NCDOT contract C205012 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS AND STRUCTURES. BIG MILL FARM RD FROM S OF US-421 TO SR-2649, SR-2649 FROM BIG MILL FARM RD TO NC-66, & INT OF US-421 & BIG MILL FARM RD. Let by North Carolina DOT on November 18, 2025, Forsyth. 5 bids received; low bid $59,776,710 by Apac Atlantic Inc Smith Rowe LLC JV.
- Owner
- North Carolina DOT
- Letting
- 18 NOV 2025
- Pay items
- 390
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Apac Atlantic Inc Smith Rowe LLC JV | $59,776,710 | Low |
| 2 | Flatiron Dragados Constructors Inc | $60,626,324 | +1.0% |
| 3 | Ames Construction Inc | $65,983,121 | +10% |
| 4 | Blythe Construction Inc | $67,668,843 | +13% |
| 5 | Webber LLC | $73,771,463 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Apac Atlantic Inc Smith Rowe LLC JV | 2. Flatiron Dragados Constructors Inc | 3. Ames Construction Inc | 4. Blythe Construction Inc | 5. Webber LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $2,980,000 | $3,031,000 | $3,290,000 | $3,350,000 | $3,622,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $1,000,000 | $750,000 | $800,000 | $1,000,000 | $2,000,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $5,000,000 | $8,373,000 | $2,970,000 | $3,500,000 | $16,840,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 3 | $1.00 | $15,000 | $14,500 | $5,000.00 | $15,000 |
| 0005 | Sealing abandoned wells (0015000000-N) | EACH | 1 | $4,281.38 | $4,400.00 | $5,000.00 | $12,500 | $3,500.00 |
| 0006 | Unclassified excavation (0022000000-E) | CY | 166,600 | $7.71 | $11.00 | $18.00 | $15.00 | $11.80 |
| 0007 | Undercut excavation (0036000000-E) | CY | 5,100 | $14.97 | $11.00 | $16.00 | $12.00 | $11.45 |
| 0008 | Borrow excavation (0106000000-E) | CY | 423,000 | $0.01 | $0.01 | $13.25 | $14.00 | $0.01 |
| 0009 | Drainage ditch excavation (0134000000-E) | CY | 820 | $19.57 | $12.00 | $9.00 | $15.00 | $16.43 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 30,750 | $9.99 | $8.00 | $20.00 | $18.00 | $9.50 |
| 0011 | Breaking of existing asphalt pavement (0177000000-E) | SY | 4,620 | $4.21 | $5.00 | $4.00 | $6.00 | $16.00 |
| 0012 | Select granular material (0195000000-E) | CY | 3,250 | $0.01 | $46.00 | $80.00 | $20.00 | $74.65 |
| 0013 | Geotextile for soil stabilization (0196000000-E) | SY | 5,450 | $3.56 | $3.75 | $4.00 | $5.00 | $3.13 |
| 0014 | Temporary shoring (0199000000-E) | SF | 2,400 | $90.00 | $35.00 | $105.50 | $100.00 | $126.35 |
| 0015 | Generic grading item (LS) - type 2 bridge approach fill, station 27+37.26 -L- (0248000000-N) | LS | 1 | $50,000 | $50,000 | $200,000 | $100,000 | $200,000 |
| 0016 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $86.47 | $150.00 | $83.00 | $120.00 | $250.00 |
| 0017 | Foundation conditioning material, minor structures (0318000000-E) | TON | 4,862 | $47.37 | $50.00 | $60.00 | $60.00 | $72.34 |
| 0018 | FND condit geotextile (4A) (0321000000-E) | SY | 14,414 | $2.50 | $2.50 | $4.00 | $5.00 | $4.14 |
| 0019 | 15" drainage pipe (0335200000-E) | LF | 104 | $120.32 | $175.00 | $80.00 | $80.00 | $87.00 |
| 0020 | 18" drainage pipe (0335300000-E) | LF | 358 | $139.71 | $145.00 | $100.00 | $85.00 | $100.00 |
| 0021 | 15" side drain pipe (0343000000-E) | LF | 420 | $105.78 | $115.00 | $90.00 | $80.00 | $98.00 |
| 0022 | 18" side drain pipe (0344000000-E) | LF | 36 | $120.18 | $150.00 | $100.00 | $105.00 | $118.00 |
| 0023 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 200 | $399.25 | $400.00 | $480.00 | $320.00 | $390.00 |
| 0024 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 108 | $706.15 | $700.00 | $935.00 | $460.00 | $505.00 |
| 0025 | ***" RCP culv class IV - (66") (0448000000-E) | LF | 92 | $951.96 | $1,100.00 | $920.00 | $1,000.00 | $770.00 |
| 0026 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 11,432 | $105.23 | $95.00 | $125.00 | $95.00 | $112.00 |
| 0027 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 6,492 | $128.33 | $120.00 | $140.00 | $105.00 | $125.00 |
| 0028 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 3,992 | $149.03 | $210.00 | $210.00 | $120.00 | $165.00 |
| 0029 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 1,492 | $214.98 | $300.00 | $235.00 | $175.00 | $200.00 |
| 0030 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 224 | $240.97 | $320.00 | $325.00 | $260.00 | $250.00 |
| 0031 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 740 | $350.44 | $365.00 | $460.00 | $280.00 | $315.00 |
| 0032 | 18" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E) | LF | 204 | $123.18 | $135.00 | $115.00 | $100.00 | $115.00 |
| 0033 | 24" CS pipe culverts, 0.064" thick (0594000000-E) | LF | 192 | $137.19 | $200.00 | $135.00 | $120.00 | $116.00 |
| 0034 | **" CS elbow *****" thick - (18", 0.064") (0636000000-E) | EACH | 6 | $1,309.42 | $530.00 | $1,500.00 | $500.00 | $860.00 |
| 0035 | **" CS elbow *****" thick - (24", 0.064") (0636000000-E) | EACH | 2 | $1,402.64 | $830.00 | $1,600.00 | $600.00 | $1,100.00 |
| 0036 | **"WLD STL pipe grad B in soil - (20", 0.250") (0973100000-E) | LF | 226 | $2,030.84 | $900.00 | $700.00 | $800.00 | $988.78 |
| 0037 | **"WLD STL pipe grad B in soil - (24", 0.250") (0973100000-E) | LF | 80 | $2,052.97 | $1,000.00 | $815.00 | $800.00 | $999.41 |
| 0038 | **"WLD STL pipe grad B not in soil - (20", 0.250") (0973300000-E) | LF | 226 | $1.00 | $0.01 | $1,350.00 | $1,700.00 | $1,754.29 |
| 0039 | **"WLD STL pipe grad B not in soil - (24", 0.250") (0973300000-E) | LF | 80 | $1.00 | $0.01 | $1,725.00 | $1,700.00 | $1,764.92 |
| 0040 | Pipe removal (0995000000-E) | LF | 2,451 | $49.92 | $35.00 | $45.00 | $40.00 | $22.00 |
| 0041 | Fine grading (1011000000-N) | LS | 1 | $6,488,026 | $950,000 | $2,500,000 | $2,750,000 | $1,000,000 |
| 0042 | #57 stone (1077000000-E) | TON | 20 | $95.00 | $150.00 | $85.00 | $60.00 | $200.00 |
| 0043 | Shallow undercut (1099500000-E) | CY | 750 | $16.54 | $35.00 | $40.00 | $22.00 | $12.00 |
| 0044 | Class IV subgrade stabilization (1099700000-E) | TON | 1,500 | $56.99 | $90.00 | $50.00 | $55.00 | $76.00 |
| 0045 | Geotextile for subgrade stabilization (1112000000-E) | SY | 2,250 | $5.43 | $6.00 | $4.00 | $5.00 | $3.04 |
| 0046 | Aggregate base course (1121000000-E) | TON | 1,475 | $53.06 | $75.00 | $60.00 | $75.00 | $56.00 |
| 0047 | Incidental stone base (1220000000-E) | TON | 530 | $91.53 | $140.00 | $60.00 | $150.00 | $100.00 |
| 0048 | Shoulder reconstruction (1245000000-E) | SMI | 1.15 | $8,400.00 | $9,800.00 | $11,000 | $11,000 | $11,000 |
| 0049 | Aggregate shoulder borrow (1260000000-E) | TON | 200 | $27.00 | $45.00 | $50.00 | $75.00 | $55.00 |
| 0050 | Prime coat (1275000000-E) | GAL | 810 | $6.00 | $7.31 | $7.00 | $5.00 | $6.00 |
| 0051 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 57,400 | $2.20 | $1.45 | $1.30 | $5.00 | $2.20 |
| 0052 | Mill asp PVMT *****" DTH - (4") (1297000000-E) | SY | 6,100 | $8.00 | $5.50 | $4.20 | $10.00 | $8.00 |
| 0053 | Incidental milling (1330000000-E) | SY | 8,060 | $8.00 | $8.00 | $7.00 | $10.00 | $8.00 |
| 0054 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 41,990 | $74.00 | $73.40 | $82.00 | $95.00 | $72.00 |
| 0055 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 26,720 | $77.00 | $76.31 | $85.00 | $96.00 | $76.00 |
| 0056 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 14,850 | $77.00 | $76.54 | $85.00 | $96.00 | $76.00 |
| 0057 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 14,800 | $85.00 | $82.00 | $87.50 | $96.00 | $84.00 |
| 0058 | Asphalt binder for plant mix (1575000000-E) | TON | 5,065 | $620.00 | $635.00 | $650.00 | $600.00 | $618.00 |
| 0059 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 130 | $552.87 | $250.00 | $90.00 | $241.46 | $200.00 |
| 0060 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E) | LF | 17,480 | $0.61 | $1.35 | $1.00 | $3.00 | $0.50 |
| 0061 | Right-of-way markers (2000000000-N) | EACH | 78 | $275.00 | $310.00 | $310.00 | $275.00 | $305.00 |
| 0062 | Control-of-access markers (2020000000-N) | EACH | 51 | $275.00 | $310.00 | $310.00 | $275.00 | $350.00 |
| 0063 | Subdrain excavation (2022000000-E) | CY | 470 | $21.38 | $35.00 | $15.00 | $35.00 | $26.00 |
| 0064 | Geotextile for subsurface drains (2026000000-E) | SY | 2,100 | $4.45 | $6.00 | $4.00 | $12.00 | $2.00 |
| 0065 | Subdrain coarse aggregate (2036000000-E) | CY | 353 | $92.91 | $55.00 | $105.00 | $85.00 | $70.00 |
| 0066 | 6" perforated subdrain pipe (2044000000-E) | LF | 2,100 | $6.35 | $15.00 | $24.00 | $17.00 | $2.00 |
| 0067 | Subdrain pipe outlet (2070000000-N) | EACH | 5 | $562.27 | $300.00 | $1,500.00 | $400.00 | $1,200.00 |
| 0068 | 6" outlet pipe (2077000000-E) | LF | 30 | $66.71 | $50.00 | $135.00 | $40.00 | $165.00 |
| 0069 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 11 | $1,984.35 | $2,875.13 | $3,000.00 | $3,000.00 | $2,000.00 |
| 0070 | Endwalls (2209000000-E) | CY | 13.90 | $1,580.52 | $1,800.00 | $2,800.00 | $1,000.00 | $700.00 |
| 0071 | Reinforced endwalls (2220000000-E) | CY | 6.30 | $2,349.71 | $2,500.00 | $3,650.00 | $2,000.00 | $550.00 |
| 0072 | Pipe collars (2253000000-E) | CY | 1.79 | $6,321.29 | $2,000.00 | $2,650.00 | $2,500.00 | $2,400.00 |
| 0073 | Flowable fill (2275000000-E) | CY | 129 | $991.84 | $400.00 | $430.00 | $250.00 | $370.00 |
| 0074 | Masonry drainage structures (2286000000-N) | EACH | 272 | $3,928.86 | $4,300.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0075 | Masonry drainage structures (2297000000-E) | CY | 12.57 | $3,428.63 | $3,500.00 | $1,850.00 | $4,500.00 | $2,200.00 |
| 0076 | Masonry drainage structures (2308000000-E) | LF | 169.30 | $713.13 | $750.00 | $500.00 | $500.00 | $450.00 |
| 0077 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 44 | $1,663.12 | $1,500.00 | $1,500.00 | $1,500.00 | $2,000.00 |
| 0078 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 12 | $2,524.36 | $1,300.00 | $1,500.00 | $1,500.00 | $1,900.00 |
| 0079 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 29 | $2,912.77 | $1,300.00 | $1,500.00 | $1,500.00 | $1,850.00 |
| 0080 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 8 | $2,912.77 | $1,400.00 | $1,500.00 | $1,500.00 | $1,850.00 |
| 0081 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 2 | $1,326.75 | $1,300.00 | $1,500.00 | $1,500.00 | $1,860.00 |
| 0082 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 13 | $1,516.11 | $1,600.00 | $1,600.00 | $2,000.00 | $2,100.00 |
| 0083 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 84 | $1,522.59 | $1,700.00 | $1,600.00 | $2,000.00 | $2,200.00 |
| 0084 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 69 | $1,522.59 | $1,700.00 | $1,600.00 | $2,000.00 | $2,300.00 |
| 0085 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 19 | $1,202.06 | $1,200.00 | $1,600.00 | $1,500.00 | $1,800.00 |
| 0086 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 2 | $3,340.34 | $3,500.00 | $3,000.00 | $3,500.00 | $3,500.00 |
| 0087 | Concrete transitional section for catch basin (2440000000-N) | EACH | 25 | $1,300.00 | $1,326.53 | $950.00 | $1,247.81 | $2,100.00 |
| 0088 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 32 | $1,300.00 | $1,326.53 | $950.00 | $1,235.21 | $2,000.00 |
| 0089 | Generic drainage item (EA) - DE-watering (2473000000-N) | EACH | 1 | $3,630.00 | $5,000.00 | $30,000 | $10,000 | $150,000 |
| 0090 | Generic drainage item (LF) - 36" pipe rehabilitation cipp liner (2484000000-E) | LF | 232 | $391.28 | $400.00 | $100.00 | $500.00 | $436.55 |
| 0091 | Generic drainage item (LF) - pre installation inspection (2484000000-E) | LF | 232 | $37.98 | $80.00 | $25.00 | $100.00 | $50.00 |
| 0092 | **"X**" concrete curb - (8" X 12") (2535000000-E) | LF | 100 | $68.95 | $75.14 | $61.00 | $51.30 | $39.17 |
