NCDOT letting results, July 19, 2022

10 contracts let by North Carolina DOT on July 19, 2022, $360,715,430 in low bids, a median of 3.5 bidders per contract.

Owner
North Carolina DOT
Contracts
10
Low bids, total
$360,715,430
Data through
20 OCT 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
C204728Grading, drainage, paving, retaining walls, and structures. I-95 FROM SOUTH OF NC-20 TO SOUTH OF PROPOSED I-295.Robeson3Webber LLC$282,928,483$283,919,5250.0%NCDOT
C204655Pavement rehabilitation, bridge repair, signing and its. I-440 FROM WEST OF LAKE BOONE TRAIL TO EAST OF SR-2000 (WAKE FOREST RD) IN RALEIGH.Wake3FSC II LLC DBA Fred Smith Company$26,387,245$32,164,540+22%NCDOT
C204752Utility construction and paving. SR-2055 (N POPLAR ST) FROM ELM ST IN ABERDEEN TO NORTH OF BLUES CROSSING LN IN SOUTHERN PINES.Moore1Moffat Pipe Inc$15,564,424NCDOT
C204729Grading, drainage, paving, and walls. SR-1560 (RANCH RD EXT) FROM US-70 BUS/NC-42 TO EXISTING RANCH RD IN CLAYTON.Johnston3FSC II LLC DBA Fred Smith Company$9,742,469$10,556,703+8.0%NCDOT
C204393Grading, drainage, paving, and structure. BRIDGE #168 OVER SMITH RIVER ON NC-14/NC-87.Rockingham5W C English Incorporated$7,851,473$8,079,005+3.0%NCDOT
C204708Grading, drainage, and paving. RAILWAY CROSSING CLOSURE AT SR-1432 (TORY PATH RD) AND SR-1300 EXT (HELMS RD).Union4Blythe Development Co.$5,986,643$6,127,397+2.0%NCDOT
C204217Grading, drainage, paving, and structure. BRIDGE #38 OVER TRENT CREEK ON NC-55.Pamlico4S T Wooten Corporation$5,076,017$6,164,961+21%NCDOT
C204453Bridge preservation. BRIDGES # 51, 345, AND 39 OVER TAR RIVER ON NC-97, SR-1537, AND SR-1714, AND BRIDGE #123 OVER US-64 ON SR-1670.Edgecombe, Nash4American Contracting & Services Inc$4,421,233$5,260,288+19%NCDOT
C204750Resurfacing. 16 SECTIONS OF SECONDARY ROADS.Brunswick3Highland Paving Co LLC$2,072,423$2,110,259+2.0%NCDOT
C204538Grading, drainage, paving, and structure. BRIDGE #80 OVER NORTH DEEP CREEK TRIBUTARY 4B ON SR-1512.Yadkin7Eastern Structures LLC$685,019$687,4130.0%NCDOT
NCDOT contracts let on July 19, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy