NCDOT contract C205012 bid tabulation

GRADING, DRAINAGE, PAVING, SIGNALS AND STRUCTURES. BIG MILL FARM RD FROM S OF US-421 TO SR-2649, SR-2649 FROM BIG MILL FARM RD TO NC-66, & INT OF US-421 & BIG MILL FARM RD. Let by North Carolina DOT on November 18, 2025, Forsyth. 5 bids received; low bid $59,776,710 by Apac Atlantic Inc Smith Rowe LLC JV.

Owner
North Carolina DOT
Letting
18 NOV 2025
Pay items
390
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac Atlantic Inc Smith Rowe LLC JV$59,776,710Low
2Flatiron Dragados Constructors Inc$60,626,324+1.0%
3Ames Construction Inc$65,983,121+10%
4Blythe Construction Inc$67,668,843+13%
5Webber LLC$73,771,463+23%
NCDOT contract C205012: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac Atlantic Inc Smith Rowe LLC JV2. Flatiron Dragados Constructors Inc3. Ames Construction Inc4. Blythe Construction Inc5. Webber LLC
0001Mobilization (0000100000-N)LS1$2,980,000$3,031,000$3,290,000$3,350,000$3,622,000
0002Construction surveying (0000400000-N)LS1$1,000,000$750,000$800,000$1,000,000$2,000,000
0003Clearing & grubbing (0001000000-E)LS1$5,000,000$8,373,000$2,970,000$3,500,000$16,840,000
0004Supplementary clearing & grubbing (0008000000-E)ACRE3$1.00$15,000$14,500$5,000.00$15,000
0005Sealing abandoned wells (0015000000-N)EACH1$4,281.38$4,400.00$5,000.00$12,500$3,500.00
0006Unclassified excavation (0022000000-E)CY166,600$7.71$11.00$18.00$15.00$11.80
0007Undercut excavation (0036000000-E)CY5,100$14.97$11.00$16.00$12.00$11.45
0008Borrow excavation (0106000000-E)CY423,000$0.01$0.01$13.25$14.00$0.01
0009Drainage ditch excavation (0134000000-E)CY820$19.57$12.00$9.00$15.00$16.43
0010Removal of existing asphalt pavement (0156000000-E)SY30,750$9.99$8.00$20.00$18.00$9.50
0011Breaking of existing asphalt pavement (0177000000-E)SY4,620$4.21$5.00$4.00$6.00$16.00
0012Select granular material (0195000000-E)CY3,250$0.01$46.00$80.00$20.00$74.65
0013Geotextile for soil stabilization (0196000000-E)SY5,450$3.56$3.75$4.00$5.00$3.13
0014Temporary shoring (0199000000-E)SF2,400$90.00$35.00$105.50$100.00$126.35
0015Generic grading item (LS) - type 2 bridge approach fill, station 27+37.26 -L- (0248000000-N)LS1$50,000$50,000$200,000$100,000$200,000
0016Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E)TON50$86.47$150.00$83.00$120.00$250.00
0017Foundation conditioning material, minor structures (0318000000-E)TON4,862$47.37$50.00$60.00$60.00$72.34
0018FND condit geotextile (4A) (0321000000-E)SY14,414$2.50$2.50$4.00$5.00$4.14
001915" drainage pipe (0335200000-E)LF104$120.32$175.00$80.00$80.00$87.00
002018" drainage pipe (0335300000-E)LF358$139.71$145.00$100.00$85.00$100.00
002115" side drain pipe (0343000000-E)LF420$105.78$115.00$90.00$80.00$98.00
002218" side drain pipe (0344000000-E)LF36$120.18$150.00$100.00$105.00$118.00
0023***" RCP culv class IV - (48") (0448000000-E)LF200$399.25$400.00$480.00$320.00$390.00
0024***" RCP culv class IV - (54") (0448000000-E)LF108$706.15$700.00$935.00$460.00$505.00
0025***" RCP culv class IV - (66") (0448000000-E)LF92$951.96$1,100.00$920.00$1,000.00$770.00
002615" RC pipe culverts, class IV (0448200000-E)LF11,432$105.23$95.00$125.00$95.00$112.00
002718" RC pipe culverts, class IV (0448300000-E)LF6,492$128.33$120.00$140.00$105.00$125.00
002824" RC pipe culverts, class IV (0448400000-E)LF3,992$149.03$210.00$210.00$120.00$165.00
002930" RC pipe culverts, class IV (0448500000-E)LF1,492$214.98$300.00$235.00$175.00$200.00
003036" RC pipe culverts, class IV (0448600000-E)LF224$240.97$320.00$325.00$260.00$250.00
003142" RC pipe culverts, class IV (0448700000-E)LF740$350.44$365.00$460.00$280.00$315.00
003218" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E)LF204$123.18$135.00$115.00$100.00$115.00
003324" CS pipe culverts, 0.064" thick (0594000000-E)LF192$137.19$200.00$135.00$120.00$116.00
0034**" CS elbow *****" thick - (18", 0.064") (0636000000-E)EACH6$1,309.42$530.00$1,500.00$500.00$860.00
0035**" CS elbow *****" thick - (24", 0.064") (0636000000-E)EACH2$1,402.64$830.00$1,600.00$600.00$1,100.00
0036**"WLD STL pipe grad B in soil - (20", 0.250") (0973100000-E)LF226$2,030.84$900.00$700.00$800.00$988.78
0037**"WLD STL pipe grad B in soil - (24", 0.250") (0973100000-E)LF80$2,052.97$1,000.00$815.00$800.00$999.41
0038**"WLD STL pipe grad B not in soil - (20", 0.250") (0973300000-E)LF226$1.00$0.01$1,350.00$1,700.00$1,754.29
0039**"WLD STL pipe grad B not in soil - (24", 0.250") (0973300000-E)LF80$1.00$0.01$1,725.00$1,700.00$1,764.92
0040Pipe removal (0995000000-E)LF2,451$49.92$35.00$45.00$40.00$22.00
0041Fine grading (1011000000-N)LS1$6,488,026$950,000$2,500,000$2,750,000$1,000,000
0042#57 stone (1077000000-E)TON20$95.00$150.00$85.00$60.00$200.00
0043Shallow undercut (1099500000-E)CY750$16.54$35.00$40.00$22.00$12.00
0044Class IV subgrade stabilization (1099700000-E)TON1,500$56.99$90.00$50.00$55.00$76.00
0045Geotextile for subgrade stabilization (1112000000-E)SY2,250$5.43$6.00$4.00$5.00$3.04
0046Aggregate base course (1121000000-E)TON1,475$53.06$75.00$60.00$75.00$56.00
0047Incidental stone base (1220000000-E)TON530$91.53$140.00$60.00$150.00$100.00
0048Shoulder reconstruction (1245000000-E)SMI1.15$8,400.00$9,800.00$11,000$11,000$11,000
0049Aggregate shoulder borrow (1260000000-E)TON200$27.00$45.00$50.00$75.00$55.00
0050Prime coat (1275000000-E)GAL810$6.00$7.31$7.00$5.00$6.00
0051Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY57,400$2.20$1.45$1.30$5.00$2.20
0052Mill asp PVMT *****" DTH - (4") (1297000000-E)SY6,100$8.00$5.50$4.20$10.00$8.00
0053Incidental milling (1330000000-E)SY8,060$8.00$8.00$7.00$10.00$8.00
0054Asphalt conc base course, type B25.0C (1491000000-E)TON41,990$74.00$73.40$82.00$95.00$72.00
0055Asphalt conc intermediate course, type I19.0C (1503000000-E)TON26,720$77.00$76.31$85.00$96.00$76.00
0056Asphalt conc surface course, type S9.5B (1519000000-E)TON14,850$77.00$76.54$85.00$96.00$76.00
0057Asphalt conc surface course, type S9.5C (1523000000-E)TON14,800$85.00$82.00$87.50$96.00$84.00
0058Asphalt binder for plant mix (1575000000-E)TON5,065$620.00$635.00$650.00$600.00$618.00
0059Asphalt plant mix, pavement repair (1693000000-E)TON130$552.87$250.00$90.00$241.46$200.00
0060Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E)LF17,480$0.61$1.35$1.00$3.00$0.50
0061Right-of-way markers (2000000000-N)EACH78$275.00$310.00$310.00$275.00$305.00
0062Control-of-access markers (2020000000-N)EACH51$275.00$310.00$310.00$275.00$350.00
0063Subdrain excavation (2022000000-E)CY470$21.38$35.00$15.00$35.00$26.00
0064Geotextile for subsurface drains (2026000000-E)SY2,100$4.45$6.00$4.00$12.00$2.00
0065Subdrain coarse aggregate (2036000000-E)CY353$92.91$55.00$105.00$85.00$70.00
00666" perforated subdrain pipe (2044000000-E)LF2,100$6.35$15.00$24.00$17.00$2.00
0067Subdrain pipe outlet (2070000000-N)EACH5$562.27$300.00$1,500.00$400.00$1,200.00
00686" outlet pipe (2077000000-E)LF30$66.71$50.00$135.00$40.00$165.00
0069Temporary steel plate covers for masonry drainage structure (2190000000-N)EACH11$1,984.35$2,875.13$3,000.00$3,000.00$2,000.00
0070Endwalls (2209000000-E)CY13.90$1,580.52$1,800.00$2,800.00$1,000.00$700.00
0071Reinforced endwalls (2220000000-E)CY6.30$2,349.71$2,500.00$3,650.00$2,000.00$550.00
0072Pipe collars (2253000000-E)CY1.79$6,321.29$2,000.00$2,650.00$2,500.00$2,400.00
0073Flowable fill (2275000000-E)CY129$991.84$400.00$430.00$250.00$370.00
0074Masonry drainage structures (2286000000-N)EACH272$3,928.86$4,300.00$5,000.00$5,000.00$5,000.00
0075Masonry drainage structures (2297000000-E)CY12.57$3,428.63$3,500.00$1,850.00$4,500.00$2,200.00
0076Masonry drainage structures (2308000000-E)LF169.30$713.13$750.00$500.00$500.00$450.00
0077Frame with two grates, STD 840.16 (2364000000-N)EACH44$1,663.12$1,500.00$1,500.00$1,500.00$2,000.00
0078Frame with two grates, STD 840.20 (2364200000-N)EACH12$2,524.36$1,300.00$1,500.00$1,500.00$1,900.00
0079Frame with two grates, STD 840.22 (2365000000-N)EACH29$2,912.77$1,300.00$1,500.00$1,500.00$1,850.00
0080Frame with two grates, STD 840.24 (2366000000-N)EACH8$2,912.77$1,400.00$1,500.00$1,500.00$1,850.00
0081Frame with two grates, STD 840.29 (2367000000-N)EACH2$1,326.75$1,300.00$1,500.00$1,500.00$1,860.00
0082Frame-GRT-HD 840.03 ** - (E) (2374000000-N)EACH13$1,516.11$1,600.00$1,600.00$2,000.00$2,100.00
0083Frame-GRT-HD 840.03 ** - (F) (2374000000-N)EACH84$1,522.59$1,700.00$1,600.00$2,000.00$2,200.00
0084Frame-GRT-HD 840.03 ** - (G) (2374000000-N)EACH69$1,522.59$1,700.00$1,600.00$2,000.00$2,300.00
0085Frame with cover, STD 840.54 (2396000000-N)EACH19$1,202.06$1,200.00$1,600.00$1,500.00$1,800.00
0086Steel frame with two grates, STD 840.37 (2407000000-N)EACH2$3,340.34$3,500.00$3,000.00$3,500.00$3,500.00
0087Concrete transitional section for catch basin (2440000000-N)EACH25$1,300.00$1,326.53$950.00$1,247.81$2,100.00
0088Concrete transitional section for drop inlet (2451000000-N)EACH32$1,300.00$1,326.53$950.00$1,235.21$2,000.00
0089Generic drainage item (EA) - DE-watering (2473000000-N)EACH1$3,630.00$5,000.00$30,000$10,000$150,000
0090Generic drainage item (LF) - 36" pipe rehabilitation cipp liner (2484000000-E)LF232$391.28$400.00$100.00$500.00$436.55
0091Generic drainage item (LF) - pre installation inspection (2484000000-E)LF232$37.98$80.00$25.00$100.00$50.00
0092**"X**" concrete curb - (8" X 12") (2535000000-E)LF100$68.95$75.14$61.00$51.30$39.17
00931'-6" concrete curb & gutter (2542000000-E)LF12,060$23.05$26.94$23.00$36.55$38.58
00942'-6" concrete curb & gutter (2549000000-E)LF21,910$31.85$35.92$26.00$39.07$43.10
0095Shoulder berm gutter (2556000000-E)LF1,260$41.35$46.46$40.00$54.20$45.83
0096Concrete expressway gutter (2577000000-E)LF110$76.90$82.73$56.00$60.50$64.22
0097Concrete valley gutter (2580000000-E)LF1,960$31.10$36.00$33.00$35.29$45.94
00984" concrete sidewalk (2591000000-E)SY11,660$59.00$76.15$53.00$64.28$83.90
0099Concrete curb ramps (2605000000-N)EACH48$2,750.00$2,806.12$1,500.00$3,396.82$2,679.73
01006" concrete driveway (2612000000-E)SY2,330$97.75$111.71$90.00$121.00$157.40
01014" concrete paved ditch (2619000000-E)SY80$152.95$177.83$222.00$88.23$166.33
01025" monolithic concrete islands (keyed in) (2655000000-E)SY3,330$85.05$86.79$78.00$138.65$172.02
0103Precast reinforced concrete barrier, single faced (2724000000-E)LF680$150.00$144.00$100.00$150.00$111.58
0104Adjustment of catch basins (2800000000-N)EACH3$1,964.55$3,200.00$1,800.00$1,800.00$2,781.95
0105Adjustment of drop inlets (2815000000-N)EACH1$2,590.79$3,400.00$1,800.00$1,800.00$3,900.00
0106Adjustment of manholes (2830000000-N)EACH15$2,975.68$3,800.00$1,800.00$3,600.00$4,000.00
0107Adjustment of meter boxes or valve boxes (2845000000-N)EACH28$1,021.22$1,500.00$650.00$1,000.00$4,100.00
0108Convert existing catch basin to junction box with manhole (2893000000-N)EACH2$3,594.88$6,500.00$5,000.00$1,800.00$5,400.00
0109Convert existing drop inlet to junction box (2905000000-N)EACH1$3,514.90$6,400.00$5,000.00$1,800.00$6,900.00
0110Steel beam guardrail (3030000000-E)LF5,800$30.00$30.46$30.00$30.00$30.00
0111Steel beam guardrail, shop curved (3045000000-E)LF175$30.00$30.46$30.00$30.00$30.00
0112EX length GR post ** STL - (8') (3145000000-E)EACH7,800$8.00$8.12$8.00$8.00$8.00
0113Additional guardrail posts (3150000000-N)EACH25$45.00$45.69$45.00$45.00$45.00
0114Guardrail end units, type at-1 (3195000000-N)EACH2$850.00$862.95$850.00$850.00$850.00
0115Guardrail end units, type cat-1 (3210000000-N)EACH11$900.00$913.71$900.00$900.00$900.00
0116Guardrail anchor units, type III (3215000000-N)EACH4$2,300.00$2,335.03$2,300.00$2,300.00$2,300.00
0117Guardrail end units, type TL-3 (3287000000-N)EACH12$3,100.00$3,147.21$3,100.00$3,100.00$3,100.00
0118Guardrail anchor units, type B-77 (3317000000-N)EACH8$2,600.00$2,639.59$2,600.00$2,600.00$2,600.00
0119Remove existing guardrail (3360000000-E)LF11,750$0.90$0.91$2.00$0.90$0.90
0120Temporary steel beam guardrail (3380000000-E)LF5,000$11.00$11.17$11.00$11.00$11.00
0121Woven wire fence, 47" fabric (3503000000-E)LF9,400$5.00$5.08$5.00$5.00$5.00
01224" timber fence posts, 7'-6" long (3509000000-E)EACH622$43.50$44.16$37.00$43.50$43.50
01235" timber fence posts, 8'-0" long (3515000000-E)EACH92$45.00$45.69$56.00$45.00$45.00
0124Chain link fence, 48" fabric (3536000000-E)LF2,540$13.00$13.20$13.00$13.00$13.00
0125Metal line posts for 48" chain link fence (3542000000-E)EACH212$20.00$20.30$20.00$20.00$20.00
0126Metal terminal posts for 48" chain link fence (3548000000-E)EACH21$220.00$223.35$220.00$220.00$220.00
0127Generic fencing item 866 (EA) - vinyl coated metal line posts for 48" chain link fence (3579000000-N)EACH150$26.00$26.40$26.00$26.00$26.00
0128Generic fencing item 866 (EA) - vinyl coated metal terminal posts for 48" chain link fence (3579000000-N)EACH10$300.00$304.57$300.00$300.00$300.00
0129Generic fencing item 866 (LF) - vinyl coated chain link fence fabric (48") (3580000000-E)LF1,810$15.00$15.23$15.00$15.00$15.00
0130Rip rap, class I (3628000000-E)TON725$86.70$125.00$80.00$75.00$67.52
0131Rip rap, class II (3635000000-E)TON525$89.66$145.00$80.00$80.00$81.21
0132Rip rap, class A (3642000000-E)TON40$85.39$165.00$100.00$75.00$55.98
0133Rip rap, class B (3649000000-E)TON915$87.69$150.00$75.00$75.00$100.00
0134Boulders (3651000000-E)TON50$400.00$400.00$455.00$150.00$138.03
0135Geotextile for drainage (3656000000-E)SY6,570$4.49$4.00$4.00$5.00$6.00
0136Contr furn, type ***sign - (E) (4025000000-E)SF776$18.00$18.56$18.00$18.00$18.00
0137Contr furn, type ***sign - (F) (4025000000-E)SF114$18.00$18.56$18.00$18.00$18.00
0138Reinforced concrete sign foundations (4048000000-E)CY5$950.00$979.38$950.00$950.00$950.00
0139Plain concrete sign foundations (4054000000-E)CY1$5.00$5.15$5.00$5.00$5.00
0140Overhead footing (4057000000-E)CY85$3,500.00$2,886.60$2,800.00$2,800.00$2,800.00
0141Supports, breakaway steel beam (4060000000-E)LB6,783$8.00$8.25$8.00$8.00$8.00
0142Supports, 3-LB steel U-channel (4072000000-E)LF2,069$8.00$8.25$8.00$8.00$8.00
0143Sign erection, type E (4102000000-N)EACH105$75.00$77.32$75.00$75.00$75.00
0144Sign erection, type F (4108000000-N)EACH8$125.00$128.87$125.00$125.00$125.00
0145Sign erection, type *** (ovrhd) - (A) (4109000000-N)EACH18$10.00$10.31$10.00$10.00$10.00
0146Sign erection, type *** (ovrhd) - (B) (4109000000-N)EACH16$10.00$10.31$10.00$10.00$10.00
0147Sign erection, type *** (GRD MTD) - (A) (4110000000-N)EACH11$950.00$979.38$950.00$950.00$950.00
0148Sign erection, type *** (GRD MTD) - (B) (4110000000-N)EACH2$350.00$360.83$350.00$350.00$350.00
0149Sign erection, milemarkers (4114000000-N)EACH2$75.00$77.32$75.00$75.00$75.00
0150Sign erection, overlay (overhead) (4115000000-N)EACH1$500.00$515.46$500.00$500.00$500.00
0151Support, ovrhd sign STR ***** - (30+50 -Y1-) (4130000000-N)LS1$82,000$84,536$82,000$82,000$82,000
0152Support, ovrhd sign STR ***** - (42+85 -Y1-) (4130000000-N)LS1$82,000$84,536$82,000$82,000$82,000
0153Support, ovrhd sign STR ***** - (54+50-Y1-) (4130000000-N)LS1$82,000$84,536$82,000$82,000$82,000
0154Support, ovrhd sign STR ***** - (57+57 -Y1-) (4130000000-N)LS1$82,000$84,536$82,000$82,000$82,000
0155Support, ovrhd sign STR ***** - (77+50 -Y1-) (4130000000-N)LS1$62,000$63,918$62,000$62,000$62,000
0156Support, ovrhd sign STR ***** - (80+00 -Y1-) (4130000000-N)LS1$55,000$56,701$55,000$55,000$55,000
0157Support, ovrhd sign STR ***** - (90+80 -Y1-) (4130000000-N)LS1$55,000$56,701$55,000$55,000$55,000
0158Disposal of sign system, overhead (4149000000-N)EACH1$7,500.00$7,731.96$7,500.00$7,500.00$7,500.00
0159Disposal of sign system, U-channel (4155000000-N)EACH69$2.00$2.06$2.00$2.00$2.00
0160Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N)EACH16$200.00$206.19$200.00$200.00$200.00
0161Work zone signs (stationary) (4400000000-E)SF2,716$6.05$4.09$7.00$5.84$6.43
0162High visibility stationary signs (4402000000-E)SF224$8.40$6.50$12.00$8.11$8.93
0163Work zone signs (portable) (4405000000-E)SF289$9.04$9.23$9.00$8.73$9.62
0164Work zone signs (barricade mounted) (4410000000-E)SF290$9.58$6.82$7.00$9.25$10.19
0165Work zone advance/general warning signing (4413000000-E)SF130$5.89$4.53$9.00$5.68$6.26
0166Flashing arrow board (4415000000-N)EACH4$4,500.00$2,019.90$5,275.00$2,170.53$2,389.91
0167Portable changeable message sign (4420000000-N)EACH4$10,000$9,717.35$18,250$7,028.38$7,738.75
0168Drums (4430000000-N)EACH343$95.00$55.68$45.00$42.89$47.23
0169High visibility drums (4432000000-N)EACH154$100.00$60.00$68.00$54.78$60.32
0170Sequential flashing warning lights (4434000000-N)EACH39$144.45$147.40$95.00$139.53$153.64
0171Barricades (type III) (4445000000-E)LF624$21.40$16.38$22.00$20.67$22.76
0172Pedestrian channelizing devices (4447000000-E)LF24$42.80$34.94$75.00$41.34$45.52
0173Flagger (4455000000-N)DAY660$410.00$1,200.00$85.00$400.00$700.00
0174Temporary traffic control (4457000000-N)LS1$173,000$25,000$150,000$350,000$170,708
0175Temporary crash cushions (4465000000-N)EACH8$7,896.15$11,803$8,800.00$11,610$4,893.62
0176Remove & reset temporary crash cushion (4470000000-N)EACH4$2,516.46$3,335.64$3,400.00$3,281.03$2,389.91
0177TMA (4480000000-N)EACH4$10,000$27,296$4,000.00$55,814$3,072.74
0178Portable concrete barrier (4485000000-E)LF8,931$39.84$46.45$50.00$45.69$32.15
0179Portable concrete barrier (anchored) (4490000000-E)LF7,965$57.28$70.45$80.00$69.30$58.68
0180Law enforcement (4510000000-N)HR80$125.00$85.00$60.00$65.00$150.00
0181Generic traffic control item (LS) - dynamic zipper merge system deployment (4589000000-N)LS1$9,630.00$9,280.61$12,000$9,302.27$10,242
0182Generic traffic control item (EA) - connected lane closure system (4600000000-N)EACH1$856.00$2,292.86$1,000.00$826.87$910.44
0183Generic traffic control item (EA) - dynamic zipper merge system relocation (4600000000-N)EACH1$2,675.00$2,565.82$5,000.00$2,583.96$2,845.13
0184Generic traffic control item (day) - dynamic zipper merge system (4609000000-N)DAY14$1,819.00$2,074.49$2,200.00$1,757.10$1,934.69
0185Temporary raised pavement markers (4650000000-N)EACH539$8.00$5.38$8.00$5.30$8.00
0186Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF63,133$0.51$0.50$0.50$0.49$0.51
0187Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E)LF38,638$0.80$0.70$0.80$0.69$0.80
0188Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E)LF12,932$2.25$2.54$2.30$2.50$2.25
0189Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E)LF2,775$3.75$5.23$3.80$5.15$3.75
0190Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF89$15.75$11.17$15.70$11.00$15.75