| 0093 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 12,060 | $23.05 | $26.94 | $23.00 | $36.55 | $38.58 |
| 0094 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 21,910 | $31.85 | $35.92 | $26.00 | $39.07 | $43.10 |
| 0095 | Shoulder berm gutter (2556000000-E) | LF | 1,260 | $41.35 | $46.46 | $40.00 | $54.20 | $45.83 |
| 0096 | Concrete expressway gutter (2577000000-E) | LF | 110 | $76.90 | $82.73 | $56.00 | $60.50 | $64.22 |
| 0097 | Concrete valley gutter (2580000000-E) | LF | 1,960 | $31.10 | $36.00 | $33.00 | $35.29 | $45.94 |
| 0098 | 4" concrete sidewalk (2591000000-E) | SY | 11,660 | $59.00 | $76.15 | $53.00 | $64.28 | $83.90 |
| 0099 | Concrete curb ramps (2605000000-N) | EACH | 48 | $2,750.00 | $2,806.12 | $1,500.00 | $3,396.82 | $2,679.73 |
| 0100 | 6" concrete driveway (2612000000-E) | SY | 2,330 | $97.75 | $111.71 | $90.00 | $121.00 | $157.40 |
| 0101 | 4" concrete paved ditch (2619000000-E) | SY | 80 | $152.95 | $177.83 | $222.00 | $88.23 | $166.33 |
| 0102 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 3,330 | $85.05 | $86.79 | $78.00 | $138.65 | $172.02 |
| 0103 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 680 | $150.00 | $144.00 | $100.00 | $150.00 | $111.58 |
| 0104 | Adjustment of catch basins (2800000000-N) | EACH | 3 | $1,964.55 | $3,200.00 | $1,800.00 | $1,800.00 | $2,781.95 |
| 0105 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $2,590.79 | $3,400.00 | $1,800.00 | $1,800.00 | $3,900.00 |
| 0106 | Adjustment of manholes (2830000000-N) | EACH | 15 | $2,975.68 | $3,800.00 | $1,800.00 | $3,600.00 | $4,000.00 |
| 0107 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 28 | $1,021.22 | $1,500.00 | $650.00 | $1,000.00 | $4,100.00 |
| 0108 | Convert existing catch basin to junction box with manhole (2893000000-N) | EACH | 2 | $3,594.88 | $6,500.00 | $5,000.00 | $1,800.00 | $5,400.00 |
| 0109 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 1 | $3,514.90 | $6,400.00 | $5,000.00 | $1,800.00 | $6,900.00 |
| 0110 | Steel beam guardrail (3030000000-E) | LF | 5,800 | $30.00 | $30.46 | $30.00 | $30.00 | $30.00 |
| 0111 | Steel beam guardrail, shop curved (3045000000-E) | LF | 175 | $30.00 | $30.46 | $30.00 | $30.00 | $30.00 |
| 0112 | EX length GR post ** STL - (8') (3145000000-E) | EACH | 7,800 | $8.00 | $8.12 | $8.00 | $8.00 | $8.00 |
| 0113 | Additional guardrail posts (3150000000-N) | EACH | 25 | $45.00 | $45.69 | $45.00 | $45.00 | $45.00 |
| 0114 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $850.00 | $862.95 | $850.00 | $850.00 | $850.00 |
| 0115 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 11 | $900.00 | $913.71 | $900.00 | $900.00 | $900.00 |
| 0116 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,300.00 | $2,335.03 | $2,300.00 | $2,300.00 | $2,300.00 |
| 0117 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 12 | $3,100.00 | $3,147.21 | $3,100.00 | $3,100.00 | $3,100.00 |
| 0118 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 8 | $2,600.00 | $2,639.59 | $2,600.00 | $2,600.00 | $2,600.00 |
| 0119 | Remove existing guardrail (3360000000-E) | LF | 11,750 | $0.90 | $0.91 | $2.00 | $0.90 | $0.90 |
| 0120 | Temporary steel beam guardrail (3380000000-E) | LF | 5,000 | $11.00 | $11.17 | $11.00 | $11.00 | $11.00 |
| 0121 | Woven wire fence, 47" fabric (3503000000-E) | LF | 9,400 | $5.00 | $5.08 | $5.00 | $5.00 | $5.00 |
| 0122 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 622 | $43.50 | $44.16 | $37.00 | $43.50 | $43.50 |
| 0123 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 92 | $45.00 | $45.69 | $56.00 | $45.00 | $45.00 |
| 0124 | Chain link fence, 48" fabric (3536000000-E) | LF | 2,540 | $13.00 | $13.20 | $13.00 | $13.00 | $13.00 |
| 0125 | Metal line posts for 48" chain link fence (3542000000-E) | EACH | 212 | $20.00 | $20.30 | $20.00 | $20.00 | $20.00 |
| 0126 | Metal terminal posts for 48" chain link fence (3548000000-E) | EACH | 21 | $220.00 | $223.35 | $220.00 | $220.00 | $220.00 |
| 0127 | Generic fencing item 866 (EA) - vinyl coated metal line posts for 48" chain link fence (3579000000-N) | EACH | 150 | $26.00 | $26.40 | $26.00 | $26.00 | $26.00 |
| 0128 | Generic fencing item 866 (EA) - vinyl coated metal terminal posts for 48" chain link fence (3579000000-N) | EACH | 10 | $300.00 | $304.57 | $300.00 | $300.00 | $300.00 |
| 0129 | Generic fencing item 866 (LF) - vinyl coated chain link fence fabric (48") (3580000000-E) | LF | 1,810 | $15.00 | $15.23 | $15.00 | $15.00 | $15.00 |
| 0130 | Rip rap, class I (3628000000-E) | TON | 725 | $86.70 | $125.00 | $80.00 | $75.00 | $67.52 |
| 0131 | Rip rap, class II (3635000000-E) | TON | 525 | $89.66 | $145.00 | $80.00 | $80.00 | $81.21 |
| 0132 | Rip rap, class A (3642000000-E) | TON | 40 | $85.39 | $165.00 | $100.00 | $75.00 | $55.98 |
| 0133 | Rip rap, class B (3649000000-E) | TON | 915 | $87.69 | $150.00 | $75.00 | $75.00 | $100.00 |
| 0134 | Boulders (3651000000-E) | TON | 50 | $400.00 | $400.00 | $455.00 | $150.00 | $138.03 |
| 0135 | Geotextile for drainage (3656000000-E) | SY | 6,570 | $4.49 | $4.00 | $4.00 | $5.00 | $6.00 |
| 0136 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 776 | $18.00 | $18.56 | $18.00 | $18.00 | $18.00 |
| 0137 | Contr furn, type ***sign - (F) (4025000000-E) | SF | 114 | $18.00 | $18.56 | $18.00 | $18.00 | $18.00 |
| 0138 | Reinforced concrete sign foundations (4048000000-E) | CY | 5 | $950.00 | $979.38 | $950.00 | $950.00 | $950.00 |
| 0139 | Plain concrete sign foundations (4054000000-E) | CY | 1 | $5.00 | $5.15 | $5.00 | $5.00 | $5.00 |
| 0140 | Overhead footing (4057000000-E) | CY | 85 | $3,500.00 | $2,886.60 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0141 | Supports, breakaway steel beam (4060000000-E) | LB | 6,783 | $8.00 | $8.25 | $8.00 | $8.00 | $8.00 |
| 0142 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 2,069 | $8.00 | $8.25 | $8.00 | $8.00 | $8.00 |
| 0143 | Sign erection, type E (4102000000-N) | EACH | 105 | $75.00 | $77.32 | $75.00 | $75.00 | $75.00 |
| 0144 | Sign erection, type F (4108000000-N) | EACH | 8 | $125.00 | $128.87 | $125.00 | $125.00 | $125.00 |
| 0145 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 18 | $10.00 | $10.31 | $10.00 | $10.00 | $10.00 |
| 0146 | Sign erection, type *** (ovrhd) - (B) (4109000000-N) | EACH | 16 | $10.00 | $10.31 | $10.00 | $10.00 | $10.00 |
| 0147 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 11 | $950.00 | $979.38 | $950.00 | $950.00 | $950.00 |
| 0148 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 2 | $350.00 | $360.83 | $350.00 | $350.00 | $350.00 |
| 0149 | Sign erection, milemarkers (4114000000-N) | EACH | 2 | $75.00 | $77.32 | $75.00 | $75.00 | $75.00 |
| 0150 | Sign erection, overlay (overhead) (4115000000-N) | EACH | 1 | $500.00 | $515.46 | $500.00 | $500.00 | $500.00 |
| 0151 | Support, ovrhd sign STR ***** - (30+50 -Y1-) (4130000000-N) | LS | 1 | $82,000 | $84,536 | $82,000 | $82,000 | $82,000 |
| 0152 | Support, ovrhd sign STR ***** - (42+85 -Y1-) (4130000000-N) | LS | 1 | $82,000 | $84,536 | $82,000 | $82,000 | $82,000 |
| 0153 | Support, ovrhd sign STR ***** - (54+50-Y1-) (4130000000-N) | LS | 1 | $82,000 | $84,536 | $82,000 | $82,000 | $82,000 |
| 0154 | Support, ovrhd sign STR ***** - (57+57 -Y1-) (4130000000-N) | LS | 1 | $82,000 | $84,536 | $82,000 | $82,000 | $82,000 |
| 0155 | Support, ovrhd sign STR ***** - (77+50 -Y1-) (4130000000-N) | LS | 1 | $62,000 | $63,918 | $62,000 | $62,000 | $62,000 |
| 0156 | Support, ovrhd sign STR ***** - (80+00 -Y1-) (4130000000-N) | LS | 1 | $55,000 | $56,701 | $55,000 | $55,000 | $55,000 |
| 0157 | Support, ovrhd sign STR ***** - (90+80 -Y1-) (4130000000-N) | LS | 1 | $55,000 | $56,701 | $55,000 | $55,000 | $55,000 |
| 0158 | Disposal of sign system, overhead (4149000000-N) | EACH | 1 | $7,500.00 | $7,731.96 | $7,500.00 | $7,500.00 | $7,500.00 |
| 0159 | Disposal of sign system, U-channel (4155000000-N) | EACH | 69 | $2.00 | $2.06 | $2.00 | $2.00 | $2.00 |
| 0160 | Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N) | EACH | 16 | $200.00 | $206.19 | $200.00 | $200.00 | $200.00 |
| 0161 | Work zone signs (stationary) (4400000000-E) | SF | 2,716 | $6.05 | $4.09 | $7.00 | $5.84 | $6.43 |
| 0162 | High visibility stationary signs (4402000000-E) | SF | 224 | $8.40 | $6.50 | $12.00 | $8.11 | $8.93 |
| 0163 | Work zone signs (portable) (4405000000-E) | SF | 289 | $9.04 | $9.23 | $9.00 | $8.73 | $9.62 |
| 0164 | Work zone signs (barricade mounted) (4410000000-E) | SF | 290 | $9.58 | $6.82 | $7.00 | $9.25 | $10.19 |
| 0165 | Work zone advance/general warning signing (4413000000-E) | SF | 130 | $5.89 | $4.53 | $9.00 | $5.68 | $6.26 |
| 0166 | Flashing arrow board (4415000000-N) | EACH | 4 | $4,500.00 | $2,019.90 | $5,275.00 | $2,170.53 | $2,389.91 |
| 0167 | Portable changeable message sign (4420000000-N) | EACH | 4 | $10,000 | $9,717.35 | $18,250 | $7,028.38 | $7,738.75 |
| 0168 | Drums (4430000000-N) | EACH | 343 | $95.00 | $55.68 | $45.00 | $42.89 | $47.23 |
| 0169 | High visibility drums (4432000000-N) | EACH | 154 | $100.00 | $60.00 | $68.00 | $54.78 | $60.32 |
| 0170 | Sequential flashing warning lights (4434000000-N) | EACH | 39 | $144.45 | $147.40 | $95.00 | $139.53 | $153.64 |
| 0171 | Barricades (type III) (4445000000-E) | LF | 624 | $21.40 | $16.38 | $22.00 | $20.67 | $22.76 |
| 0172 | Pedestrian channelizing devices (4447000000-E) | LF | 24 | $42.80 | $34.94 | $75.00 | $41.34 | $45.52 |
| 0173 | Flagger (4455000000-N) | DAY | 660 | $410.00 | $1,200.00 | $85.00 | $400.00 | $700.00 |
| 0174 | Temporary traffic control (4457000000-N) | LS | 1 | $173,000 | $25,000 | $150,000 | $350,000 | $170,708 |
| 0175 | Temporary crash cushions (4465000000-N) | EACH | 8 | $7,896.15 | $11,803 | $8,800.00 | $11,610 | $4,893.62 |
| 0176 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 4 | $2,516.46 | $3,335.64 | $3,400.00 | $3,281.03 | $2,389.91 |
| 0177 | TMA (4480000000-N) | EACH | 4 | $10,000 | $27,296 | $4,000.00 | $55,814 | $3,072.74 |
| 0178 | Portable concrete barrier (4485000000-E) | LF | 8,931 | $39.84 | $46.45 | $50.00 | $45.69 | $32.15 |
| 0179 | Portable concrete barrier (anchored) (4490000000-E) | LF | 7,965 | $57.28 | $70.45 | $80.00 | $69.30 | $58.68 |
| 0180 | Law enforcement (4510000000-N) | HR | 80 | $125.00 | $85.00 | $60.00 | $65.00 | $150.00 |
| 0181 | Generic traffic control item (LS) - dynamic zipper merge system deployment (4589000000-N) | LS | 1 | $9,630.00 | $9,280.61 | $12,000 | $9,302.27 | $10,242 |
| 0182 | Generic traffic control item (EA) - connected lane closure system (4600000000-N) | EACH | 1 | $856.00 | $2,292.86 | $1,000.00 | $826.87 | $910.44 |
| 0183 | Generic traffic control item (EA) - dynamic zipper merge system relocation (4600000000-N) | EACH | 1 | $2,675.00 | $2,565.82 | $5,000.00 | $2,583.96 | $2,845.13 |
| 0184 | Generic traffic control item (day) - dynamic zipper merge system (4609000000-N) | DAY | 14 | $1,819.00 | $2,074.49 | $2,200.00 | $1,757.10 | $1,934.69 |
| 0185 | Temporary raised pavement markers (4650000000-N) | EACH | 539 | $8.00 | $5.38 | $8.00 | $5.30 | $8.00 |
| 0186 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 63,133 | $0.51 | $0.50 | $0.50 | $0.49 | $0.51 |
| 0187 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 38,638 | $0.80 | $0.70 | $0.80 | $0.69 | $0.80 |
| 0188 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 12,932 | $2.25 | $2.54 | $2.30 | $2.50 | $2.25 |
| 0189 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 2,775 | $3.75 | $5.23 | $3.80 | $5.15 | $3.75 |
| 0190 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 89 | $15.75 | $11.17 | $15.70 | $11.00 | $15.75 |
| 0191 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 8 | $125.00 | $226.40 | $125.00 | $223.00 | $125.00 |
