | $10.00 | $10.00 | $9.00 | $11.00 | $10.00 |
| 0074 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 9,706 | $1.90 | $1.90 | $1.50 | $2.15 | $1.90 |
| 0075 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 53 | $17.00 | $17.00 | $12.00 | $19.30 | $17.00 |
| 0076 | 4" cold appl plstic lines type ** - (IV) (4770000000-E) | LF | 2,564 | $3.00 | $3.00 | $4.00 | $3.40 | $3.00 |
| 0077 | Paint pavement marking lines (4") (4810000000-E) | LF | 13,859 | $1.10 | $1.10 | $1.50 | $1.25 | $1.10 |
| 0078 | Paint pavement marking lines (24") (4835000000-E) | LF | 93 | $8.00 | $8.00 | $9.50 | $9.12 | $8.00 |
| 0079 | Polyurea lines (**", *** mils) - (4", 20 mils) (4846000000-E) | LF | 2,564 | $2.25 | $2.25 | $3.00 | $2.57 | $2.25 |
| 0080 | Removal of pavement marking lines (4") (4850000000-E) | LF | 5,964 | $1.00 | $1.00 | $1.50 | $1.14 | $1.00 |
| 0081 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 26 | $350.00 | $350.00 | $135.00 | $399.00 | $350.00 |
| 0082 | Permanent raised pavement markers (4900000000-N) | EACH | 8 | $35.00 | $35.00 | $20.00 | $39.90 | $35.00 |
| 0083 | 6" water line (5325600000-E) | LF | 155 | $200.00 | $170.00 | $222.00 | $84.00 | $420.00 |
| 0084 | DI H2O pipe fittings (5329000000-E) | LB | 350 | $32.50 | $19.00 | $25.00 | $22.00 | $10.00 |
| 0085 | 6" valve (5540000000-E) | EACH | 2 | $4,400.00 | $3,950.00 | $5,200.00 | $5,700.00 | $6,150.00 |
| 0086 | 2" blow off (5606000000-E) | EACH | 1 | $5,750.00 | $5,170.00 | $6,750.00 | $4,775.00 | $3,400.00 |
| 0087 | Fire hydrant (5666000000-N) | EACH | 1 | $8,140.00 | $9,860.00 | $12,500 | $6,400.00 | $7,400.00 |
| 0088 | Fire hydrant leg (5673000000-E) | LF | 8 | $265.00 | $225.00 | $250.00 | $240.00 | $60.00 |
| 0089 | Abandon 6" utility pipe (5800000000-E) | LF | 162 | $36.00 | $49.00 | $64.00 | $34.40 | $325.00 |
| 0090 | Remove fire hydrant (5815500000-N) | EACH | 1 | $1,800.00 | $2,600.00 | $3,400.00 | $1,800.00 | $4,990.00 |
| 0091 | Generic utility item (EA) - 1" sampling station (5882000000-N) | EACH | 1 | $6,320.00 | $7,200.00 | $9,400.00 | $4,600.00 | $11,390 |
| 0092 | Temporary silt fence (6000000000-E) | LF | 9,775 | $2.85 | $3.99 | $5.00 | $3.65 | $2.85 |
| 0093 | Stone for erosion control, class A (6006000000-E) | TON | 165 | $95.00 | $67.50 | $125.00 | $104.00 | $85.86 |
| 0094 | Stone for erosion control, class B (6009000000-E) | TON | 655 | $85.00 | $63.00 | $110.00 | $110.00 | $85.86 |
| 0095 | Sediment control stone (6012000000-E) | TON | 350 | $70.00 | $56.00 | $91.00 | $105.00 | $70.71 |
| 0096 | Temporary mulching (6015000000-E) | ACRE | 4 | $2,400.00 | $1,275.00 | $3,135.00 | $2,166.00 | $2,400.00 |
| 0097 | Seed for temporary seeding (6018000000-E) | LB | 300 | $2.00 | $7.95 | $3.00 | $2.28 | $2.00 |
| 0098 | Fertilizer for temporary seeding (6021000000-E) | TON | 1.50 | $400.00 | $1,800.00 | $520.00 | $1,254.00 | $400.00 |
| 0099 | Temporary slope drains (6024000000-E) | LF | 605 | $20.00 | $10.70 | $26.00 | $38.00 | $50.51 |
| 0100 | Safety fence (6029000000-E) | LF | 5,060 | $1.90 | $3.89 | $3.00 | $3.42 | $1.90 |
| 0101 | Silt excavation (6030000000-E) | CY | 920 | $8.00 | $1.00 | $10.00 | $25.00 | $10.10 |
| 0102 | Matting for erosion control (6036000000-E) | SY | 7,910 | $1.95 | $1.95 | $2.60 | $1.90 | $1.95 |
| 0103 | Coir fiber mat (6037000000-E) | SY | 100 | $7.00 | $6.75 | $10.00 | $7.00 | $7.00 |
| 0104 | 1/4" hardware cloth (6042000000-E) | LF | 810 | $6.00 | $7.50 | $8.00 | $5.00 | $6.00 |
| 0105 | Floating turbidity curtain (6048000000-E) | SY | 5,950 | $32.00 | $12.84 | $140.00 | $40.00 | $60.00 |
| 0106 | Flocculant (6071002000-E) | LB | 320 | $8.00 | $10.00 | $10.00 | $3.00 | $8.00 |
| 0107 | Coir fiber wattle (6071012000-E) | LF | 65 | $14.00 | $9.55 | $18.00 | $8.30 | $14.00 |
| 0108 | Coir fiber baffle (6071030000-E) | LF | 35 | $14.00 | $8.95 | $18.00 | $3.08 | $14.00 |
| 0109 | Seeding and mulching (6084000000-E) | ACRE | 6 | $3,500.00 | $2,600.00 | $4,500.00 | $3,534.00 | $3,500.00 |
| 0110 | Mowing (6087000000-E) | ACRE | 3 | $175.00 | $500.00 | $228.00 | $399.00 | $175.00 |
| 0111 | Seed for repair seeding (6090000000-E) | LB | 50 | $5.00 | $25.00 | $6.50 | $5.00 | $5.00 |
| 0112 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $600.00 | $2,500.00 | $785.00 | $1,140.00 | $600.00 |
| 0113 | Seed for supplemental seeding (6096000000-E) | LB | 100 | $5.00 | $7.00 | $7.00 | $5.00 | $5.00 |
| 0114 | Fertilizer topdressing (6108000000-E) | TON | 3 | $600.00 | $1,100.00 | $785.00 | $1,140.00 | $600.00 |
| 0115 | Specialized hand mowing (6114500000-N) | MHR | 10 | $55.00 | $95.00 | $72.00 | $199.50 | $55.00 |
| 0116 | Manual litter removal (6114800000-N) | MHR | 2 | $55.00 | $100.00 | $72.00 | $199.50 | $55.00 |
| 0117 | Litter disposal (6114900000-E) | TON | 1 | $300.00 | $400.00 | $400.00 | $570.00 | $300.00 |
| 0118 | Response for erosion control (6117000000-N) | EACH | 25 | $500.00 | $1.00 | $650.00 | $570.00 | $500.00 |
| 0119 | Concrete washout structure (6117500000-N) | EACH | 4 | $1,500.00 | $535.00 | $25,000 | $500.00 | $2,000.00 |
| 0120 | Reforestation (6123000000-E) | ACRE | 0.10 | $8,700.00 | $10,000 | $11,000 | $28,500 | $8,700.00 |
| 0121 | Wetland reforestation (6129000000-E) | ACRE | 1 | $3,200.00 | $7,500.00 | $4,000.00 | $2,850.00 | $3,200.00 |
| 0122 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $1,500.00 | $802.50 | $1,300.00 | $342.00 | $3,471.41 |
| 0123 | Generic erosion control item (acr) - disking (6135000000-E) | ACRE | 1 | $1,600.00 | $1,500.00 | $2,100.00 | $2,280.00 | $1,600.00 |
| 0124 | Generic erosion control item (acr) - ripping (6135000000-E) | ACRE | 1 | $1,600.00 | $1,500.00 | $2,100.00 | $3,819.00 | $1,600.00 |
