NCDOT letting results, November 18, 2025
14 contracts let by North Carolina DOT on November 18, 2025, $255,322,985 in low bids, a median of 4.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 14
- Low bids, total
- $255,322,985
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C205086 | GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNING, SIGNALS, & STRUCTURES. US-23 BUSINESS AT MILL ST, TO NC-107, ALONG NC-107 | Jackson | 4 | Buchanan and Sons Inc | $103,347,871 | $104,361,751 | +1.0% | NCDOT |
| C205012 | GRADING, DRAINAGE, PAVING, SIGNALS AND STRUCTURES. BIG MILL FARM RD FROM S OF US-421 TO SR-2649, SR-2649 FROM BIG MILL FARM RD TO NC-66, & INT OF US-421 & BIG M | Forsyth | 5 | Apac Atlantic Inc Smith Rowe LLC JV | $59,776,710 | $60,626,324 | +1.0% | NCDOT |
| C204505 | GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALLS. SR-2195 (TORRENCE CHAPEL RD) AND SR-5544 (WEST CATAWBA AVE) IN CORNELIUS | Mecklenburg | 4 | K West Group LLC DBA Kwest Group LLC | $21,341,243 | $21,705,204 | +2.0% | NCDOT |
| C205044 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | Surry, Yadkin | 6 | Smith-Rowe, LLC | $16,781,818 | $17,043,768 | +2.0% | NCDOT |
| C205146 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-176, 2 SECTIONS OF US-25, 1 SECTION OF US-64, 1 SECTION OF NC-191 AND 13 SECTIONS OF SECONDAR | Henderson | 2 | Apac Atlantic Inc Asheville Division | $9,975,887 | $13,140,532 | +32% | NCDOT |
| C205118 | GRADING, DRAINAGE, AND PAVING. SR-2042 (OAKDALE RD), SR-2108 (SUNSET RD), SR-2025 (MIRANDA RD), AND SR-2040 (LAWING RD) | Mecklenburg | 5 of 6 | Truerock Construction LLC | $6,839,336 | $7,875,000 | +15% | NCDOT |
| C205069 | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #770175 OVER LUMBER RIVER ON SR-1600 (W 5TH ST) | Robeson | 6 | S & C Construction LLC | $6,542,887 | $6,826,205 | +4.0% | NCDOT |
| C205147 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-18, 1 SECTION OF NC-161, AND 8 SECTIONS OF SECONDARY ROADS | Cleveland | 3 | Asphalt Paving of Shelby Inc | $5,677,061 | $6,695,519 | +18% | NCDOT |
| C205126 | GRADING, DRAINAGE, AND PAVING. FUTURE CONNECTOR ROAD (EAST FREDERICK LAW OLMSTEAD WAY) FROM I-26 INTERCHANGE TO ROUNDABOUT | Buncombe | 8 | Branch Civil Inc | $5,648,500 | $5,658,644 | 0.0% | NCDOT |
| C205154 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-74, 1 SECTION OF NC-207, AND 9 SECTIONS OF SECONDARY ROADS | Union | 2 | Truerock Construction LLC | $5,048,584 | $5,454,310 | +8.0% | NCDOT |
| C204967 | BRIDGE PRESERVATION. BRIDGES #910001 AND #910538 OVER CRABTREE CREEK AND CLNA RAILROAD ON SR-2911 (NEW BERN AVE) | Wake | 2 | American Contracting & Services Inc | $4,206,384 | $4,996,086 | +19% | NCDOT |
| C205155 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-705, 1 SECTION OF NC-24W, AND 15 SECTIONS OF SECONDARY ROADS | Moore | 3 | FSC II LLC DBA Fred Smith Company | $4,070,491 | $4,106,127 | +1.0% | NCDOT |
| C205148 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-55 | Durham | 5 | Cardinal Civil Contracting LLC | $3,982,213 | $4,315,220 | +8.0% | NCDOT |
| C205094 | BRIDGE PRESERVATION. BRIDGE #250227 OVER SR-1007 (ALL AMERICAN FREEWAY) ON SR-1400 (CLIFFDALE RD) | Cumberland | 5 | American Civil Constructors West Coast LLC | $2,084,000 | $2,148,148 | +3.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.