Dellinger, Inc.: NCDOT bid record
Dellinger, Inc. submitted 91 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 15 APR 2025, and was the low bidder on 12 of them (13%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $26,278,981
- Latest bid
- 15 APR 2025
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 27 | 4 | 15% |
| 2014 | 14 | 0 | 0% |
| 2015 | 14 | 0 | 0% |
| 2016 | 6 | 2 | 33% |
| 2017 | 9 | 2 | 22% |
| 2018 | 2 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2021 | 6 | 1 | 17% |
| 2022 | 6 | 1 | 17% |
| 2023 | 3 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Randolph | 6 | 0 | 0% |
| Cabarrus | 5 | 1 | 20% |
| Columbus | 5 | 0 | 0% |
| Robeson | 4 | 0 | 0% |
| Guilford | 3 | 1 | 33% |
| Pitt | 3 | 0 | 0% |
| Stanly | 3 | 1 | 33% |
| Scotland | 3 | 0 | 0% |
| Wake | 3 | 0 | 0% |
| Granville | 3 | 0 | 0% |
| Johnston | 3 | 0 | 0% |
| Anson | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail anchor units, type III | 3215000000-N | EACH | 73 | 53 (73%) | $1,400.00 | $1,600.00 |
| Additional guardrail posts | 3150000000-N | EACH | 84 | 49 (58%) | $11.00 | $13.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 86 | 47 (55%) | $4.62 | $7.25 |
| Barricades (type III) | 4445000000-E | LF | 85 | 46 (54%) | $17.45 | $24.30 |
| Steel beam guardrail | 3030000000-E | LF | 66 | 45 (68%) | $15.00 | $15.12 |
| Asphalt binder for plant mix | 1575000000-E | TON | 85 | 41 (48%) | $608.00 | $595.00 |
| Coir fiber mat | 6037000000-E | SY | 84 | 36 (43%) | $5.05 | $5.75 |
| Seed for temporary seeding | 6018000000-E | LB | 87 | 35 (40%) | $3.55 | $3.00 |
| Matting for erosion control | 6036000000-E | SY | 87 | 34 (39%) | $1.75 | $1.75 |
| Fertilizer for repair seeding | 6093000000-E | TON | 87 | 34 (39%) | $1,000.00 | $1,110.00 |
| Asphalt conc base course, type B25.0B | 1489000000-E | TON | 63 | 34 (54%) | $65.20 | $59.90 |
| Disposal of sign system, U-channel | 4155000000-N | EACH | 53 | 33 (62%) | $3.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 73 | 34 of 73 |
| Smith-Rowe, LLC | 53 | 38 of 53 |
| S T Wooten Corporation | 48 | 27 of 48 |
| Palmetto Infrastructure Inc | 32 | 11 of 32 |
| FSC II LLC DBA Fred Smith Company | 28 | 19 of 28 |
| R.E. Burns & Sons Co., Inc. | 23 | 16 of 23 |
| Lee Construction Company of the Carolinas, Inc. | 19 | 4 of 19 |
| Sanford Contractors Inc | 18 | 12 of 18 |
| United Contractors, Inc. DBA United Contractors Inc. of Iowa | 18 | 10 of 18 |
| Blythe Construction Inc | 17 | 2 of 17 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 APR 2025 | C205061 | Guilford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #400224 OVER SOUTH BUFFALO CREEK ON SR-3000 (MCCONNELL RD) | 1 of 8 | $3,990,713 | Low, 4.0% under the second |
| 17 DEC 2024 | C204969 | Anson | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #030087 OVER RICHARDSON CREEK ON NC-742 | 8 of 11 | $4,982,446 | +32% |
| 18 JUL 2023 | C204725 | Nash | Grading, drainage, paving, and structure. BRIDGE #630091 OVER TAR RIVER ON NC-581. | 2 of 8 | $6,248,088 | +1.0% |
| 18 APR 2023 | C204795 | Columbus | Grading, drainage, paving, and structure. BRIDGE #230005 OVER GAPWAY SWAMP ON US-76. | 7 of 7 | $5,848,172 | +51% |
| 17 JAN 2023 | C204769 | Caswell | Grading, drainage, paving, and structure. BRIDGE #61 OVER HOGAN'S CREEK ON NC-86. | 2 of 7 | $7,141,931 | +9.0% |