| 0125 | Generic erosion control item (acr) - wetland grass planting (6135000000-E) | ACRE | 1 | $3,750.00 | $18,000 | $4,900.00 | $8,550.00 | $3,750.00 |
| 0126 | CM&R temp access *********** - (23+50.00 -L-) (8017000000-N) | LS | 1 | $2,620,000 | $1,717,075 | $200,000 | $7,800,000 | $5,433,000 |
| 0127 | Remv exist STR ****** BRG (402) - (23+50.00 -L-) (8035000000-N) | LS | 1 | $1,010,000 | $935,000 | $1,280,000 | $970,000 | $1,200,000 |
| 0128 | Asbestos assessment (8065000000-N) | LS | 1 | $1,250.00 | $2,500.00 | $4,000.00 | $5,130.00 | $2,500.00 |
| 0129 | Uncl STR excav sta ***** - (23+50.00 -L-) (8121000000-N) | LS | 1 | $15,000 | $6,000.00 | $15,010 | $20,000 | $20,000 |
| 0130 | Reinforced concrete deck slab (8147000000-E) | SF | 25,992 | $62.20 | $64.25 | $127.00 | $75.00 | $100.00 |
| 0131 | Grooving bridge floors (8161000000-E) | SF | 23,612 | $0.46 | $1.05 | $0.50 | $0.75 | $2.00 |
| 0132 | Class AA concrete (bridge) (8175000000-E) | CY | 299.70 | $1,400.00 | $2,286.00 | $3,900.00 | $1,800.00 | $3,500.00 |
| 0133 | BRG appr slab *********** - (23+50.00 -L-) (8210000000-N) | LS | 1 | $70,000 | $99,000 | $120,000 | $92,000 | $110,000 |
| 0134 | Epoxy coated reinforcing steel (bridge) (8224000000-E) | LB | 38,119 | $2.00 | $1.29 | $3.35 | $1.89 | $2.50 |
| 0135 | 54" prestressed concrete girders (8265000000-E) | LF | 3,042.50 | $365.00 | $410.91 | $493.00 | $360.00 | $450.00 |
| 0136 | Pile DRV equip setup * prestr conc piles - (30") (8328000000-E) | EACH | 25 | $8,200.00 | $25,100 | $38,000 | $13,320 | $20,000 |
| 0137 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 22 | $1,350.00 | $2,200.00 | $13,000 | $3,000.00 | $3,000.00 |
| 0138 | 30" prestressed concrete piles (8353000000-E) | LF | 2,575 | $245.00 | $174.14 | $68.00 | $315.00 | $195.00 |
| 0139 | HP 12 X 53 steel piles (8364000000-E) | LF | 2,155 | $71.00 | $46.97 | $28.00 | $91.00 | $55.00 |
| 0140 | Pile redrives (8393000000-N) | EACH | 27 | $135.00 | $1.00 | $2,531.00 | $3,130.00 | $815.00 |
| 0141 | Dynamic pile testing (8394000000-N) | EACH | 4 | $5,000.00 | $3,000.00 | $56,000 | $7,000.00 | $3,890.00 |
| 0142 | Two bar metal rail (8475000000-E) | LF | 1,205.70 | $190.00 | $190.00 | $335.00 | $208.00 | $184.00 |
| 0143 | 1'-**"X*****"conc parapet - (1'-2" X 2'-6") (8517000000-E) | LF | 1,220.70 | $180.00 | $305.00 | $665.00 | $160.00 | $157.36 |
| 0144 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 160 | $170.00 | $103.95 | $145.00 | $123.00 | $150.00 |
| 0145 | Geotextile for drainage (8622000000-E) | SY | 180 | $6.00 | $3.75 | $7.00 | $9.00 | $3.03 |
| 0146 | Elastomeric bearings (8657000000-N) | LS | 1 | $20,000 | $24,245 | $150,000 | $24,000 | $200,000 |
| 0147 | Generic structure item (LS) - strip seal expansion joints (8860000000-N) | LS | 1 | $100,000 | $154,200 | $220,000 | $94,000 | $90,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of May 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.