NCDOT contract C205121 bid tabulation

GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS., GRADING, DRAINAGE, PAVING. NC-9 FROM 2700' NORTH OF THE US 74A / NC-9 INTERSECTION TO THE BUNCOMBE COUNTY LINE. Let by North Carolina DOT on August 19, 2025, Henderson. 5 bids received; low bid $11,755,058 by Ipc Paving LLC DBA Ipc Structures LLC.

Owner
North Carolina DOT
Letting
19 AUG 2025
Pay items
151
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ipc Paving LLC DBA Ipc Structures LLC$11,755,058Low
2Buchanan and Sons Inc$13,136,528+12%
3Site Development Corporation$13,478,683+15%
4Wright Brothers Construction Company Inc$14,116,127+20%
5Watson Contracting Inc$17,597,476+50%
NCDOT contract C205121: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ipc Paving LLC DBA Ipc Structures LLC2. Buchanan and Sons Inc3. Site Development Corporation4. Wright Brothers Construction Company Inc5. Watson Contracting Inc
0001Mobilization (0000100000-N)LS1$587,750$648,900$671,382$700,000$874,500
0002Construction surveying (0000400000-N)LS1$75,000$124,500$116,596$94,400$150,000
0003Grading (0043000000-N)LS1$968,000$2,149,200$3,523,501$3,222,000$4,750,000
0004Supplementary clearing & grubbing (0050000000-E)ACRE6$34,500$33,140$21,422$30,000$32,500
0005Undercut excavation (0057000000-E)CY2,550$35.00$35.85$86.22$44.50$50.00
0006Drainage ditch excavation (0134000000-E)CY920$72.00$23.30$90.50$44.00$40.00
0007Select granular material (0195000000-E)CY1,200$92.00$98.50$145.62$60.00$90.00
0008Geotextile for soil stabilization (0196000000-E)SY2,400$16.00$6.40$2.85$5.05$4.00
0009Rock embankments (0220000000-E)TON4,000$120.00$84.90$96.92$88.75$125.00
0010Geotextile for rock embankments (0222000000-E)SY900$12.50$5.60$2.41$4.45$7.00
0011Rock plating (0223000000-E)SY3,995$92.00$122.00$110.08$130.00$125.00
0012Generic grading item (CY) - grout for ditches (0234000000-E)CY350$569.00$965.30$455.45$1,000.00$500.00
0013Generic grading item (CY) - grout for rock fill (0234000000-E)CY450$665.00$965.30$453.21$955.00$650.00
0014Generic grading item (SY) - compost blanket for geocells (0241000000-E)SY6,595$45.00$20.10$8.43$19.85$50.00
0015Generic grading item (SY) - geocells (0241000000-E)SY6,595$70.00$62.75$39.36$58.00$65.00
0016Generic grading item (TON) - abc stone (0255000000-E)TON75$200.00$182.50$123.25$130.00$85.00
0017Foundation conditioning material, minor structures (0318000000-E)TON190$80.00$65.00$80.63$63.00$85.00
0018FND condit geotextile (4A) (0321000000-E)SY610$9.00$7.65$6.99$6.25$4.00
001915" drainage pipe (0335200000-E)LF236$180.00$130.10$125.82$132.00$160.00
002018" drainage pipe (0335300000-E)LF4$185.00$301.00$642.24$170.00$250.00
002124" drainage pipe (0335400000-E)LF32$225.00$178.50$162.35$174.00$250.00
002230" drainage pipe (0335500000-E)LF196$260.00$318.30$199.01$196.00$260.00
002336" drainage pipe (0335600000-E)LF92$370.00$384.50$277.93$223.00$275.00
0024**" drainage pipe elbow - (15") (0335850000-E)EACH2$1,115.00$1,768.00$1,333.49$1,175.00$1,200.00
0025**" drainage pipe elbow - (30") (0335850000-E)EACH2$2,300.00$2,300.00$2,792.51$1,600.00$2,800.00
002615" RC pipe culverts, class III (0366000000-E)LF68$162.00$144.90$160.51$130.00$215.00
002736" RC pipe culverts, class III (0390000000-E)LF76$314.00$249.20$348.64$236.00$500.00
0028**" CS pipe culv *****" - (36", 0.079") (0576000000-E)LF104$255.00$179.80$263.87$287.00$350.00
0029**" CS pipe culv *****" - (48", 0.109") (0576000000-E)LF96$345.00$324.80$261.24$376.00$650.00
003018" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E)LF304$140.00$169.70$273.44$213.00$275.00