0191Thermoplastic pavement marking character (90 mils) (4720000000-E)EACH8$125.00$226.40$125.00$223.00$125.00
0192Thermoplastic pavement marking symbol (90 mils) (4725000000-E)EACH168$175.00$147.21$175.00$145.00$175.00
0193Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E)EACH101$295.00$200.00$295.00$197.00$295.00
01944" cold appl plstic lines type ** - (II) (4770000000-E)LF777$8.00$8.68$8.00$8.55$8.00
0195Cold appl plastic sym type ** - (II) (4805000000-N)EACH1$725.00$1,421.32$725.00$1,400.00$725.00
0196Paint pavement marking lines (4") (4810000000-E)LF130,266$0.15$0.36$0.20$0.35$0.15
0197Paint pavement marking lines (6") (4815000000-E)LF105,454$0.20$0.37$0.20$0.36$0.20
0198Paint pavement marking lines (8") (4820000000-E)LF7,131$0.60$0.44$0.60$0.43$0.60
0199Paint pavement marking lines (12") (4825000000-E)LF1,757$0.95$1.98$1.00$1.95$0.95
0200Paint pavement marking lines (24") (4835000000-E)LF999$3.50$3.91$3.50$3.85$3.50
0201Paint pavement marking character (4840000000-N)EACH6$35.00$84.26$35.00$83.00$35.00
0202Paint pavement marking symbol (4845000000-N)EACH127$35.00$89.34$35.00$88.00$35.00
0203Removal of pavement marking lines (4") (4850000000-E)LF24,048$0.45$0.30$0.50$0.30$0.45
0204Removal of pavement marking lines (6") (4855000000-E)LF28,242$0.55$0.30$0.60$0.30$0.55
0205Removal of pavement marking lines (8") (4860000000-E)LF685$2.00$1.42$2.00$1.40$2.00
0206Removal of pavement marking lines (12") (4865000000-E)LF331$2.75$1.98$2.75$1.95$2.75
0207Removal of pavement marking lines (24") (4870000000-E)LF179$5.50$2.74$5.50$2.70$5.50
0208Removal of pavement marking symbols & characters (4875000000-N)EACH23$60.00$42.64$60.00$42.00$60.00
0209Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E)LF18$15.75$62.94$15.75$62.00$15.75
0210Permanent raised pavement markers (4900000000-N)EACH980$8.00$6.19$8.00$6.10$8.00
021180' high mount standard (5005000000-E)EACH2$36,000$36,456$40,000$55,886$36,000
0212100' high mount standard (5010000000-E)EACH2$39,500$40,000$45,000$65,095$39,500
0213120' high mount standard (5015000000-E)EACH2$47,000$47,595$50,000$74,081$47,000
0214Portable drive unit (5020000000-N)EACH1$8,000.00$8,101.27$8,000.00$12,215$8,000.00
0215High mount foundations (5025000000-E)CY42$1,325.00$1,341.77$1,325.00$2,506.00$1,325.00
0216HM luminaire ************ - (335W LED) (5030000000-N)EACH16$1,650.00$1,670.89$1,650.00$2,180.00$1,650.00
0217HM luminaire ************ - (560W LED) (5030000000-N)EACH28$2,400.00$2,430.38$2,400.00$2,349.00$2,400.00
0218Service pole ************ - (30' class 4) (5120000000-N)EACH1$1,050.00$1,063.29$1,050.00$4,367.00$1,050.00
0219Service lateral ********* - (3 #1/0 use) (5125000000-E)LF70$37.00$37.47$37.00$54.00$37.00
0220Lite CNTRL RW************ - (240/480 V) (5145000000-N)EACH1$23,000$23,291$23,000$29,883$23,000
0221Elect duct **, size ***** - (TL, 3") (5150000000-E)LF80$32.00$32.41$32.00$33.00$32.00
0222Elect duct **, size ***** - (TL, 4") (5150000000-E)LF80$38.00$38.48$38.00$42.00$38.00
0223Elect duct BD, size ***** - (2") (5155000000-E)LF340$12.00$12.15$12.00$16.00$12.00
0224Elect duct BD, size ***** - (3") (5155000000-E)LF135$13.00$13.16$13.00$19.00$13.00
0225**-#6 W/G feeder circuit - (2) (5175000000-E)LF880$6.60$6.68$6.60$17.00$6.60
0226**-#8 W/G feedr N *****" - (2, 1-1/2") (5205000000-E)LF179$13.50$13.67$13.50$18.00$13.50
0227**-#6 W/G feedr N *****" - (2, 1-1/2") (5210000000-E)LF5,450$14.25$14.43$14.25$15.00$14.25
0228Elec JB ************ - (CS36) (5240000000-N)EACH1$2,495.00$2,526.58$2,495.00$2,200.00$2,495.00
0229Elec JB ************ - (HM18) (5240000000-N)EACH6$1,140.00$1,154.43$1,140.00$1,100.00$1,140.00
0230Elec JB ************ - (IG18) (5240000000-N)EACH4$1,140.00$1,154.43$1,140.00$1,100.00$1,140.00
0231Elec JB ************ - (IG36) (5240000000-N)EACH2$2,495.00$2,526.58$2,495.00$2,200.00$2,495.00
0232Portable lighting (5255000000-N)LS1$69,717$35,000$300,000$45,033$75,000
02336" water line (5325600000-E)LF1,664$178.66$142.86$150.00$125.00$125.00
02348" water line (5325800000-E)LF2,143$119.41$153.06$160.00$155.00$155.00
023512" water line (5326200000-E)LF5,319$158.48$183.67$230.00$205.00$205.00
0236DI H2O pipe fittings (5329000000-E)LB19,651$16.37$14.29$16.00$16.00$16.00
02376" valve (5540000000-E)EACH23$3,571.18$3,163.27$6,200.00$3,650.00$3,650.00
02388" valve (5546000000-E)EACH6$5,168.41$4,285.72$8,000.00$4,850.00$4,850.00
023912" valve (5558000000-E)EACH15$7,649.48$7,346.94$8,200.00$7,150.00$7,150.00
0240**" insertion valve - (8") (5562000000-E)EACH1$23,646$15,306$22,500$22,250$22,250