| 0192 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 168 | $175.00 | $147.21 | $175.00 | $145.00 | $175.00 |
| 0193 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 101 | $295.00 | $200.00 | $295.00 | $197.00 | $295.00 |
| 0194 | 4" cold appl plstic lines type ** - (II) (4770000000-E) | LF | 777 | $8.00 | $8.68 | $8.00 | $8.55 | $8.00 |
| 0195 | Cold appl plastic sym type ** - (II) (4805000000-N) | EACH | 1 | $725.00 | $1,421.32 | $725.00 | $1,400.00 | $725.00 |
| 0196 | Paint pavement marking lines (4") (4810000000-E) | LF | 130,266 | $0.15 | $0.36 | $0.20 | $0.35 | $0.15 |
| 0197 | Paint pavement marking lines (6") (4815000000-E) | LF | 105,454 | $0.20 | $0.37 | $0.20 | $0.36 | $0.20 |
| 0198 | Paint pavement marking lines (8") (4820000000-E) | LF | 7,131 | $0.60 | $0.44 | $0.60 | $0.43 | $0.60 |
| 0199 | Paint pavement marking lines (12") (4825000000-E) | LF | 1,757 | $0.95 | $1.98 | $1.00 | $1.95 | $0.95 |
| 0200 | Paint pavement marking lines (24") (4835000000-E) | LF | 999 | $3.50 | $3.91 | $3.50 | $3.85 | $3.50 |
| 0201 | Paint pavement marking character (4840000000-N) | EACH | 6 | $35.00 | $84.26 | $35.00 | $83.00 | $35.00 |
| 0202 | Paint pavement marking symbol (4845000000-N) | EACH | 127 | $35.00 | $89.34 | $35.00 | $88.00 | $35.00 |
| 0203 | Removal of pavement marking lines (4") (4850000000-E) | LF | 24,048 | $0.45 | $0.30 | $0.50 | $0.30 | $0.45 |
| 0204 | Removal of pavement marking lines (6") (4855000000-E) | LF | 28,242 | $0.55 | $0.30 | $0.60 | $0.30 | $0.55 |
| 0205 | Removal of pavement marking lines (8") (4860000000-E) | LF | 685 | $2.00 | $1.42 | $2.00 | $1.40 | $2.00 |
| 0206 | Removal of pavement marking lines (12") (4865000000-E) | LF | 331 | $2.75 | $1.98 | $2.75 | $1.95 | $2.75 |
| 0207 | Removal of pavement marking lines (24") (4870000000-E) | LF | 179 | $5.50 | $2.74 | $5.50 | $2.70 | $5.50 |
| 0208 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 23 | $60.00 | $42.64 | $60.00 | $42.00 | $60.00 |
| 0209 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 18 | $15.75 | $62.94 | $15.75 | $62.00 | $15.75 |
| 0210 | Permanent raised pavement markers (4900000000-N) | EACH | 980 | $8.00 | $6.19 | $8.00 | $6.10 | $8.00 |
| 0211 | 80' high mount standard (5005000000-E) | EACH | 2 | $36,000 | $36,456 | $40,000 | $55,886 | $36,000 |
| 0212 | 100' high mount standard (5010000000-E) | EACH | 2 | $39,500 | $40,000 | $45,000 | $65,095 | $39,500 |
| 0213 | 120' high mount standard (5015000000-E) | EACH | 2 | $47,000 | $47,595 | $50,000 | $74,081 | $47,000 |
| 0214 | Portable drive unit (5020000000-N) | EACH | 1 | $8,000.00 | $8,101.27 | $8,000.00 | $12,215 | $8,000.00 |
| 0215 | High mount foundations (5025000000-E) | CY | 42 | $1,325.00 | $1,341.77 | $1,325.00 | $2,506.00 | $1,325.00 |
| 0216 | HM luminaire ************ - (335W LED) (5030000000-N) | EACH | 16 | $1,650.00 | $1,670.89 | $1,650.00 | $2,180.00 | $1,650.00 |
| 0217 | HM luminaire ************ - (560W LED) (5030000000-N) | EACH | 28 | $2,400.00 | $2,430.38 | $2,400.00 | $2,349.00 | $2,400.00 |
| 0218 | Service pole ************ - (30' class 4) (5120000000-N) | EACH | 1 | $1,050.00 | $1,063.29 | $1,050.00 | $4,367.00 | $1,050.00 |
| 0219 | Service lateral ********* - (3 #1/0 use) (5125000000-E) | LF | 70 | $37.00 | $37.47 | $37.00 | $54.00 | $37.00 |
| 0220 | Lite CNTRL RW************ - (240/480 V) (5145000000-N) | EACH | 1 | $23,000 | $23,291 | $23,000 | $29,883 | $23,000 |
| 0221 | Elect duct **, size ***** - (TL, 3") (5150000000-E) | LF | 80 | $32.00 | $32.41 | $32.00 | $33.00 | $32.00 |
| 0222 | Elect duct **, size ***** - (TL, 4") (5150000000-E) | LF | 80 | $38.00 | $38.48 | $38.00 | $42.00 | $38.00 |
| 0223 | Elect duct BD, size ***** - (2") (5155000000-E) | LF | 340 | $12.00 | $12.15 | $12.00 | $16.00 | $12.00 |
| 0224 | Elect duct BD, size ***** - (3") (5155000000-E) | LF | 135 | $13.00 | $13.16 | $13.00 | $19.00 | $13.00 |
| 0225 | **-#6 W/G feeder circuit - (2) (5175000000-E) | LF | 880 | $6.60 | $6.68 | $6.60 | $17.00 | $6.60 |
| 0226 | **-#8 W/G feedr N *****" - (2, 1-1/2") (5205000000-E) | LF | 179 | $13.50 | $13.67 | $13.50 | $18.00 | $13.50 |
| 0227 | **-#6 W/G feedr N *****" - (2, 1-1/2") (5210000000-E) | LF | 5,450 | $14.25 | $14.43 | $14.25 | $15.00 | $14.25 |
| 0228 | Elec JB ************ - (CS36) (5240000000-N) | EACH | 1 | $2,495.00 | $2,526.58 | $2,495.00 | $2,200.00 | $2,495.00 |
| 0229 | Elec JB ************ - (HM18) (5240000000-N) | EACH | 6 | $1,140.00 | $1,154.43 | $1,140.00 | $1,100.00 | $1,140.00 |
| 0230 | Elec JB ************ - (IG18) (5240000000-N) | EACH | 4 | $1,140.00 | $1,154.43 | $1,140.00 | $1,100.00 | $1,140.00 |
| 0231 | Elec JB ************ - (IG36) (5240000000-N) | EACH | 2 | $2,495.00 | $2,526.58 | $2,495.00 | $2,200.00 | $2,495.00 |
| 0232 | Portable lighting (5255000000-N) | LS | 1 | $69,717 | $35,000 | $300,000 | $45,033 | $75,000 |
| 0233 | 6" water line (5325600000-E) | LF | 1,664 | $178.66 | $142.86 | $150.00 | $125.00 | $125.00 |
| 0234 | 8" water line (5325800000-E) | LF | 2,143 | $119.41 | $153.06 | $160.00 | $155.00 | $155.00 |
| 0235 | 12" water line (5326200000-E) | LF | 5,319 | $158.48 | $183.67 | $230.00 | $205.00 | $205.00 |
| 0236 | DI H2O pipe fittings (5329000000-E) | LB | 19,651 | $16.37 | $14.29 | $16.00 | $16.00 | $16.00 |
| 0237 | 6" valve (5540000000-E) | EACH | 23 | $3,571.18 | $3,163.27 | $6,200.00 | $3,650.00 | $3,650.00 |
| 0238 | 8" valve (5546000000-E) | EACH | 6 | $5,168.41 | $4,285.72 | $8,000.00 | $4,850.00 | $4,850.00 |
| 0239 | 12" valve (5558000000-E) | EACH | 15 | $7,649.48 | $7,346.94 | $8,200.00 | $7,150.00 | $7,150.00 |
| 0240 | **" insertion valve - (8") (5562000000-E) | EACH | 1 | $23,646 | $15,306 | $22,500 | $22,250 | $22,250 |
| 0241 | 6" tapping sleeve & valve (5571600000-E) | EACH | 1 | $15,622 | $9,183.67 | $1,200.00 | $15,755 | $15,755 |
| 0242 | 2" air release valve (5589200000-E) | EACH | 2 | $8,840.38 | $16,327 | $10,500 | $10,740 | $10,740 |
| 0243 | **" water meter - (5/8") (5643000000-E) | EACH | 2 | $3,490.45 | $1,020.41 | $5,500.00 | $2,600.00 | $2,600.00 |
| 0244 | Relocate water meter (5648000000-N) | EACH | 28 | $3,057.56 | $1,632.65 | $4,500.00 | $2,900.00 | $2,900.00 |
| 0245 | Reconnect water meter (5649000000-N) | EACH | 20 | $2,484.64 | $1,377.55 | $4,500.00 | $2,690.00 | $2,690.00 |
| 0246 | Fire hydrant (5666000000-N) | EACH | 12 | $9,164.61 | $9,183.67 | $10,000 | $8,750.00 | $8,750.00 |
| 0247 | Fire hydrant leg (5673000000-E) | LF | 155 | $177.20 | $137.76 | $300.00 | $215.00 | $215.00 |
| 0248 | 6" line stop (5678400000-E) | EACH | 1 | $17,190 | $8,877.55 | $8,100.00 | $16,750 | $16,750 |
| 0249 | Water service line (<2") (5686500000-E) | LF | 2,125 | $71.77 | $102.04 | $110.00 | $135.00 | $135.00 |
| 0250 | 8" sanitary gravity sewer (5691300000-E) | LF | 3,285 | $187.88 | $234.69 | $125.00 | $265.00 | $265.00 |
| 0251 | 12" sanitary gravity sewer (5691500000-E) | LF | 1,866 | $204.95 | $295.92 | $135.00 | $420.00 | $420.00 |
| 0252 | 24" sanitary gravity sewer (5691900000-E) | LF | 203 | $842.95 | $581.63 | $630.00 | $960.00 | $960.00 |
| 0253 | Sanitary sewer clean-out (5768000000-N) | EACH | 16 | $2,684.46 | $4,897.96 | $1,550.00 | $4,695.00 | $4,695.00 |
| 0254 | Sewer service line (5768500000-E) | LF | 700 | $176.51 | $132.65 | $40.00 | $265.00 | $265.00 |
| 0255 | 4' dia utility manhole (5775000000-E) | EACH | 23 | $9,982.62 | $9,387.76 | $9,000.00 | $7,850.00 | $7,850.00 |
| 0256 | 5' dia utility manhole (5776000000-E) | EACH | 9 | $16,552 | $14,286 | $12,000 | $11,000 | $11,000 |
| 0257 | Utility manhole wall 4' dia (5781000000-E) | LF | 121 | $753.78 | $1,000.00 | $750.00 | $985.00 | $985.00 |
| 0258 | Utility manhole wall 5' dia (5782000000-E) | LF | 91 | $753.78 | $1,326.53 | $875.00 | $1,350.00 | $1,350.00 |
| 0259 | Abandon **" utility pipe - (4") (5798000000-E) | LF | 87 | $60.52 | $10.20 | $15.00 | $90.00 | $90.00 |
| 0260 | Abandon 6" utility pipe (5800000000-E) | LF | 1,148 | $24.69 | $14.29 | $15.00 | $18.00 | $18.00 |
| 0261 | Abandon 8" utility pipe (5801000000-E) | LF | 4,421 | $28.37 | $16.33 | $15.00 | $20.00 | $20.00 |
| 0262 | Abandon 12" utility pipe (5804000000-E) | LF | 6,857 | $23.77 | $16.33 | $15.00 | $22.00 | $22.00 |
| 0263 | Abandon 24" utility pipe (5813000000-E) | LF | 148 | $87.39 | $51.02 | $15.00 | $95.00 | $95.00 |
| 0264 | Remove fire hydrant (5815500000-N) | EACH | 8 | $1,749.01 | $2,040.82 | $1,400.00 | $2,800.00 | $2,800.00 |
| 0265 | Remove utility manhole (5828000000-N) | EACH | 27 | $2,237.78 | $2,040.82 | $2,100.00 | $4,200.00 | $4,200.00 |
| 0266 | **" encasement pipe - (48") (5835000000-E) | LF | 95 | $398.62 | $1,224.49 | $1,100.00 | $950.00 | $950.00 |
| 0267 | 16" encasement pipe (5835700000-E) | LF | 495 | $222.28 | $265.31 | $300.00 | $195.00 | $195.00 |
| 0268 | 20" encasement pipe (5835900000-E) | LF | 906 | $246.01 | $346.94 | $415.00 | $220.00 | $220.00 |
| 0269 | 24" encasement pipe (5836000000-E) | LF | 269 | $296.71 | $443.88 | $375.00 | $335.00 | $335.00 |
| 0270 | Bore & jack **" - (16") (5872500000-E) | LF | 263 | $1,591.53 | $0.01 | $525.00 | $550.00 | $550.00 |
| 0271 | Bore & jack **" - (20") (5872500000-E) | LF | 384 | $1,623.55 | $0.01 | $725.00 | $735.00 | $735.00 |
| 0272 | Bore & jack **" - (24") (5872500000-E) | LF | 218 | $1,698.04 | $0.01 | $800.00 | $820.00 | $820.00 |
| 0273 | Bore & jack **" - (48") (5872500000-E) | LF | 42 | $4,211.22 | $3,316.33 | $3,500.00 | $3,700.00 | $3,700.00 |
| 0274 | Generic utility item (EA) - concrete support pier (5882000000-N) | EACH | 2 | $9,643.77 | $8,163.27 | $16,500 | $4,500.00 | $4,500.00 |
| 0275 | Generic utility item (EA) - thrust collar (5882000000-N) | EACH | 18 | $7,851.59 | $4,285.71 | $6,000.00 | $1,200.00 | $1,200.00 |
| 0276 | Temporary silt fence (6000000000-E) | LF | 48,725 | $2.02 | $2.05 | $2.60 | $2.02 | $2.60 |
| 0277 | Stone for erosion control, class A (6006000000-E) | TON | 2,460 | $84.45 | $63.00 | $65.00 | $75.00 | $52.32 |
| 0278 | Stone for erosion control, class B (6009000000-E) | TON | 6,460 | $0.01 | $130.00 | $65.00 | $75.00 | $53.97 |
| 0279 | Sediment control stone (6012000000-E) | TON | 6,280 | $0.01 | $90.00 | $55.00 | $65.00 | $43.77 |
| 0280 | Temporary mulching (6015000000-E) | ACRE | 22 | $985.00 | $1,000.00 | $1,600.00 | $985.00 | $1,600.00 |
| 0281 | Seed for temporary seeding (6018000000-E) | LB | 1,100 | $1.00 | $1.02 | $2.00 | $1.00 | $2.00 |
| 0282 | Fertilizer for temporary seeding (6021000000-E) | TON | 6 | $900.00 | $913.71 | $825.00 | $900.00 | $825.00 |
| 0283 | Temporary slope drains (6024000000-E) | LF | 4,225 | $23.27 | $11.00 | $56.59 | $20.00 | $22.50 |
| 0284 | Safety fence (6029000000-E) | LF | 680 | $2.00 | $2.03 | $2.50 | $2.00 | $10.00 |
| 0285 | Silt excavation (6030000000-E) | CY | 23,830 | $0.01 | $0.01 | $12.25 | $15.00 | $3.45 |
| 0286 | Matting for erosion control (6036000000-E) | SY | 71,000 | $1.35 | $1.37 | $1.45 | $1.35 | $1.45 |
| 0287 | Coir fiber mat (6037000000-E) | SY | 205 | $18.00 | $18.27 | $6.00 | $18.00 | $6.00 |
| 0288 | 1/4" hardware cloth (6042000000-E) | LF | 12,870 | $3.75 | $3.81 | $3.75 | $3.75 | $3.75 |
| 0289 | Low permeability geotextile (6043000000-E) | SY | 1,200 | $11.23 | $4.00 | $6.00 | $6.50 | $6.00 |
| 0290 | **" temporary pipe - (36") (6045000000-E) | LF | 145 | $125.00 | $200.00 | $325.00 | $125.00 | $125.00 |
| 0291 | **" temporary pipe - (48") (6045000000-E) | LF | 224 | $175.00 | $210.00 | $450.00 | $175.00 | $175.00 |
| 0292 | Special stilling basins (6070000000-N) | EACH | 4 | $500.00 | $1,108.63 | $15,000 | $500.00 | $3,000.00 |
| 0293 | Flocculant (6071002000-E) | LB | 2,620 | $1.00 | $1.02 | $2.00 | $1.00 | $9.00 |
| 0294 | Coir fiber wattle (6071012000-E) | LF | 6,960 | $9.00 | $9.14 | $9.00 | $9.00 | $9.00 |
| 0295 | Coir fiber wattle barrier (6071014000-E) | LF | 260 | $10.00 | $10.15 | $32.00 | $10.00 | $32.00 |
| 0296 | Coir fiber baffle (6071030000-E) | LF | 3,865 | $6.50 | $6.60 | $7.00 | $6.50 | $7.00 |
| 0297 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 10 | $1,464.50 | $1,500.00 | $6,000.00 | $750.00 | $1,150.00 |
| 0298 | **" skimmer - (2") (6071050000-E) | EACH | 6 | $1,634.37 | $1,900.00 | $7,000.00 | $850.00 | $1,300.00 |
| 0299 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 1 | $1,870.98 | $2,200.00 | $8,000.00 | $950.00 | $3,625.00 |
| 0300 | Seeding and mulching (6084000000-E) | ACRE | 39 | $2,525.00 | $2,563.45 | $2,450.00 | $2,525.00 | $2,450.00 |
| 0301 | Mowing (6087000000-E) | ACRE | 36 | $150.00 | $152.28 | $175.00 | $150.00 | $175.00 |
| 0302 | Seed for repair seeding (6090000000-E) | LB | 200 | $3.00 | $3.05 | $4.25 | $3.00 | $4.25 |
| 0303 | Fertilizer for repair seeding (6093000000-E) | TON | 2 | $800.00 | $812.19 | $1,250.00 | $800.00 | $1,250.00 |
| 0304 | Seed for supplemental seeding (6096000000-E) | LB | 900 | $3.00 | $3.05 | $4.25 | $3.00 | $4.25 |
| 0305 | Fertilizer topdressing (6108000000-E) | TON | 27 | $925.00 | $939.09 | $800.00 | $925.00 | $800.00 |
| 0306 | Impervious dike (6111000000-E) | LF | 268 | $85.00 | $175.00 | $225.00 | $100.00 | $165.00 |
| 0307 | Specialized hand mowing (6114500000-N) | MHR | 60 | $100.00 | $101.52 | $110.00 | $100.00 | $400.00 |
| 0308 | Manual litter removal (6114800000-N) | MHR | 20 | $124.04 | $120.00 | $110.00 | $120.00 | $160.00 |
| 0309 | Litter disposal (6114900000-E) | TON | 3 | $383.21 | $250.00 | $200.00 | $200.00 | $1,100.00 |
| 0310 | Response for erosion control (6117000000-N) | EACH | 100 | $1.00 | $1.02 | $100.00 | $1.00 | $100.00 |
| 0311 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,650.00 | $1,500.00 | $5,000.00 | $3,500.00 | $4,000.00 |
| 0312 | Culvert diversion channel (6120000000-E) | CY | 338 | $30.00 | $18.00 | $100.00 | $200.00 | $100.00 |
| 0313 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 12 | $330.00 | $1,500.00 | $4,025.00 | $600.00 | $2,500.00 |
| 0314 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E) | SY | 40 | $5.00 | $15.00 | $4.00 | $4.50 | $4.00 |
| 0315 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 18 | $1,600.00 | $1,620.25 | $1,600.00 | $1,834.00 | $1,600.00 |
| 0316 | Signal cable (7060000000-E) | LF | 8,600 | $5.00 | $5.06 | $5.00 | $7.00 | $5.00 |
| 0317 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 22 | $1,300.00 | $1,316.46 | $1,300.00 | $1,515.00 | $1,300.00 |
| 0318 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 9 | $1,700.00 | $1,721.52 | $1,700.00 | $1,737.00 | $1,700.00 |
| 0319 | Messenger cable (3/8") (7264000000-E) | LF | 1,600 | $8.50 | $8.61 | $8.50 | $15.00 | $8.50 |
| 0320 | Tracer wire (7279000000-E) | LF | 8,300 | $1.25 | $1.27 | $1.25 | $2.00 | $1.25 |
| 0321 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 25 | $33.00 | $33.42 | $33.00 | $45.00 | $33.00 |
| 0322 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 4,020 | $16.00 | $16.20 | $16.00 | $18.00 | $16.00 |
| 0323 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 6,830 | $33.00 | $33.42 | $33.00 | $47.00 | $33.00 |
| 0324 | Junction box (***************) - (special oversized, heavy-duty) (7312000000-N) | EACH | 6 | $1,450.00 | $1,468.36 | $1,450.00 | $4,782.00 | $1,450.00 |
| 0325 | Junction box (standard size) (7324000000-N) | EACH | 21 | $740.00 | $749.37 | $740.00 | $908.00 | $740.00 |
| 0326 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 25 | $1,150.00 | $1,164.56 | $1,150.00 | $1,700.00 | $1,150.00 |
| 0327 | Inductive loop sawcut (7444000000-E) | LF | 3,125 | $18.50 | $18.73 | $18.50 | $29.00 | $18.50 |
| 0328 | Lead-in cable (14-2) (7456100000-E) | LF | 10,600 | $2.65 | $2.68 | $2.65 | $3.00 | $2.65 |
| 0329 | Site survey (7481000000-N) | EACH | 4 | $800.00 | $810.13 | $800.00 | $1,474.00 | $800.00 |
| 0330 | Luminaire arm for video system (7481200000-N) | EACH | 7 | $1,200.00 | $1,215.19 | $1,200.00 | $1,083.00 | $1,200.00 |
| 0331 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 7 | $2,500.00 | $2,531.65 | $2,500.00 | $3,385.00 | $2,500.00 |
| 0332 | External loop emulator processing unit (7481260000-N) | EACH | 7 | $3,000.00 | $3,037.97 | $3,000.00 | $16,067 | $3,000.00 |
| 0333 | Communications cable (** fiber) - (12) (7516000000-E) | LF | 3,860 | $1.80 | $1.82 | $1.80 | $5.00 | $1.80 |
| 0334 | Communications cable (** fiber) - (144) (7516000000-E) | LF | 5,510 | $5.00 | $5.06 | $5.00 | $6.00 | $5.00 |
| 0335 | Drop cable (7528000000-E) | LF | 90 | $3.70 | $3.75 | $3.70 | $5.00 | $3.70 |
| 0336 | Splice enclosure (7540000000-N) | EACH | 3 | $3,775.00 | $2,810.13 | $3,775.00 | $7,362.00 | $3,775.00 |
| 0337 | Interconnect center (7552000000-N) | EACH | 4 | $7,300.00 | $7,392.41 | $7,300.00 | $2,941.00 | $7,300.00 |
| 0338 | Delineator marker (7566000000-N) | EACH | 20 | $125.00 | $126.58 | $125.00 | $184.00 | $125.00 |
| 0339 | Remove existing communications cable (7575160000-E) | LF | 5,120 | $1.25 | $1.27 | $1.25 | $2.00 | $1.25 |
| 0340 | Metal strain signal pole (7576000000-N) | EACH | 12 | $19,800 | $20,051 | $19,800 | $25,000 | $19,800 |
| 0341 | Soil test (7613000000-N) | EACH | 13 | $1,775.00 | $1,797.47 | $1,775.00 | $2,012.00 | $1,775.00 |
| 0342 | Drilled pier foundation (7614100000-E) | CY | 78 | $1,310.00 | $1,326.58 | $1,310.00 | $2,506.00 | $1,310.00 |
| 0343 | Sign for signals (7636000000-N) | EACH | 8 | $720.00 | $729.11 | $720.00 | $857.00 | $720.00 |
| 0344 | Type II pedestal with foundation (7642200000-N) | EACH | 16 | $3,785.00 | $3,832.91 | $3,785.00 | $4,158.00 | $3,785.00 |
| 0345 | Signal cabinet foundation (7684000000-N) | EACH | 3 | $1,770.00 | $1,792.41 | $1,770.00 | $3,414.00 | $1,770.00 |