003124" CS pipe culverts, 0.064" thick (0594000000-E)LF148$175.00$210.50$200.23$229.00$325.00
003230" CS pipe culverts, 0.079" thick (0600000000-E)LF252$184.00$268.30$216.50$245.00$330.00
0033**" CS elbow *****" thick - (18") (0636000000-E)EACH4$2,000.00$1,671.00$2,139.17$1,850.00$3,700.00
0034**" CS elbow *****" thick - (24") (0636000000-E)EACH2$2,300.00$1,875.00$2,306.60$1,700.00$3,900.00
0035**" CS elbow *****" thick - (30") (0636000000-E)EACH2$2,550.00$2,076.00$2,913.98$2,000.00$4,500.00
0036**" CS elbow *****" thick - (36") (0636000000-E)EACH2$2,850.00$2,859.00$3,329.30$2,250.00$4,800.00
0037**" CS elbow *****" thick - (48") (0636000000-E)EACH2$3,750.00$4,097.00$3,275.12$3,100.00$5,000.00
0038**"WLD STL pipe grad B in soil - (24", 0.500") (0973100000-E)LF46$945.00$1,078.00$825.00$800.00$2,500.00
0039**"WLD STL pipe grad B in soil - (36", 0.500") (0973100000-E)LF56$1,180.00$1,858.00$1,850.00$1,115.00$2,800.00
0040**"WLD STL pipe grad B in soil - (54", 0.750") (0973100000-E)LF52$2,200.00$3,164.00$1,250.00$2,255.00$4,000.00
0041**"WLD STL pipe grad B in soil - (60", 0.875") (0973100000-E)LF40$2,730.00$3,670.00$2,300.00$2,775.00$4,500.00
0042**"WLD STL pipe grad B not in soil - (24", 0.500") (0973300000-E)LF46$1,945.00$2,112.00$2,400.00$1,925.00$6,500.00
0043**"WLD STL pipe grad B not in soil - (36", 0.500") (0973300000-E)LF56$2,180.00$2,377.00$3,450.00$2,245.00$7,000.00
0044**"WLD STL pipe grad B not in soil - (54", 0.750") (0973300000-E)LF52$3,300.00$3,970.00$2,700.00$3,600.00$7,000.00
0045**"WLD STL pipe grad B not in soil - (60", 0.875") (0973300000-E)LF40$3,900.00$4,694.00$3,950.00$4,125.00$7,500.00
0046Pipe removal (0995000000-E)LF707$160.00$38.90$72.42$34.00$20.00
0047#57 stone (1077000000-E)TON85$88.00$67.15$125.57$64.00$85.00
0048Shallow undercut (1099500000-E)CY600$40.00$51.05$86.67$51.00$60.00
0049Class IV subgrade stabilization (1099700000-E)TON1,200$60.00$77.70$76.69$53.00$85.00
0050Geotextile for subgrade stabilization (1112000000-E)SY1,800$16.00$6.15$3.57$5.35$4.00
0051Aggregate base course (1121000000-E)TON4,700$60.00$79.30$80.99$64.00$85.00
0052Incidental stone base (1220000000-E)TON125$75.00$163.10$79.80$70.00$85.00
0053Incidental milling (1330000000-E)SY340$27.35$33.00$36.34$30.90$40.00
0054Asphalt conc base course, type B25.0C (1491000000-E)TON470$205.00$247.40$170.82$230.00$160.00
0055Asphalt conc intermediate course, type I19.0C (1503000000-E)TON2,690$121.00$146.00$148.40$136.00$150.00
0056Asphalt conc surface course, type S9.5B (1519000000-E)TON2,050$124.00$149.60$137.76$140.00$140.00
0057Asphalt binder for plant mix (1575000000-E)TON300$775.00$935.20$798.32$870.00$700.00
0058Asphalt plant mix, pavement repair (1693000000-E)TON425$437.80$347.50$195.89$330.00$325.00
0059Subdrain excavation (2022000000-E)CY268.80$10.00$30.20$41.71$32.60$50.00
0060Geotextile for subsurface drains (2026000000-E)SY1,200$7.00$4.65$2.50$5.65$6.00
0061Subdrain coarse aggregate (2036000000-E)CY201.60$130.00$146.50$124.73$115.00$150.00
00626" perforated subdrain pipe (2044000000-E)LF1,200$30.00$47.65$29.84$15.00$15.00
0063Subdrain pipe outlet (2070000000-N)EACH6$1,385.00$439.60$709.52$960.00$975.00
00646" outlet pipe (2077000000-E)LF36$160.00$118.30$56.24$108.00$25.00
0065Endwalls (2209000000-E)CY8.30$4,000.00$3,282.00$2,415.61$2,555.00$4,500.00
0066Reinforced endwalls (2220000000-E)CY11.50$4,300.00$3,950.00$2,547.10$2,950.00$5,000.00
0067Masonry drainage structures (2286000000-N)EACH11$5,600.00$7,673.00$4,204.67$4,850.00$8,500.00
0068Masonry drainage structures (2308000000-E)LF2.40$919.00$571.80$1,244.75$1,250.00$1,200.00
