Carolina Sunrock LLC: NCDOT bid record
Carolina Sunrock LLC submitted 115 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 17 SEP 2024, and was the low bidder on 54 of them (47%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $205,057,550
- Latest bid
- 17 SEP 2024
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 11 | 5 | 45% |
| 2014 | 7 | 3 | 43% |
| 2015 | 5 | 2 | 40% |
| 2016 | 8 | 2 | 25% |
| 2017 | 3 | 2 | 67% |
| 2018 | 13 | 6 | 46% |
| 2019 | 5 | 3 | 60% |
| 2020 | 6 | 5 | 83% |
| 2021 | 22 | 9 | 41% |
| 2022 | 9 | 4 | 44% |
| 2023 | 12 | 7 | 58% |
| 2024 | 14 | 6 | 43% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Wake | 30 | 9 | 30% |
| Durham | 11 | 6 | 55% |
| Person | 10 | 7 | 70% |
| Granville | 9 | 8 | 89% |
| Franklin | 8 | 2 | 25% |
| Vance | 6 | 3 | 50% |
| Franklin, Wake | 5 | 1 | 20% |
| Orange | 4 | 4 | 100% |
| Chatham | 3 | 0 | 0% |
| Durham, Wake | 3 | 2 | 67% |
| Warren | 3 | 2 | 67% |
| Vance, Warren | 3 | 3 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 103 | 78 (76%) | $115.00 | $135.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 109 | 76 (70%) | $0.55 | $0.75 |
| Work zone advance/general warning signing | 4413000000-E | SF | 97 | 66 (68%) | $6.00 | $6.33 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 85 | 64 (75%) | $2.09 | $2.25 |
| Inductive loop sawcut | 7444000000-E | LF | 89 | 59 (66%) | $6.74 | $7.25 |
| Asphalt conc surface course, type S9.5B | 1519000000-E | TON | 100 | 57 (57%) | $41.92 | $63.50 |
| Removal of pavement marking lines (4") | 4850000000-E | LF | 60 | 55 (92%) | $1.00 | $1.00 |
| Aggregate shoulder borrow | 1260000000-E | TON | 63 | 52 (83%) | $18.50 | $28.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 70 | 51 (73%) | $0.15 | $0.27 |
| Thermoplastic pavement marking character (90 mils) | 4720000000-E | EACH | 54 | 48 (89%) | $100.00 | $116.50 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 61 | 46 (75%) | $3.00 | $3.05 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 57 | 44 (77%) | $3.00 | $3.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FSC II LLC DBA Fred Smith Company | 92 | 42 of 92 |
| S T Wooten Corporation | 73 | 27 of 73 |
| Blythe Construction Inc | 25 | 6 of 25 |
| Barnhill Contracting Company | 25 | 8 of 25 |
| The Lane Construction Corp | 23 | 7 of 23 |
| Adams Construction Company | 12 | 3 of 12 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 10 | 5 of 10 |
| Triangle Grading & Paving Inc | 5 | 2 of 5 |
| ST Wooten Corporation | 4 | 2 of 4 |
| Riley Paving Inc | 3 | 0 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2024 | C204982 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-54 AND 15 SECTIONS OF SECONDARY ROADS | 3 of 5 | $4,979,210 | +4.0% |
| 17 SEP 2024 | C204981 | Franklin, Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-561, AND 1 SECTION OF NC-50 | 3 of 3 | $2,928,305 | +4.0% |
| 20 AUG 2024 | C204973 | Orange | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-86, NC-751, NC-54/US 15-501 NORTH AND SOUTH, AND 2 SECTIONS OF SECON | 1 of 3 | $4,888,116 | Low, 1.0% under the second |
| 18 JUN 2024 | C204963 | Franklin, Wake | FRANKLIN, WAKE. 42 SECTIONS OF SECONDARY ROADS | 2 of 3 | $1,698,282 | +10% |
| 18 JUN 2024 | C204962 | Person | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-158, AND 6 SECTIONS OF SECONDARY ROADS | 1 of 2 | $2,427,336 | Low, 6.0% under the second |