02416" tapping sleeve & valve (5571600000-E)EACH1$15,622$9,183.67$1,200.00$15,755$15,755
02422" air release valve (5589200000-E)EACH2$8,840.38$16,327$10,500$10,740$10,740
0243**" water meter - (5/8") (5643000000-E)EACH2$3,490.45$1,020.41$5,500.00$2,600.00$2,600.00
0244Relocate water meter (5648000000-N)EACH28$3,057.56$1,632.65$4,500.00$2,900.00$2,900.00
0245Reconnect water meter (5649000000-N)EACH20$2,484.64$1,377.55$4,500.00$2,690.00$2,690.00
0246Fire hydrant (5666000000-N)EACH12$9,164.61$9,183.67$10,000$8,750.00$8,750.00
0247Fire hydrant leg (5673000000-E)LF155$177.20$137.76$300.00$215.00$215.00
02486" line stop (5678400000-E)EACH1$17,190$8,877.55$8,100.00$16,750$16,750
0249Water service line (<2") (5686500000-E)LF2,125$71.77$102.04$110.00$135.00$135.00
02508" sanitary gravity sewer (5691300000-E)LF3,285$187.88$234.69$125.00$265.00$265.00
025112" sanitary gravity sewer (5691500000-E)LF1,866$204.95$295.92$135.00$420.00$420.00
025224" sanitary gravity sewer (5691900000-E)LF203$842.95$581.63$630.00$960.00$960.00
0253Sanitary sewer clean-out (5768000000-N)EACH16$2,684.46$4,897.96$1,550.00$4,695.00$4,695.00
0254Sewer service line (5768500000-E)LF700$176.51$132.65$40.00$265.00$265.00
02554' dia utility manhole (5775000000-E)EACH23$9,982.62$9,387.76$9,000.00$7,850.00$7,850.00
02565' dia utility manhole (5776000000-E)EACH9$16,552$14,286$12,000$11,000$11,000
0257Utility manhole wall 4' dia (5781000000-E)LF121$753.78$1,000.00$750.00$985.00$985.00
0258Utility manhole wall 5' dia (5782000000-E)LF91$753.78$1,326.53$875.00$1,350.00$1,350.00
0259Abandon **" utility pipe - (4") (5798000000-E)LF87$60.52$10.20$15.00$90.00$90.00
0260Abandon 6" utility pipe (5800000000-E)LF1,148$24.69$14.29$15.00$18.00$18.00
0261Abandon 8" utility pipe (5801000000-E)LF4,421$28.37$16.33$15.00$20.00$20.00
0262Abandon 12" utility pipe (5804000000-E)LF6,857$23.77$16.33$15.00$22.00$22.00
0263Abandon 24" utility pipe (5813000000-E)LF148$87.39$51.02$15.00$95.00$95.00
0264Remove fire hydrant (5815500000-N)EACH8$1,749.01$2,040.82$1,400.00$2,800.00$2,800.00
0265Remove utility manhole (5828000000-N)EACH27$2,237.78$2,040.82$2,100.00$4,200.00$4,200.00
0266**" encasement pipe - (48") (5835000000-E)LF95$398.62$1,224.49$1,100.00$950.00$950.00
026716" encasement pipe (5835700000-E)LF495$222.28$265.31$300.00$195.00$195.00
026820" encasement pipe (5835900000-E)LF906$246.01$346.94$415.00$220.00$220.00
026924" encasement pipe (5836000000-E)LF269$296.71$443.88$375.00$335.00$335.00
0270Bore & jack **" - (16") (5872500000-E)LF263$1,591.53$0.01$525.00$550.00$550.00
0271Bore & jack **" - (20") (5872500000-E)LF384$1,623.55$0.01$725.00$735.00$735.00
0272Bore & jack **" - (24") (5872500000-E)LF218$1,698.04$0.01$800.00$820.00$820.00
0273Bore & jack **" - (48") (5872500000-E)LF42$4,211.22$3,316.33$3,500.00$3,700.00$3,700.00
0274Generic utility item (EA) - concrete support pier (5882000000-N)EACH2$9,643.77$8,163.27$16,500$4,500.00$4,500.00
0275Generic utility item (EA) - thrust collar (5882000000-N)EACH18$7,851.59$4,285.71$6,000.00$1,200.00$1,200.00
0276Temporary silt fence (6000000000-E)LF48,725$2.02$2.05$2.60$2.02$2.60
0277Stone for erosion control, class A (6006000000-E)TON2,460$84.45$63.00$65.00$75.00$52.32
0278Stone for erosion control, class B (6009000000-E)TON6,460$0.01$130.00$65.00$75.00$53.97
0279Sediment control stone (6012000000-E)TON6,280$0.01$90.00$55.00$65.00$43.77
0280Temporary mulching (6015000000-E)ACRE22$985.00$1,000.00$1,600.00$985.00$1,600.00
0281Seed for temporary seeding (6018000000-E)LB1,100$1.00$1.02$2.00$1.00$2.00
0282Fertilizer for temporary seeding (6021000000-E)TON6$900.00$913.71$825.00$900.00$825.00
0283Temporary slope drains (6024000000-E)LF4,225$23.27$11.00$56.59$20.00$22.50
0284Safety fence (6029000000-E)LF680$2.00$2.03$2.50$2.00$10.00
0285Silt excavation (6030000000-E)CY23,830$0.01$0.01$12.25$15.00$3.45
0286Matting for erosion control (6036000000-E)SY71,000$1.35$1.37$1.45$1.35$1.45
0287Coir fiber mat (6037000000-E)SY205$18.00$18.27$6.00$18.00$6.00
02881/4" hardware cloth (6042000000-E)LF12,870$3.75$3.81$3.75$3.75$3.75
0289Low permeability geotextile (6043000000-E)SY1,200$11.23$4.00$6.00$6.50$6.00
0290**" temporary pipe - (36") (6045000000-E)LF145$125.00$200.00$325.00$125.00$125.00
0291**" temporary pipe - (48") (6045000000-E)LF224$175.00$210.00$450.00$175.00$175.00
0292Special stilling basins (6070000000-N)EACH4$500.00$1,108.63$15,000$500.00$3,000.00
0293Flocculant (6071002000-E)LB2,620$1.00$1.02$2.00$1.00$9.00
0294Coir fiber wattle (6071012000-E)LF6,960$9.00$9.14$9.00$9.00$9.00
0295Coir fiber wattle barrier (6071014000-E)LF260$10.00$10.15$32.00$10.00$32.00