0069Frame with two grates, STD 840.24 (2366000000-N)EACH10$1,600.00$1,641.00$836.02$1,775.00$2,400.00
0070Frame with two grates, STD 840.29 (2367000000-N)EACH1$1,800.00$1,641.00$1,164.33$1,750.00$1,200.00
0071Shoulder berm gutter (2556000000-E)LF600$53.50$74.20$77.94$56.00$65.00
00724" concrete island cover (2627000000-E)SY852$125.00$136.90$108.00$69.00$140.00
0073Steel beam guardrail (3030000000-E)LF2,262.50$24.00$32.60$29.45$30.50$32.00
0074Steel beam guardrail, shop curved (3045000000-E)LF225$32.00$34.40$39.28$32.25$38.00
0075Additional guardrail posts (3150000000-N)EACH10$40.00$79.65$49.10$74.00$100.00
0076GR anchor type ********** - (B-77, shop curved) (3180000000-N)EACH3$2,850.00$3,137.00$3,497.89$2,950.00$3,500.00
0077Guardrail end units, type at-1 (3195000000-N)EACH6$995.00$905.00$1,221.19$850.00$1,200.00
0078Guardrail end units, type cat-1 (3210000000-N)EACH5$1,050.00$1,026.00$1,288.69$960.00$1,500.00
0079Guardrail end units, type TL-3 (3287000000-N)EACH5$3,450.00$3,922.00$4,234.28$3,700.00$4,200.00
0080Guardrail anchor units, type B-77 (3317000000-N)EACH11$2,700.00$2,896.00$3,313.79$2,700.00$3,500.00
0081Remove existing guardrail (3360000000-E)LF2,550$1.50$1.20$1.84$1.00$2.00
0082CL fen guardrail mounted - (60") (3527000000-E)LF120$35.00$42.25$42.95$39.70$50.00
0083CHN LK fence **" fabric - (60") (3533000000-E)LF886$35.00$42.25$42.95$39.70$50.00
0084Met line PST **" CL fen - (60") (3539000000-E)EACH85$200.00$241.30$245.46$225.00$240.00
0085Met term PST **" CL fen - (60") (3545000000-E)EACH18$250.00$301.70$306.84$280.00$300.00
0086Rip rap, class I (3628000000-E)TON615$185.00$95.30$102.37$88.75$100.00
0087Rip rap, class II (3635000000-E)TON255$217.00$94.00$100.73$88.75$100.00
0088Rip rap, class A (3642000000-E)TON730$190.00$90.75$101.61$85.00$85.00
0089Rip rap, class B (3649000000-E)TON1,313$120.00$90.75$87.15$85.00$100.00
0090Boulders (3651000000-E)TON65$370.00$279.20$272.14$215.00$350.00
0091Geotextile for drainage (3656000000-E)SY5,695$12.00$4.70$1.57$6.20$6.00
0092Contr furn, type ***sign - (E) (4025000000-E)SF525.25$14.25$21.70$20.85$15.70$30.00
0093Supports, 3-LB steel U-channel (4072000000-E)LF1,000$7.50$12.05$11.03$8.40$9.00
0094Sign erection, type E (4102000000-N)EACH126$85.00$102.60$85.90$95.00$100.00
0095Disposal of sign system, U-channel (4155000000-N)EACH17$20.00$24.15$36.81$22.00$25.00
0096Work zone signs (portable) (4405000000-E)SF1,224$54.00$19.55$23.93$27.00$20.00
0097Work zone signs (barricade mounted) (4410000000-E)SF25$7.25$8.15$9.76$8.60$9.00
0098Temporary portable traffic signal system (4424500000-N)EACH6$40,000$19,310$78,795$38,200$40,000
0099Drums (4430000000-N)EACH155$89.00$33.50$56.45$70.00$60.00
0100Cones (4435000000-N)EACH155$53.00$18.15$27.00$34.00$45.00
0101Barricades (type III) (4445000000-E)LF16$60.00$28.95$30.07$30.00$30.00
0102Flagger (4455000000-N)DAY600$530.00$644.20$582.43$1,000.00$600.00
0103Portable concrete barrier (anchored) (4490000000-E)LF1,250$85.00$80.35$128.86$130.00$125.00
0104Skinny drum (4516000000-N)EACH155$83.15$26.50$41.73$63.00$50.00
0105Temporary raised pavement markers (4650000000-N)EACH155$27.00$32.60$8.59$30.00$32.00
0106Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF28,325$0.52$0.65$1.05$0.60$0.75
0107Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E)LF15$35.00$42.25$12.27$39.00$50.00
0108Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E)LF560$8.50$10.25$14.73$9.50$10.00
0109Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF18$20.00$24.15$17.18$22.25$25.00
0110Paint pavement marking lines (4") (4810000000-E)LF61,416$0.15$0.20$0.24$0.15$0.50
0111Paint pavement marking lines (24") (4835000000-E)LF480$5.00$6.05$6.13$5.50$6.00
0112Generic pavement marking item (EA) - inlaid raised pavement markers (4895000000-N)EACH145$56.50$68.20$98.18$63.00$75.00
0113Temporary silt fence (6000000000-E)LF8,460$4.00$4.85$4.91$4.40$5.00
0114Stone for erosion control, class A (6006000000-E)TON375$88.30$84.25$90.46$78.00$85.00
0115Stone for erosion control, class B (6009000000-E)TON3,900$86.85$84.25$77.09$78.00$100.00
0116Sediment control stone (6012000000-E)TON1,215$90.00$79.35$78.99$75.00$85.00
0117Temporary mulching (6015000000-E)ACRE18$1,500.00$1,810.00$1,963.72$1,675.00$1,800.00
0118Seed for temporary seeding (6018000000-E)LB1,200$5.00$6.05$7.36$5.55$6.00
0119Fertilizer for temporary seeding (6021000000-E)TON6$1,800.00$2,172.00$2,331.93$2,000.00$2,100.00
0120Temporary slope drains (6024000000-E)LF490.02$30.00$16.00$31.19$30.00$25.00
0121Safety fence (6029000000-E)LF2,659.98$9.50$3.60$4.91$3.30$3.50
0122Silt excavation (6030000000-E)CY5,020.02$47.00$34.15$29.68$35.30$20.00
0123Matting for erosion control (6036000000-E)SY42,000$2.00$2.40$2.40$2.25$2.25
0124Coir fiber mat (6037000000-E)SY100.02$10.00$12.05$4.91$11.00$11.50
01251/4" hardware cloth (6042000000-E)LF625.02$25.00$7.25$7.36$10.00$7.00
0126Floating turbidity curtain (6048000000-E)SY480$140.00$33.50$55.23$41.00$140.00
0127Special stilling basins (6070000000-N)EACH6$900.00$1,282.00$1,073.91$1,500.00$2,200.00
0128Flocculant (6071002000-E)LB874.98$49.00$30.15$19.63$28.00$28.50
0129Coir fiber wattle (6071012000-E)LF270$28.00$14.50$22.09$13.40$14.00
0130Coir fiber wattle barrier (6071014000-E)LF1,300.02$30.00$14.50$22.09$13.40$14.00
0131Coir fiber baffle (6071030000-E)LF40.02$28.00$12.05$9.82$11.00$11.50
0132Seeding and mulching (6084000000-E)ACRE18$4,000.00$4,827.00$2,945.59$4,450.00$4,500.00
0133Mowing (6087000000-E)ACRE12$100.00$120.70$368.20$110.00$105.00
0134Seed for repair seeding (6090000000-E)LB199.98$10.00$12.05$9.82$11.00$11.00
0135Fertilizer for repair seeding (6093000000-E)TON0.40$1,500.00$1,810.00$2,945.59$1,675.00$1,600.00
0136Seed for supplemental seeding (6096000000-E)LB333.35$15.00$18.10$7.36$16.75$17.50
0137Fertilizer topdressing (6108000000-E)TON12$1,500.00$1,810.00$2,331.93$1,675.00$1,750.00
0138Impervious dike (6111000000-E)LF369$200.00$155.90$143.66$325.00$350.00
0139Specialized hand mowing (6114500000-N)MHR10.02$100.00$120.70$92.05$110.00$105.00
0140Manual litter removal (6114800000-N)MHR7.02$100.00$70.40$122.73$110.00$105.00
0141Litter disposal (6114900000-E)TON1.98$1,500.00$1,238.00$920.50$1,675.00$1,700.00
0142Response for erosion control (6117000000-N)EACH25$200.00$241.30$306.84$220.00$250.00
0143Concrete washout structure (6117500000-N)EACH1$1,000.00$1,548.00$3,068.32$3,400.00$1,000.00
0144Reforestation (6123000000-E)ACRE0.12$5,000.00$6,033.00$4,909.31$5,500.00$5,200.00
0145Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N)EACH24$540.00$437.70$306.84$165.00$200.00
0146Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N)EACH8$800.00$211.90$306.84$165.00$200.00
0147Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH6$700.00$1,415.00$1,534.17$1,470.00$4,000.00
0148Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E)SY100.02$15.00$6.05$6.13$5.60$6.00
0149Soil nail retaining walls (8802010000-E)SF7,717$163.00$181.30$116.60$192.00$200.00
0150Soil nail verification tests (8802015100-N)EACH7$1,000.00$3,017.00$3,068.32$2,950.00$4,000.00
0151Soil nail proof tests (8802015110-N)EACH20$1,000.00$784.30$797.76$770.00$2,000.00
NCDOT contract C205121: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of August 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy