NCDOT letting results, April 19, 2022
8 contracts let by North Carolina DOT on April 19, 2022, $151,848,839 in low bids, a median of 4 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $151,848,839
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204498 | Grading, drainage, paving, and structure. US-17 FROM WASHINGTON BYPASS NORTH OF NC-171 TO MULTI-LANES SOUTH OF WILLIAMSTON. | Beaufort, Martin | 4 | Branch Civil Inc | $86,385,000 | $97,261,501 | +13% | NCDOT |
| C204694 | Drainage, pavement rehab, its, and bridge preservation. I-40 FROM SR-1728 (WADE AVENUE) TO I-440/US-1 IN RALEIGH. | Wake | 2 | Crowder Construction Company | $16,016,112 | $16,765,517 | +5.0% | NCDOT |
| C204572 | Grading, drainage, paving, signals, and culvert. US-70 AT SR-1226/SR-1311 IN BURLINGTON. | Alamance | 3 | Apac - Atlantic, Inc. Thompson Arthur Division | $13,975,135 | $14,369,186 | +3.0% | NCDOT |
| C204703 | Pavement rehabilitation and bridge rehabilitiation. I-85 FROM NC-109 IN THOMASVILLE TO SR-1009 (SOUTH MAIN STREET) IN ARCHDALE. | Davidson, Randolph | 5 | Blythe Construction Inc | $13,384,388 | $13,664,759 | +2.0% | NCDOT |
| C204717 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-74 AND 23 SECTIONS OF SECONDARY ROADS. | Buncombe | 2 | Apac Atlantic Inc DBA Harrison Construction Company | $7,519,598 | $9,798,677 | +30% | NCDOT |
| C204438 | Grading, drainage, paving, and structure. BRIDGE #112 OVER REEDY FORK CREEK ON NC-87 IN OSSIPEE. | Alamance | 7 | Smith-Rowe, LLC | $6,733,159 | $8,115,323 | +21% | NCDOT |
| C204416 | Grading, drainage, paving, and structure. BRIDGE #243 OVER NC-150 ON SALISBURY RD IN WINSTON-SALEM. | Forsyth | 5 | Smith-Rowe, LLC | $4,412,795 | $5,329,808 | +21% | NCDOT |
| C204484 | Grading, drainage, paving, retaining walls, and structure. BRIDGE #84 ON NC-209 OVER MEADOW FORK CREEK. | Madison | 4 | Dellinger, Inc. | $3,422,653 | $5,041,928 | +47% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.