0296Coir fiber baffle (6071030000-E)LF3,865$6.50$6.60$7.00$6.50$7.00
0297**" skimmer - (1-1/2") (6071050000-E)EACH10$1,464.50$1,500.00$6,000.00$750.00$1,150.00
0298**" skimmer - (2") (6071050000-E)EACH6$1,634.37$1,900.00$7,000.00$850.00$1,300.00
0299**" skimmer - (2-1/2") (6071050000-E)EACH1$1,870.98$2,200.00$8,000.00$950.00$3,625.00
0300Seeding and mulching (6084000000-E)ACRE39$2,525.00$2,563.45$2,450.00$2,525.00$2,450.00
0301Mowing (6087000000-E)ACRE36$150.00$152.28$175.00$150.00$175.00
0302Seed for repair seeding (6090000000-E)LB200$3.00$3.05$4.25$3.00$4.25
0303Fertilizer for repair seeding (6093000000-E)TON2$800.00$812.19$1,250.00$800.00$1,250.00
0304Seed for supplemental seeding (6096000000-E)LB900$3.00$3.05$4.25$3.00$4.25
0305Fertilizer topdressing (6108000000-E)TON27$925.00$939.09$800.00$925.00$800.00
0306Impervious dike (6111000000-E)LF268$85.00$175.00$225.00$100.00$165.00
0307Specialized hand mowing (6114500000-N)MHR60$100.00$101.52$110.00$100.00$400.00
0308Manual litter removal (6114800000-N)MHR20$124.04$120.00$110.00$120.00$160.00
0309Litter disposal (6114900000-E)TON3$383.21$250.00$200.00$200.00$1,100.00
0310Response for erosion control (6117000000-N)EACH100$1.00$1.02$100.00$1.00$100.00
0311Concrete washout structure (6117500000-N)EACH2$1,650.00$1,500.00$5,000.00$3,500.00$4,000.00
0312Culvert diversion channel (6120000000-E)CY338$30.00$18.00$100.00$200.00$100.00
0313Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH12$330.00$1,500.00$4,025.00$600.00$2,500.00
0314Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E)SY40$5.00$15.00$4.00$4.50$4.00
0315Pedestrian signal head (16", 1 section W/countdown) (7048500000-E)EACH18$1,600.00$1,620.25$1,600.00$1,834.00$1,600.00
0316Signal cable (7060000000-E)LF8,600$5.00$5.06$5.00$7.00$5.00
0317Vehicle signal head (12", 3 section) (7120000000-E)EACH22$1,300.00$1,316.46$1,300.00$1,515.00$1,300.00
0318Vehicle signal head (12", 4 section) (7132000000-E)EACH9$1,700.00$1,721.52$1,700.00$1,737.00$1,700.00
0319Messenger cable (3/8") (7264000000-E)LF1,600$8.50$8.61$8.50$15.00$8.50
0320Tracer wire (7279000000-E)LF8,300$1.25$1.27$1.25$2.00$1.25
0321Paved trench (***********) - (2, 2") (7288000000-E)LF25$33.00$33.42$33.00$45.00$33.00
0322Unpaved trench (***********) - (2, 2") (7300000000-E)LF4,020$16.00$16.20$16.00$18.00$16.00
0323Direct drill (***********) - (2, 2") (7301000000-E)LF6,830$33.00$33.42$33.00$47.00$33.00
0324Junction box (***************) - (special oversized, heavy-duty) (7312000000-N)EACH6$1,450.00$1,468.36$1,450.00$4,782.00$1,450.00
0325Junction box (standard size) (7324000000-N)EACH21$740.00$749.37$740.00$908.00$740.00
0326Junction box (over-sized, heavy duty) (7348000000-N)EACH25$1,150.00$1,164.56$1,150.00$1,700.00$1,150.00
0327Inductive loop sawcut (7444000000-E)LF3,125$18.50$18.73$18.50$29.00$18.50
0328Lead-in cable (14-2) (7456100000-E)LF10,600$2.65$2.68$2.65$3.00$2.65
0329Site survey (7481000000-N)EACH4$800.00$810.13$800.00$1,474.00$800.00
0330Luminaire arm for video system (7481200000-N)EACH7$1,200.00$1,215.19$1,200.00$1,083.00$1,200.00
0331Camera without internal loop emulator processing unit (7481240000-N)EACH7$2,500.00$2,531.65$2,500.00$3,385.00$2,500.00
0332External loop emulator processing unit (7481260000-N)EACH7$3,000.00$3,037.97$3,000.00$16,067$3,000.00
0333Communications cable (** fiber) - (12) (7516000000-E)LF3,860$1.80$1.82$1.80$5.00$1.80
0334Communications cable (** fiber) - (144) (7516000000-E)LF5,510$5.00$5.06$5.00$6.00$5.00
0335Drop cable (7528000000-E)LF90$3.70$3.75$3.70$5.00$3.70
0336Splice enclosure (7540000000-N)EACH3$3,775.00$2,810.13$3,775.00$7,362.00$3,775.00
0337Interconnect center (7552000000-N)EACH4$7,300.00$7,392.41$7,300.00$2,941.00$7,300.00
0338Delineator marker (7566000000-N)EACH20$125.00$126.58$125.00$184.00$125.00
0339Remove existing communications cable (7575160000-E)LF5,120$1.25$1.27$1.25$2.00$1.25
0340Metal strain signal pole (7576000000-N)EACH12$19,800$20,051$19,800$25,000$19,800
0341Soil test (7613000000-N)EACH13$1,775.00$1,797.47$1,775.00$2,012.00$1,775.00
0342Drilled pier foundation (7614100000-E)CY78$1,310.00$1,326.58$1,310.00$2,506.00$1,310.00
0343Sign for signals (7636000000-N)EACH8$720.00$729.11$720.00$857.00$720.00
0344Type II pedestal with foundation (7642200000-N)EACH16$3,785.00$3,832.91$3,785.00$4,158.00$3,785.00
0345Signal cabinet foundation (7684000000-N)EACH3$1,770.00$1,792.41$1,770.00$3,414.00$1,770.00
0346Conduit entrance into existing foundation (7686000000-N)EACH1$875.00$886.08$875.00$1,046.00$875.00
0347Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N)EACH3$25,700$26,025$25,700$33,000$25,700