| 20 DEC 2022 | C204435 | Pender | Grading, drainage, paving, and structure., grading, drainage, paving, signals, and structure. BRIDGE #15 OVER CROOKED RUN ON NC-11. | 6 of 6 | $3,541,000 | +82% |
| 19 JUL 2022 | C204217 | Pamlico | Grading, drainage, paving, and structure. BRIDGE #38 OVER TRENT CREEK ON NC-55. | 2 of 4 | $6,164,961 | +21% |
| 19 JUL 2022 | C204538 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #80 OVER NORTH DEEP CREEK TRIBUTARY 4B ON SR-1512. | 3 of 7 | $704,970 | +3.0% |
| 19 APR 2022 | C204484 | Madison | Grading, drainage, paving, retaining walls, and structure. BRIDGE #84 ON NC-209 OVER MEADOW FORK CREEK. | 1 of 4 | $3,422,653 | Low, 47% under the second |
| 15 MAR 2022 | C204672 | Mcdowell | Grading, drainage, paving, and structure. BRIDGE 580084 ON SR-1234 OVER I-40. | 2 of 4 | $5,533,121 | +1.0% |
| 18 JAN 2022 | C204417 | Cabarrus | Grading, drainage, paving, and structure. BRIDGE #132 OVER DUTCH BUFFALO CREEK ON NC-73. | 3 of 8 | $4,831,006 | +20% |
| 21 DEC 2021 | C204623 | Brunswick | Grading, drainage, paving, and structures. BRIDGE #65 ON NC-87 OVER BATARORA BRANCH. | 4 of 4 | $1,396,963 | +27% |
| 19 OCT 2021 | C204515 | Pitt | Grading, drainage, paving, and structure. BRIDGE #171 OVER JOHNSON MILL RUN ON SR-1418 (STATON HOUSE RD). | 2 of 5 | $954,876 | +1.0% |
| 20 JUL 2021 | C204519 | Northampton | Grading, drainage, paving, and structure. BRIDGE #15 OVER WILDCAT SWAMP ON SR-1505 (NCHS RD). | 1 of 4 | $1,092,709 | Low, 1.0% under the second |
| 15 JUN 2021 | C204620 | Duplin | Grading, drainage, paving, and structure. BRIDGE #12 OVER LITTLE ROCKFISH CREEK ON NC-11. | 6 of 7 | $2,555,982 | +7.0% |
| 16 MAR 2021 | C204521 | Pitt | Grading, drainage, paving, and structure. BRIDGE #109 OVER GRINDLE CREEK ON SR-1514 (STATON MILL RD). | 4 of 10 | $991,321 | +6.0% |
| 19 JAN 2021 | C204531 | Halifax | Grading, drainage, paving, and structure. BRIDGE # 115 OVER ROCKY SWAMP ON SR-1601. | 4 of 9 | $720,460 | +4.0% |
| 15 DEC 2020 | C204530 | Northampton | Grading, drainage, paving, and structure. BRIDGE #93 OVER JACKS SWAMP ON SR-1203 (JACKS SWAMP RD). | 1 of 10 | $910,000 | Low, 13% under the second |
| 15 DEC 2020 | C204539 | Edgecombe | Grading, drainage, paving, and structure. BRIDGE # 35 OVER OTTER CREEK ON SR-1616 (SHARP POINT ROAD). | 3 of 11 | $1,000,000 | +3.0% |
| 15 MAY 2018 | C203790 | Anson | Grading, drainage, paving, and structure. BRIDGE #8 OVER BROWN CREEK ON SR-1627. | 3 of 7 | $1,243,173 | +6.0% |
| 16 JAN 2018 | C204010 | Sampson | Grading, drainage, paving, and structures. BRIDGES #325 AND 326 OVER LITTLE COHARIE CREEK OVERFLOW AND 327 OVER LITTLE COHARIE CREEK ON SR-1 | 8 of 11 | $1,478,946 | +5.0% |
| 19 DEC 2017 | C203989 | Robeson | Grading, drainage, paving, and structure. BRIDGE #78 OVER TENMILE BRANCH ON SR-2220 (LANE ROAD). | 10 of 11 | $760,865 | +35% |
| 17 OCT 2017 | C203976 | Montgomery, Moore | Grading, drainage, paving, and structure. BRIDGE #53 OVER DROWNING CREEK ON NC-73. | 1 of 7 | $1,012,977 | Low, 5.0% under the second |
| 19 SEP 2017 | C203957 | New Hanover | Grading, drainage, paving, and structure. BRIDGE #19 OVER LORDS CREEK ON SR-1100. | 6 of 6 | $1,933,376 | +23% |
| 15 AUG 2017 | C203944 | Johnston | Grading, drainage, paving, and structure. BRIDGE #32 OVER HANNAH CREEK ON SR-1185. | 8 of 9 | $1,240,377 | +35% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.