| 0346 | Conduit entrance into existing foundation (7686000000-N) | EACH | 1 | $875.00 | $886.08 | $875.00 | $1,046.00 | $875.00 |
| 0347 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 3 | $25,700 | $26,025 | $25,700 | $33,000 | $25,700 |
| 0348 | Detector card (***********) - (type 170) (7708000000-N) | EACH | 20 | $240.00 | $243.04 | $240.00 | $253.00 | $240.00 |
| 0349 | Cabinet base extender (7901000000-N) | EACH | 3 | $845.00 | $855.70 | $845.00 | $847.00 | $845.00 |
| 0350 | Generic signal item (EA) - 2070LX controller (7980000000-N) | EACH | 1 | $4,750.00 | $4,810.13 | $4,750.00 | $5,888.00 | $4,750.00 |
| 0351 | Generic signal item (EA) - 5/8" X 10' grounding electrode (7980000000-N) | EACH | 4 | $230.00 | $232.91 | $230.00 | $540.00 | $230.00 |
| 0352 | Generic signal item (EA) - CCTV metal pole (7980000000-N) | EACH | 1 | $8,850.00 | $8,962.03 | $8,850.00 | $20,064 | $8,850.00 |
| 0353 | Generic signal item (EA) - digital CCTV camera assembly (7980000000-N) | EACH | 1 | $7,000.00 | $7,088.61 | $7,000.00 | $6,926.00 | $7,000.00 |
| 0354 | Generic signal item (EA) - equipment cabinet disconnect (7980000000-N) | EACH | 1 | $1,175.00 | $1,189.87 | $1,175.00 | $2,002.00 | $1,175.00 |
| 0355 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 1 | $2,050.00 | $2,075.95 | $2,050.00 | $1,909.00 | $2,050.00 |
| 0356 | Generic signal item (EA) - field equipment cabinet (7980000000-N) | EACH | 1 | $5,875.00 | $5,949.37 | $5,875.00 | $15,000 | $5,875.00 |
| 0357 | Generic signal item (EA) - meter base/disconnect combination panel (7980000000-N) | EACH | 1 | $1,175.00 | $1,189.87 | $1,175.00 | $2,002.00 | $1,175.00 |
| 0358 | Generic signal item (EA) - protective coating for strain pole (black) (7980000000-N) | EACH | 12 | $900.00 | $911.39 | $900.00 | $1,600.00 | $900.00 |
| 0359 | Generic signal item (EA) - protective coating for type II signal pedestal (black) (7980000000-N) | EACH | 14 | $120.00 | $121.52 | $120.00 | $168.00 | $120.00 |
| 0360 | Generic signal item (LF) - #4 solid bare grounding conductor (7990000000-E) | LF | 40 | $8.50 | $8.61 | $8.50 | $21.00 | $8.50 |
| 0361 | Generic signal item (LF) - 3-wire copper feeder conductors (7990000000-E) | LF | 200 | $11.75 | $11.90 | $11.75 | $7.00 | $11.75 |
| 0362 | Generic signal item (LF) - 3-wire copper service entrance conductors (7990000000-E) | LF | 30 | $9.25 | $9.37 | $11.75 | $7.00 | $9.25 |
| 0363 | Remv exist STR ****** culv (402) - (90+93.82 -L-) (8056000000-N) | LS | 1 | $35,000 | $50,000 | $40,000 | $46,082 | $35,000 |
| 0364 | Box culv excav @ ******** - (22+76.41 -L-) (8130000000-N) | LS | 1 | $75,000 | $150,000 | $400,000 | $100,000 | $75,000 |
| 0365 | Box culv excav @ ******** - (58+35.89 -Y1-) (8130000000-N) | LS | 1 | $30,000 | $40,000 | $50,000 | $50,000 | $30,000 |
| 0366 | Box culv excav @ ******** - (90+93.82 -L-) (8130000000-N) | LS | 1 | $80,000 | $75,000 | $250,000 | $100,000 | $80,000 |
| 0367 | Foundation conditioning material, box culvert (8133000000-E) | TON | 685 | $85.00 | $100.00 | $130.00 | $85.00 | $85.00 |
| 0368 | Class A concrete (culvert) (8196000000-E) | CY | 1,109.20 | $635.00 | $1,500.00 | $1,350.00 | $800.00 | $635.00 |
| 0369 | Reinforcing steel (culvert) (8245000000-E) | LB | 179,166 | $2.50 | $2.00 | $2.00 | $2.50 | $2.50 |
| 0370 | MSE retain wall no ** - (1) (8801000000-E) | SF | 15,200 | $100.95 | $139.00 | $150.00 | $120.00 | $125.00 |
| 0371 | MSE retain wall no ** - (2A) (8801000000-E) | SF | 3,750 | $186.16 | $139.00 | $150.00 | $175.00 | $126.00 |
| 0372 | MSE retain wall no ** - (2B) (8801000000-E) | SF | 5,300 | $186.16 | $139.00 | $150.00 | $175.00 | $130.00 |
| 0373 | MSE retain wall no ** - (3) (8801000000-E) | SF | 1,320 | $144.80 | $152.00 | $140.00 | $150.00 | $122.00 |
| 0374 | MSE retain wall no ** - (4) (8801000000-E) | SF | 260 | $103.05 | $116.00 | $140.00 | $120.00 | $100.00 |
| 0375 | FND excav B** sta ******* - (1, 27+37.26 -L-) (8091000000-N) | LS | 1 | $47,000 | $35,000 | $200,000 | $25,000 | $80,000 |
| 0376 | Reinforced concrete deck slab (8147000000-E) | SF | 15,638 | $65.00 | $65.00 | $50.00 | $55.00 | $100.00 |
| 0377 | Grooving bridge floors (8161000000-E) | SF | 16,787 | $1.10 | $0.91 | $1.00 | $1.50 | $1.00 |
| 0378 | Class A concrete (bridge) (8182000000-E) | CY | 268.10 | $1,440.00 | $1,600.00 | $1,800.00 | $1,500.00 | $3,000.00 |
| 0379 | BRG appr slab *********** - (27+37.26 -L-) (8210000000-N) | LS | 1 | $182,000 | $225,000 | $225,000 | $120,000 | $500,000 |
| 0380 | Reinforcing steel (bridge) (8217000000-E) | LB | 49,607 | $2.20 | $2.00 | $1.50 | $1.50 | $2.00 |
| 0381 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 2,666 | $3.30 | $4.00 | $3.50 | $3.50 | $6.50 |
| 0382 | 54" prestressed concrete girders (8265000000-E) | LF | 1,776.50 | $394.00 | $514.00 | $450.00 | $450.00 | $500.00 |
| 0383 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 68 | $1,770.00 | $3,000.00 | $105.00 | $220.00 | $8,000.00 |
| 0384 | HP 12 X 53 steel piles (8364000000-E) | LF | 2,580 | $88.00 | $40.00 | $72.00 | $60.00 | $100.00 |
| 0385 | 4" slope protection (8531000000-E) | SY | 53.60 | $440.00 | $125.00 | $200.00 | $250.00 | $300.00 |
| 0386 | Elastomeric bearings (8657000000-N) | LS | 1 | $110,000 | $35,000 | $65,000 | $15,000 | $100,000 |
| 0387 | Foam joint seals (8692000000-N) | LS | 1 | $72,000 | $125,000 | $70,000 | $60,000 | $350,000 |
| 0388 | Elec conduit sys signal ****** - (27+37.26 -L-) (8727000000-N) | LS | 1 | $18,000 | $17,500 | $50,000 | $50,000 | $17,150 |
| 0389 | Elec conduit sys ******** - (27+37.26 -L-) (8734000000-N) | LS | 1 | $33,000 | $31,500 | $50,000 | $100,000 | $31,025 |
| 0390 | Generic structure item (LF) - classic concrete bridge rail (8867000000-E) | LF | 324.67 | $650.00 | $450.00 | $350.00 | $400.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of November 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.