0348Detector card (***********) - (type 170) (7708000000-N)EACH20$240.00$243.04$240.00$253.00$240.00
0349Cabinet base extender (7901000000-N)EACH3$845.00$855.70$845.00$847.00$845.00
0350Generic signal item (EA) - 2070LX controller (7980000000-N)EACH1$4,750.00$4,810.13$4,750.00$5,888.00$4,750.00
0351Generic signal item (EA) - 5/8" X 10' grounding electrode (7980000000-N)EACH4$230.00$232.91$230.00$540.00$230.00
0352Generic signal item (EA) - CCTV metal pole (7980000000-N)EACH1$8,850.00$8,962.03$8,850.00$20,064$8,850.00
0353Generic signal item (EA) - digital CCTV camera assembly (7980000000-N)EACH1$7,000.00$7,088.61$7,000.00$6,926.00$7,000.00
0354Generic signal item (EA) - equipment cabinet disconnect (7980000000-N)EACH1$1,175.00$1,189.87$1,175.00$2,002.00$1,175.00
0355Generic signal item (EA) - ethernet edge switch (7980000000-N)EACH1$2,050.00$2,075.95$2,050.00$1,909.00$2,050.00
0356Generic signal item (EA) - field equipment cabinet (7980000000-N)EACH1$5,875.00$5,949.37$5,875.00$15,000$5,875.00
0357Generic signal item (EA) - meter base/disconnect combination panel (7980000000-N)EACH1$1,175.00$1,189.87$1,175.00$2,002.00$1,175.00
0358Generic signal item (EA) - protective coating for strain pole (black) (7980000000-N)EACH12$900.00$911.39$900.00$1,600.00$900.00
0359Generic signal item (EA) - protective coating for type II signal pedestal (black) (7980000000-N)EACH14$120.00$121.52$120.00$168.00$120.00
0360Generic signal item (LF) - #4 solid bare grounding conductor (7990000000-E)LF40$8.50$8.61$8.50$21.00$8.50
0361Generic signal item (LF) - 3-wire copper feeder conductors (7990000000-E)LF200$11.75$11.90$11.75$7.00$11.75
0362Generic signal item (LF) - 3-wire copper service entrance conductors (7990000000-E)LF30$9.25$9.37$11.75$7.00$9.25
0363Remv exist STR ****** culv (402) - (90+93.82 -L-) (8056000000-N)LS1$35,000$50,000$40,000$46,082$35,000
0364Box culv excav @ ******** - (22+76.41 -L-) (8130000000-N)LS1$75,000$150,000$400,000$100,000$75,000
0365Box culv excav @ ******** - (58+35.89 -Y1-) (8130000000-N)LS1$30,000$40,000$50,000$50,000$30,000
0366Box culv excav @ ******** - (90+93.82 -L-) (8130000000-N)LS1$80,000$75,000$250,000$100,000$80,000
0367Foundation conditioning material, box culvert (8133000000-E)TON685$85.00$100.00$130.00$85.00$85.00
0368Class A concrete (culvert) (8196000000-E)CY1,109.20$635.00$1,500.00$1,350.00$800.00$635.00
0369Reinforcing steel (culvert) (8245000000-E)LB179,166$2.50$2.00$2.00$2.50$2.50
0370MSE retain wall no ** - (1) (8801000000-E)SF15,200$100.95$139.00$150.00$120.00$125.00
0371MSE retain wall no ** - (2A) (8801000000-E)SF3,750$186.16$139.00$150.00$175.00$126.00
0372MSE retain wall no ** - (2B) (8801000000-E)SF5,300$186.16$139.00$150.00$175.00$130.00
0373MSE retain wall no ** - (3) (8801000000-E)SF1,320$144.80$152.00$140.00$150.00$122.00
0374MSE retain wall no ** - (4) (8801000000-E)SF260$103.05$116.00$140.00$120.00$100.00
0375FND excav B** sta ******* - (1, 27+37.26 -L-) (8091000000-N)LS1$47,000$35,000$200,000$25,000$80,000
0376Reinforced concrete deck slab (8147000000-E)SF15,638$65.00$65.00$50.00$55.00$100.00
0377Grooving bridge floors (8161000000-E)SF16,787$1.10$0.91$1.00$1.50$1.00
0378Class A concrete (bridge) (8182000000-E)CY268.10$1,440.00$1,600.00$1,800.00$1,500.00$3,000.00
0379BRG appr slab *********** - (27+37.26 -L-) (8210000000-N)LS1$182,000$225,000$225,000$120,000$500,000
0380Reinforcing steel (bridge) (8217000000-E)LB49,607$2.20$2.00$1.50$1.50$2.00
0381Spiral column reinforcing steel (bridge) (8238000000-E)LB2,666$3.30$4.00$3.50$3.50$6.50
038254" prestressed concrete girders (8265000000-E)LF1,776.50$394.00$514.00$450.00$450.00$500.00
0383Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E)EACH68$1,770.00$3,000.00$105.00$220.00$8,000.00
0384HP 12 X 53 steel piles (8364000000-E)LF2,580$88.00$40.00$72.00$60.00$100.00
03854" slope protection (8531000000-E)SY53.60$440.00$125.00$200.00$250.00$300.00
0386Elastomeric bearings (8657000000-N)LS1$110,000$35,000$65,000$15,000$100,000
0387Foam joint seals (8692000000-N)LS1$72,000$125,000$70,000$60,000$350,000
0388Elec conduit sys signal ****** - (27+37.26 -L-) (8727000000-N)LS1$18,000$17,500$50,000$50,000$17,150
0389Elec conduit sys ******** - (27+37.26 -L-) (8734000000-N)LS1$33,000$31,500$50,000$100,000$31,025
0390Generic structure item (LF) - classic concrete bridge rail (8867000000-E)LF324.67$650.00$450.00$350.00$400.00$500.00
NCDOT contract C205012: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of November 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy