NCDOT letting results, June 18, 2024

13 contracts let by North Carolina DOT on June 18, 2024, $109,870,687 in low bids, a median of 4 bidders per contract.

Owner
North Carolina DOT
Contracts
13
Low bids, total
$109,870,687
Data through
20 OCT 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
C204501GRADING, DRAINAGE, PAVING, AND STRUCTURES. SR-2316 (NORTHCROSS DR) FROM NORTH OF NC-73 (SAM FURR RD) TO SR-2147 (WESTMORELAND RD)Mecklenburg9Sealand Contractors Corp$20,860,000$21,034,293+1.0%NCDOT
C204935GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALLS. US-601 (STATE ST) FROM SR-1742 (SHARON DR) TO SR-1146 (LEE AVE)Yadkin2Blythe Construction Inc$19,820,039$21,958,585+11%NCDOT
C204204GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. GRADE SEPARATION OF SR-2006 (DURANT ROAD) OVER CSX S LINE RAILROAD IN RALEIGHWake8Blythe Construction Inc$18,881,899$20,658,500+9.0%NCDOT
C204951MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 6 NON-SYSTEM ROADSHoke, Cumberland3FSC II LLC DBA Fred Smith Company$11,961,001$12,403,158+4.0%NCDOT
C204455BRIDGE PRESERVATION. BRIDGES #180007, #180477, #620049, AND #620072 OVER THE DEEP RIVER ON US-1 SOUTH, SR-1621, AND NC-22Chatham, Moore6Freyssinet Inc$6,392,194$6,779,682+6.0%NCDOT
C204950GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030014 OVER S FORK JONES CREEK ON US-52Anson10Anson Contractors Inc$5,435,975$5,678,926+4.0%NCDOT
C204960MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 26 SECTIONS OF SECONDARY ROADSRutherford2Apac Atlantic Inc DBA Harrison Construction Company$5,031,065$5,262,062+5.0%NCDOT
C204929GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780035 OVER MAYO RIVER ON NC-770 AND SR- 1395 (JANET ROAD) FROM US-220 TO NC-770Rockingham4Smith-Rowe, LLC$4,901,614$5,470,029+12%NCDOT
C204732DRAINAGE AND PAVING., GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #270008 OVER THE SLASH CREEK ON NC-12 AND SR-1241(EAGLE PASS RD) FROM NC-12 TO NC-12Dare4Smith-Rowe, LLC$4,498,090$4,752,731+6.0%NCDOT
C204965MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-50 AND NC-55, AND 10 SECTIONS OF SECONDARY ROADSSampson5S T Wooten Corporation$4,102,079$4,361,845+6.0%NCDOT
C204964MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-87, AND 8 SECTIONS OF SECONDARY ROADSBrunswick4S T Wooten Corporation$4,018,566$4,304,920+7.0%NCDOT
C204962MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158, AND 6 SECTIONS OF SECONDARY ROADSPerson2Carolina Sunrock LLC$2,427,336$2,583,031+6.0%NCDOT
C204963FRANKLIN, WAKE. 42 SECTIONS OF SECONDARY ROADSFranklin, Wake3S T Wooten Corporation$1,540,830$1,698,282+10%NCDOT
NCDOT contracts let on June 18, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy