Wright Brothers Construction Company Inc: NCDOT bid record
Wright Brothers Construction Company Inc submitted 46 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 22 JAN 2026, and was the low bidder on 14 of them (30%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $454,137,241
- Latest bid
- 22 JAN 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 4 | 1 | 25% |
| 2014 | 7 | 1 | 14% |
| 2015 | 2 | 0 | 0% |
| 2016 | 2 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 4 | 2 | 50% |
| 2019 | 4 | 3 | 75% |
| 2020 | 1 | 0 | 0% |
| 2021 | 3 | 2 | 67% |
| 2022 | 3 | 0 | 0% |
| 2023 | 5 | 1 | 20% |
| 2024 | 4 | 2 | 50% |
| 2025 | 4 | 1 | 25% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Haywood | 8 | 2 | 25% |
| Jackson | 5 | 1 | 20% |
| Cherokee | 5 | 2 | 40% |
| Henderson | 3 | 1 | 33% |
| Buncombe | 3 | 0 | 0% |
| Madison | 2 | 0 | 0% |
| Forsyth | 2 | 1 | 50% |
| Yancey | 2 | 1 | 50% |
| Clay | 2 | 1 | 50% |
| Graham | 2 | 0 | 0% |
| Rutherford | 2 | 1 | 50% |
| Henderson, Rutherford | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| 6" perforated subdrain pipe | 2044000000-E | LF | 33 | 12 (36%) | $13.14 | $12.00 |
| Subdrain excavation | 2022000000-E | CY | 33 | 11 (33%) | $24.90 | $25.00 |
| Safety fence | 6029000000-E | LF | 34 | 10 (29%) | $2.40 | $2.20 |
| Mowing | 6087000000-E | ACRE | 34 | 10 (29%) | $116.50 | $150.00 |
| Class IV subgrade stabilization | 1099700000-E | TON | 33 | 10 (30%) | $41.00 | $33.27 |
| Temporary shoring | 0199000000-E | SF | 24 | 10 (42%) | $59.38 | $61.28 |
| 4" concrete paved ditch | 2619000000-E | SY | 16 | 10 (63%) | $106.00 | $101.00 |
| Matting for erosion control | 6036000000-E | SY | 36 | 9 (25%) | $1.83 | $1.75 |
| Rip rap, class B | 3649000000-E | TON | 33 | 9 (27%) | $68.00 | $64.00 |
| Remove existing guardrail | 3360000000-E | LF | 29 | 9 (31%) | $1.10 | $1.00 |
| Coir fiber wattle | 6071012000-E | LF | 21 | 9 (43%) | $10.60 | $9.90 |
| Temporary mulching | 6015000000-E | ACRE | 36 | 8 (22%) | $1,450.00 | $1,100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| NHM Constructors, LLC | 18 | 10 of 18 |
| Dane Construction, Inc. | 13 | 5 of 13 |
| Crowder Construction Company | 9 | 5 of 9 |
| Zachry Construction Corporation | 7 | 5 of 7 |
| Watson Contracting Inc | 7 | 2 of 7 |
| Young & McQueen Grading Co Inc | 7 | 1 of 7 |
| Blythe Development Co. | 6 | 3 of 6 |
| Ipc Paving LLC DBA Ipc Structures LLC | 5 | 4 of 5 |
| Buchanan and Sons Inc | 5 | 2 of 5 |
| Carolina Bridge Co., Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JAN 2026 | C205068 | Henderson, Rutherford | PROGRESSIVE DESIGN BUILD. US-74A/NC-9/US-64 IN CHIMNEY ROCK TO WEST OF US-64 (CHIMNEY ROCK RD)/US-74A/NC-9 (GERTON HIGHWAY) INTERSECTION | 1 of 1 | $24,880,869 | Low |
| 18 NOV 2025 | C205086 | Jackson | GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNING, SIGNALS, & STRUCTURES. US-23 BUSINESS AT MILL ST, TO | 3 of 4 | $121,929,434 | +18% |
| 19 AUG 2025 | C205121 | Henderson | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS., GRADING, DRAINAGE, PAVING. NC-9 FROM 2700' NORTH OF THE US | 4 of 5 | $14,116,127 | +20% |
| 25 JUN 2025 | C205078 | Henderson | GRADING, DRAINAGE, PAVING, AND WALLS. (CMGC). US-74A FROM BEARWALLOW MOUNTAIN RD TO US-64/US-47A/NC-9. (CMGC - GERTON) | 1 of 1 | $19,136,216 | Low |
| 18 FEB 2025 | C205029 | Madison | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #560042 OVER IVY CREEK ON SR-1576 (BEND OF IVY RD) AND BRIDGE #560304 OVER SR | 2 of 2 | $6,920,000 | +17% |
| 20 AUG 2024 | C204925 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430095 OVER SOUTHERN RAILROAD ON US-74 | 7 of 7 | $22,999,311 | +30% |
| 16 JUL 2024 | C204884 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. I-40 FROM 0.348 MILES WEST OF SR-1550 (INCINERATOR RD) TO 0.345 MILES EAST OF SR-1550 (INCINERATO | 1 of 4 | $23,232,933 | Low, 4.0% under the second |
| 16 JUL 2024 | C204865 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #430243 OVER NC-215 (CHAMPION DRIVE) ON I-40 | 1 of 3 | $28,324,561 | Low, 2.0% under the second |
| 28 MAY 2024 | C204796 | Haywood | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGES #248 AND #249 OVER SR-1613 (BEAVERDAM RD) ON I-40 | 2 of 5 | $35,392,306 | +7.0% |
| 19 DEC 2023 | C204684 | Haywood | Grading, drainage, paving, and structure., grading, drainage, paving, and structures. BRIDGES #155 AND 158 OVER RICHLAND CREEK ON US-23/74 A | 2 of 4 | $42,664,812 | 0.0% |
| 19 DEC 2023 | C204887 | Cherokee | Grading, drainage, paving, signals, culverts and walls. US-19/129 FROM GEORGIA STATE LINE TO US-64. | 1 of 2 | $67,160,519 | Low, 24% under the second |
| 18 JUL 2023 | C204715 | Jackson | Grading, drainage, paving, and structure., grading, drainage, paving, bike lanes, and sidewalk. SR-1336 FROM N OF SR-1002 TO N OF SR-1337 AN | 4 of 6 | $6,820,821 | +9.0% |
| 20 JUN 2023 | C204491 | Mitchell | Grading, drainage, paving, and structures. BRIDGE #19 OVER CUB CREEK ON NC-226. | 5 of 5 | $6,164,261 | +107% |
| 17 JAN 2023 | C204768 | Madison | Grading, drainage, paving, and structure. BRIDGE #71 OVER BIG LAUREL CREEK ON SR-1395 | 3 of 5 | $5,788,199 | +6.0% |
| 20 SEP 2022 | C204740 | Buncombe | Grading, drainage, paving, and structure. BRIDGES #370 AND #373 OVER REEMS CREEK ON US-19/23, US-25, AND US-70. | 4 of 5 | $27,763,967 | +6.0% |
| 20 SEP 2022 | C204739 | Graham | Grading, drainage, and paving., grading, drainage, paving and structures. NC-143 FROM SR-1223 (BEECH CREEK RD) TO 0.5 MILES NORTH OF APPALAC | 2 of 2 | $130,012,833 | +12% |
| 16 AUG 2022 | C204731 | Graham | Grading, drainage, and paving. US-129 FROM SOUTH OF SR-1275 (FIVE POINTS RD) TO NC-143 AND NC-143 FROM US-129 TO SR-1223 (BEECH CREEK RD). | 5 of 6 | $58,248,622 | +23% |
| 21 DEC 2021 | C204397 | Rutherford | Grading, drainage, paving, signals, and structures. US-221 SOUTH OF US-74 BUS (CHARLOTTE RD) TO NORTH OF SR-1366 (ROPER LOOP RD). | 1 of 2 | $109,237,300 | Low, 7.0% under the second |
| 16 NOV 2021 | C204355 | Watauga | Grading, drainage, paving, signals, and structure. BRIDGE OVER WATAUGA RIVER AND LEFT TURN LANE AT SR-1112 (BROADSTONE RD) ON NC-105 WITHIN | 1 of 3 | $20,238,196 | Low, 12% under the second |
| 20 APR 2021 | C204387 | Cherokee | Grading, drainage, paving, and structure. BRIDGE #2 OVER SLOW CREEK ON NC-141. | 2 of 6 | $1,968,244 | +7.0% |
| 21 APR 2020 | C204547 | Jackson | Grading, drainage, and paving. US-441 BETWEEN SR-1300 AND SR-1305. | 3 of 8 | $6,599,980 | +9.0% |
| 19 NOV 2019 | C204360 | Clay | Grading, drainage, paving, signals, and culverts. NC-69 FROM THE GEORGIA STATE LINE TO US-64 (HAYESVILLE BYPASS). | 1 of 3 | $46,327,229 | Low, 11% under the second |
| 18 JUN 2019 | C204330 | Jackson | Grading, drainage, paving, signals, and structure. BRIDGE #27 OVER SCOTT CREEK AND SOUTHERN RAILROAD ON US-23 BUS. | 1 of 5 | $14,097,805 | Low, 13% under the second |
| 18 JUN 2019 | C204248 | Cherokee | Grading, drainage, paving, and signals. US-19/74/64/129 FROM END OF 4 LANE DIVIDED SECTION TO US-19 BUSINESS (HIWASSEE ST). | 1 of 2 | $22,692,802 | Low, 5.0% under the second |
| 19 FEB 2019 | C204291 | Clay | Widening, drainage, paving, and culvert. NC-175 FROM THE GEORGIA STATE LINE TO US-64. | 2 of 2 | $21,951,427 | +11% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.