Flatiron Constructors Inc submitted 55 bids on North Carolina DOT contracts in the data, from 19 FEB 2013 to 15 OCT 2024, and was the low bidder on 10 of them (18%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $603,301,450
- Latest bid
- 15 OCT 2024
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 6 | 1 | 17% |
| 2014 | 4 | 0 | 0% |
| 2015 | 4 | 1 | 25% |
| 2016 | 2 | 0 | 0% |
| 2017 | 9 | 2 | 22% |
| 2018 | 3 | 1 | 33% |
| 2019 | 4 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2021 | 9 | 2 | 22% |
| 2022 | 8 | 2 | 25% |
| 2023 | 2 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Forsyth | 5 | 2 | 40% |
| Johnston | 4 | 2 | 50% |
| Dare | 4 | 0 | 0% |
| Carteret | 3 | 0 | 0% |
| Davidson | 3 | 0 | 0% |
| Wake | 3 | 1 | 33% |
| Craven | 2 | 0 | 0% |
| Alamance | 2 | 0 | 0% |
| Mecklenburg | 2 | 0 | 0% |
| Cumberland | 2 | 0 | 0% |
| Cabarrus | 2 | 0 | 0% |
| Cleveland | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Incidental milling | 1330000000-E | SY | 44 | 19 (43%) | $8.70 | $12.00 |
| Barricades (type III) | 4445000000-E | LF | 49 | 16 (33%) | $24.00 | $24.30 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 49 | 16 (33%) | $7.00 | $7.50 |
| Drums | 4430000000-N | EACH | 48 | 13 (27%) | $42.00 | $50.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 50 | 12 (24%) | $7.00 | $7.25 |
| Work zone signs (portable) | 4405000000-E | SF | 48 | 12 (25%) | $9.00 | $11.02 |
| Grooving bridge floors | 8161000000-E | SF | 48 | 12 (25%) | $0.50 | $0.80 |
| **" skimmer - (1-1/2") | 6071050000-E | EACH | 35 | 12 (34%) | $850.00 | $1,084.98 |
| Reinforcing steel (culvert) | 8245000000-E | LB | 24 | 12 (50%) | $1.23 | $1.26 |
| Asphalt plant mix, pavement repair | 1693000000-E | TON | 38 | 11 (29%) | $150.00 | $200.00 |
| Proof rolling | 0192000000-N | HR | 28 | 11 (39%) | $150.00 | $230.00 |
| Flashing arrow board | 4415000000-N | EACH | 40 | 10 (25%) | $2,500.00 | $2,909.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| W C English Incorporated | 22 | 13 of 22 |
| Conti Enterprises, Inc | 16 | 7 of 16 |
| Blythe Development Co. | 15 | 10 of 15 |
| Blythe Construction Inc | 14 | 7 of 14 |
| Balfour Beatty Infrastructure Inc | 13 | 7 of 13 |
| S T Wooten Corporation | 13 | 7 of 13 |
| Smith-Rowe, LLC | 11 | 9 of 11 |
| Thalle Construction Co., Inc. | 10 | 4 of 10 |
| Branch Civil Inc | 9 | 7 of 9 |
| Vecellio & Grogan Inc | 9 | 6 of 9 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2024 | C204348 | Iredell, Catawba | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-150 FROM SR-1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US-21 IN IREDELL COUNTY | 4 of 5 | $265,611,433 | +7.0% |
| 21 NOV 2023 | C204873 | Johnston | Grading, drainage, paving, signals, and structures. I-95 AND US-70 BUSINESS (MARKET STREET), EXIT 95 INTERCHANGE FROM OUTLET CENTER DRIVE TO | 5 of 5 | $43,957,424 | +15% |
| 17 JAN 2023 | C204695 | Craven | Design build. US-70 FROM THE HAVELOCK BYPASS TO EAST OF SR-1116 (THURMAN RD). | 4 of 4 | $326,994,000 | +35% |
| 18 OCT 2022 | C204746 | Forsyth | Grading, drainage, paving, and structures. FUTURE I-74 (WINSTON-SALEM NORTHERN BELTWAY) FROM US-311 TO I-40. | 1 of 7 | $126,045,010 | Low, 1.0% under the second |
| 20 SEP 2022 | C204727 | Robeson | Grading, drainage, paving, retaining walls, and structures. I-95 FROM SOUTH OF US-301 TO SOUTH OF NC-20. | 1 of 2 | $247,025,388 | Low, 14% under the second |
| 20 SEP 2022 | C204775 | Dare | Bridge preservation. BRIDGE #9 ON US-64 IN MANNS HARBOR. | 2 of 2 | $49,293,895 | +46% |
| 21 JUN 2022 | C204110 | Cumberland | Grading, drainage, paving, signing, signals, and structures. FAYETTEVILLE OUTER LOOP FROM SOUTH OF SR-1003 (CAMDEN ROAD) TO SOUTH OF US-401. | 6 of 6 | $175,927,734 | +16% |
| 19 APR 2022 | C204694 | Wake | Drainage, pavement rehab, its, and bridge preservation. I-40 FROM SR-1728 (WADE AVENUE) TO I-440/US-1 IN RALEIGH. | 2 of 2 | $16,765,517 | +5.0% |
| 19 APR 2022 | C204438 | Alamance | Grading, drainage, paving, and structure. BRIDGE #112 OVER REEDY FORK CREEK ON NC-87 IN OSSIPEE. | 6 of 7 | $9,107,124 | +35% |
| 19 APR 2022 | C204416 | Forsyth | Grading, drainage, paving, and structure. BRIDGE #243 OVER NC-150 ON SALISBURY RD IN WINSTON-SALEM. | 4 of 5 | $5,695,632 | +29% |
| 18 JAN 2022 | C204568 | Dare | Bridge preservation. BRIDGE #270012 OVER ROANOKE SOUND ON US-64. | 4 of 5 | $26,417,471 | +24% |
| 21 DEC 2021 | C204633 | Forsyth | Grading, drainage, paving, and structure. FUTURE I-74 (WINSTON-SALEM NORTHERN BELTWAY) FROM I-40 TO I-40 BUS/US 421. | 2 of 3 | $271,324,790 | +4.0% |
| 19 OCT 2021 | C204446 | Davidson, Rowan, Stanly | Grading, drainage, paving, and structure. BRIDGES #3 AND #8 OVER YADKIN RIVER AND WINSTON-SALEM SOUTHBOUND RAILROAD ON NC-49. | 8 of 8 | $25,807,196 | +87% |
| 19 OCT 2021 | C204399 | Davidson | Grading, drainage, paving, and structure. US-29/70 & I-85 BUSINESS AT SR-1798 (OLD GREENSBORO ROAD). | 12 of 12 | $33,024,188 | +28% |
| 20 JUL 2021 | C204372 | Carteret | Grading, drainage, paving, and structures. BRIDGE #73 AND #96 OVER THE STRAITS AT HARKERS ISLAND ON SR-1335 (ISLAND RD). | 2 of 4 | $63,542,693 | +6.0% |
| 15 JUN 2021 | C204350 | Nash | Grading, drainage, paving, and structures. I-95 AT SR-1544 (HALIFAX RD), BRIDGE #41 OVER I-95 ON NC-33, AND BRIDGE #224 OVER I-95 ON SR-1510 | 6 of 6 | $27,165,914 | +18% |
| 16 MAR 2021 | C204359 | Johnston | Grading, drainage, paving, and structures. US-70 FROM US-70 BUS TO NEUSE RIVER BRIDGE WITH INTERCHANGES AT SR-1501 (SWIFT CREEK RD) AND SR-1 | 1 of 7 | $58,864,002 | Low, 12% under the second |
| 16 MAR 2021 | C204202 | Henderson | Grading, drainage, paving, and structure rehabilitation. I-26/US-74 WEST BOUND LANES AND EAST BOUND LANES OVER GREEN RIVER. | 1 of 3 | $26,970,631 | Low, 7.0% under the second |
| 16 FEB 2021 | C204434 | Craven | Grading, drainage, paving, and structures. BRIDGE 138 AND BRIDGE 139 OVER THE NEUSE RIVER ON SR-1470. | 6 of 7 | $19,076,951 | +38% |
| 16 FEB 2021 | C204490 | Yadkin, Forsyth | Grading, drainage, paving, and structure. BRIDGE #35 OVER THE YADKIN RIVER ON NC-67. | 7 of 10 | $12,624,517 | +32% |
| 15 SEP 2020 | C204558 | Bladen | Grading, drainage, paving, and structure. REPLACE BRIDGES #16 &17 ON US-701 OVER CAPE FEAR RIVER. | 7 of 8 | $27,557,813 | +18% |
| 15 SEP 2020 | C203978 | Forsyth | Pavement & structure rehabilitation. I-40 FROM BRIDGES (#161 AND #162) OVER MUDDY CREEK TO GUILFORD COUNTY LINE. | 1 of 5 | $16,741,886 | Low, 9.0% under the second |
| 21 JAN 2020 | C204511 | Mecklenburg | Pavement and bridge rehabilitation. I-77 FROM I-277 TO 0.7 MILE NORTH OF NC-27. | 2 of 7 | $11,800,649 | +13% |
| 17 DEC 2019 | C204378 | Sampson | Grading, drainage, paving, signals, and structures. NC-24 FROM US-421/701 AND SR-1296 (SUNSET AVE) TO EAST OF SR-1935 (CECIL ODIE RD). | 5 of 8 | $29,723,540 | +21% |
| 19 NOV 2019 | C204351 | Wake | Grading, drainage, paving, its, and structures. I-40 AND SR-3015 (AIRPORT BLVD) INTERCHANGE AND I-40 WESTBOUND FROM SR-3015 (AIRPORT BLVD) T | 2 of 6 | $36,701,211 | +5.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.