NCDOT letting results, December 19, 2023
8 contracts let by North Carolina DOT on December 19, 2023, $201,345,971 in low bids, a median of 4.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $201,345,971
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204887 | Grading, drainage, paving, signals, culverts and walls. US-19/129 FROM GEORGIA STATE LINE TO US-64. | Cherokee | 2 | Wright Brothers Construction Company Inc | $67,160,519 | $83,252,802 | +24% | NCDOT |
| C204823 | Grading, drainage, paving, signals, and structure. US-276 (RUSS AVE) FROM US-23/74 TO US-23 BUS (MAIN ST) IN WAYNESVILLE. | Haywood | 4 | Buchanan and Sons Inc | $42,830,673 | $46,583,674 | +9.0% | NCDOT |
| C204684 | Grading, drainage, paving, and structure., grading, drainage, paving, and structures. BRIDGES #155 AND 158 OVER RICHLAND CREEK ON US-23/74 AND BRIDGE #168 OVER | Haywood | 4 | Zachry Construction Corporation | $42,584,675 | $42,664,812 | 0.0% | NCDOT |
| C204842 | Grading, drainage, paving, signals, and structure. SR-1362 (CHESTNUT LANE CONNECTOR) FROM SR-1367 (MATTHEWS INDIAN TRAIL ROAD) TO SR-1368 (GRIBBLE ROAD). | Union | 5 | K. West Group, LLC DBA | $18,059,606 | $18,678,408 | +3.0% | NCDOT |
| C204431 | Grading, drainage and paving., grading, drainage, paving, and wall. ROUNDABOUTS AT NC-115/DAVIDSON ST/POTTS ST AND AT SR-6038/GRIFFITH ST/BEATY ST AND NEW LOCAT | Mecklenburg | 2 | Caton Construction Group Inc | $15,497,602 | $15,857,771 | +2.0% | NCDOT |
| C204767 | Grading, drainage, paving, and structure. BRIDGE #16 AND #17 OVER CSX RAILROAD ON US-117. | Duplin | 5 | S T Wooten Corporation | $9,368,068 | $9,590,000 | +2.0% | NCDOT |
| C204831 | Grading, drainage, paving, and structure., grading, drainage, paving, and structures. BRIDGE #810022 OVER BILLS SWAMP ON US-701. | Sampson | 8 | Es Wagner Company LLC | $3,156,492 | $3,670,330 | +16% | NCDOT |
| C204909 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-55, AND16 SECTIONS OF SECONDARY ROADS. | Wake | 5 | FSC II LLC DBA Fred Smith Company | $2,688,338 | $2,957,990 | +10% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.