Webber LLC: NCDOT bid record
Webber LLC submitted 22 bids on North Carolina DOT contracts in the data, from 20 MAY 2014 to 19 MAY 2026, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $544,692,506
- Latest bid
- 19 MAY 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2014 | 2 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2022 | 4 | 1 | 25% |
| 2023 | 4 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 5 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Forsyth | 6 | 1 | 17% |
| Robeson | 3 | 1 | 33% |
| Haywood | 2 | 0 | 0% |
| Buncombe | 1 | 0 | 0% |
| Iredell, Catawba | 1 | 0 | 0% |
| New Hanover, Pender | 1 | 0 | 0% |
| Davie | 1 | 0 | 0% |
| Madison | 1 | 0 | 0% |
| Gaston, Mecklenburg | 1 | 0 | 0% |
| Davidson | 1 | 0 | 0% |
| Warren, Vance | 1 | 0 | 0% |
| Cleveland | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Grooving bridge floors | 8161000000-E | SF | 20 | 18 (90%) | $0.46 | $0.80 |
| Temporary raised pavement markers | 4650000000-N | EACH | 21 | 16 (76%) | $7.00 | $9.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 20 | 15 (75%) | $43.38 | $50.00 |
| Fertilizer for temporary seeding | 6021000000-E | TON | 21 | 14 (67%) | $926.25 | $1,000.00 |
| Fertilizer topdressing | 6108000000-E | TON | 20 | 14 (70%) | $962.50 | $1,000.00 |
| Supports, 3-LB steel U-channel | 4072000000-E | LF | 20 | 14 (70%) | $10.00 | $7.00 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 19 | 14 (74%) | $3.00 | $3.50 |
| Paint pavement marking character | 4840000000-N | EACH | 18 | 14 (78%) | $44.88 | $50.00 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 16 | 14 (88%) | $3.00 | $3.05 |
| Sign erection, type F | 4108000000-N | EACH | 20 | 13 (65%) | $157.91 | $125.00 |
| Portable concrete barrier | 4485000000-E | LF | 20 | 13 (65%) | $39.79 | $36.00 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 19 | 13 (68%) | $171.38 | $135.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Zachry Construction Corporation | 8 | 6 of 8 |
| Branch Civil Inc | 7 | 5 of 7 |
| Blythe Construction Inc | 7 | 5 of 7 |
| Balfour Beatty Infrastructure Inc | 7 | 3 of 7 |
| Vecellio & Grogan Inc | 6 | 4 of 6 |
| Flatiron Constructors Inc | 6 | 2 of 6 |
| The Lane Construction Corp | 5 | 4 of 5 |
| Apac Atlantic Inc Smith Rowe LLC JV | 4 | 3 of 4 |
| Flatiron Dragados Constructors Inc | 4 | 3 of 4 |
| Ames Construction Inc | 4 | 3 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 MAY 2026 | C204773 | Gaston, Mecklenburg | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. INTERSECTIONS OF NC-7 AND SR-2083 AT US-74, B | 5 of 10 | $81,914,690 | +5.0% |
| 16 DEC 2025 | C205120 | Madison | PAVEMENT REHABILITATION. I-26 FROM TENNESSEE STATE LINE MILE MARKER 0.10 TO MILE MARKER 8.45 | 2 of 4 | $26,736,634 | +5.0% |
| 18 NOV 2025 | C205012 | Forsyth | GRADING, DRAINAGE, PAVING, SIGNALS AND STRUCTURES. BIG MILL FARM RD FROM S OF US-421 TO SR-2649, SR-2649 FROM BIG MILL FARM RD TO NC-66, & I | 5 of 5 | $73,771,463 | +23% |
| 21 OCT 2025 | C205093 | Davie | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40 | 10 of 10 | $47,250,000 | +47% |
| 19 AUG 2025 | C204975 | Forsyth | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. I-40/US-311 AT NC-109 INTERCHANGE | 3 of 3 | $46,960,479 | +21% |
| 15 JUL 2025 | C205072 | New Hanover, Pender | GRADING, DRAINAGE, PAVING, AND STRUCTURES. US-17 (HAMPSTEAD BYPASS) FROM US-17 BYPASS SOUTH OF HAMPSTEAD TO NC-210 | 7 of 7 | $232,738,441 | +28% |
| 15 OCT 2024 | C204348 | Iredell, Catawba | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-150 FROM SR-1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US-21 IN IREDELL COUNTY | 3 of 5 | $249,780,210 | 0.0% |
| 16 JUL 2024 | C204878 | Buncombe | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. I-40 FROM EAST OF SR-1224 TO PAVEMENT JOINT WEST OF SR-3412, AND I-26, I-40 AT I-40/US 1 | 3 of 3 | $114,362,202 | +8.0% |
| 28 MAY 2024 | C204913 | Forsyth | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. US-158 FROM MULTI-LANES NORTH OF US-421/I-40 BUSINESS TO SR-1965 (BELEWS CREEK ROAD) | 5 of 5 | $106,543,753 | +21% |
| 19 DEC 2023 | C204684 | Haywood | Grading, drainage, paving, and structure., grading, drainage, paving, and structures. BRIDGES #155 AND 158 OVER RICHLAND CREEK ON US-23/74 A | 4 of 4 | $52,153,258 | +22% |
| 19 DEC 2023 | C204823 | Haywood | Grading, drainage, paving, signals, and structure. US-276 (RUSS AVE) FROM US-23/74 TO US-23 BUS (MAIN ST) IN WAYNESVILLE. | 4 of 4 | $60,559,895 | +41% |
| 18 JUL 2023 | C204851 | Cleveland | Grading, drainage, paving, and structure., grading, drainage, paving, signing, and structures. US-74 SHELBY BYPASS FROM EAST OF NC-150 TO WE | 3 of 4 | $184,999,954 | +11% |
| 21 FEB 2023 | C204772 | Robeson | Grading, drainage, paving, and structure. US-74 AT NC-72 AND NC-130. | 9 of 10 | $35,133,706 | +43% |
| 18 OCT 2022 | C204746 | Forsyth | Grading, drainage, paving, and structures. FUTURE I-74 (WINSTON-SALEM NORTHERN BELTWAY) FROM US-311 TO I-40. | 2 of 7 | $127,894,274 | +1.0% |
| 20 SEP 2022 | C204727 | Robeson | Grading, drainage, paving, retaining walls, and structures. I-95 FROM SOUTH OF US-301 TO SOUTH OF NC-20. | 2 of 2 | $281,337,565 | +14% |
| 19 JUL 2022 | C204728 | Robeson | Grading, drainage, paving, retaining walls, and structures. I-95 FROM SOUTH OF NC-20 TO SOUTH OF PROPOSED I-295. | 1 of 3 | $282,928,483 | Low, 0.0% under the second |
| 21 JUN 2022 | C204110 | Cumberland | Grading, drainage, paving, signing, signals, and structures. FAYETTEVILLE OUTER LOOP FROM SOUTH OF SR-1003 (CAMDEN ROAD) TO SOUTH OF US-401. | 5 of 6 | $171,495,500 | +13% |
| 21 DEC 2021 | C204633 | Forsyth | Grading, drainage, paving, and structure. FUTURE I-74 (WINSTON-SALEM NORTHERN BELTWAY) FROM I-40 TO I-40 BUS/US 421. | 1 of 3 | $261,764,022 | Low, 4.0% under the second |
| 19 OCT 2021 | C204399 | Davidson | Grading, drainage, paving, and structure. US-29/70 & I-85 BUSINESS AT SR-1798 (OLD GREENSBORO ROAD). | 11 of 12 | $31,764,648 | +23% |
| 17 MAR 2015 | C203646 | Warren, Vance | Grading, drainage, paving, and structures. I-85 FROM NORTH OF SR-1162 (DABNEY DR) IN VANCE COUNTY TO VIRGINIA STATE LINE. | 2 of 7 | $141,679,737 | +3.0% |
| 21 OCT 2014 | C203484 | Forsyth | Grading, drainage, paving, signing, signals, its, and strs. WINSTON-SALEM NORTHERN BELTWAY (EASTERN SECTION) FROM US-158 TO I-40 BUS/US-421. | 4 of 10 | $158,424,176 | +3.0% |
| 20 MAY 2014 | C203546 | Ashe | Design build. 6 BRIDGES IN ASHE COUNTY. | 2 of 10 | $4,768,801 | +5.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.