| 28 MAY 2024 | C204957 | Granville, Vance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 5 SECTIONS OF SECONDARY ROADS | 2 of 2 | $1,406,712 | +3.0% |
| 28 MAY 2024 | C204958 | Warren | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. US-158 E FROM US-1 TO US-158 BUS AND 6 SECTIONS OF SECONDARY ROADS | 1 of 3 | $2,488,771 | Low, 0.0% under the second |
| 16 APR 2024 | C204945 | Granville | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF SECONDARY ROADS | 1 of 2 | $1,274,053 | Low, 7.0% under the second |
| 16 APR 2024 | C204954 | Durham | PAVEMENT REHABILITATION AND SIGNALS. I-85 FROM ORANGE COUNTY LINE TO US-15/US-501 | 2 of 2 | $13,614,275 | +17% |
| 19 MAR 2024 | C204926 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-231, AND 44 SECTIONS OF SECONDARY ROADS | 1 of 4 | $3,073,373 | Low, 5.0% under the second |
| 20 FEB 2024 | C204918 | Durham, Wake | MILLING AND RESURFACING. 3 SECTIONS OF NC-55 | 3 of 4 | $5,336,672 | +5.0% |
| 16 JAN 2024 | C204911 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF NC-98 EAST, AND 60 SECTIONS OF SECONDARY ROADS | 1 of 4 | $4,376,122 | Low, 1.0% under the second |
| 16 JAN 2024 | C204910 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 34 SECTIONS OF SECONDARY ROADS | 2 of 4 | $3,713,385 | +1.0% |
| 16 JAN 2024 | C204903 | Chatham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421 N AND S, 1 SECTION OF US-15, AND 16 SECTIONS OF SECONDARY ROADS | 4 of 4 | $6,493,248 | +24% |
| 19 DEC 2023 | C204909 | Wake | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-55, AND16 SECTIONS OF SECONDARY ROADS. | 3 of 5 | $2,974,372 | +11% |
| 21 NOV 2023 | C204896 | Wake | Milling and resurfacing. 4 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $3,318,226 | Low, 2.0% under the second |
| 21 NOV 2023 | C204907 | Durham, Person | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-54, 2 SECTIONS OF NC-98, AND 31 SECTIONS OF SECONDARY ROADS. | 1 of 2 | $4,642,321 | Low, 5.0% under the second |
| 21 NOV 2023 | C204905 | Alamance, Orange | Milling, resurfacing, and shoulder reconstruction. 10 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $3,783,925 | Low, 2.0% under the second |
| 17 OCT 2023 | C204900 | Franklin | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-96, 1 SECTION OF US-1 ALT, AND 5 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $3,357,603 | Low, 6.0% under the second |
| 17 OCT 2023 | C204899 | Person | Milling, resufacing and shoulder reconstruction. 5 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $1,259,479 | Low, 23% under the second |
| 19 SEP 2023 | C204894 | Franklin, Wake | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF NC-39 AND 6 SECTIONS OF SECONDARY ROADS. | 3 of 4 | $2,495,316 | +10% |
| 15 AUG 2023 | C204872 | Chatham | Grading, drainage, and paving. CHATHAM PARKWAY FROM NORTH OF US-64 TO NORTH OF PROPOSED GRANT DRIVE. | 8 of 8 | $20,407,660 | +50% |
| 16 MAY 2023 | C204874 | Vance | Milling, resurfacing, and shoulder reconstruction. 13 SECTIONS OF SECONDARY ROADS. | 1 of 2 | $2,711,776 | Low, 19% under the second |
| 18 APR 2023 | C204380 | Wake | Grading, drainage, paving, signals, and structure. SR-2000 (FALLS OF NEUSE RD) FROM I-540 TO SR-2006 (DURANT RD). | 2 of 2 | $20,768,246 | +7.0% |
| 21 MAR 2023 | C204868 | Wake | Milling and resurfacing. 1 SECTION OF NC-50 AND 3 SECTIONS OF SECONDARY ROADS. | 2 of 5 | $4,269,781 | +2.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.