Highland Paving Co LLC: NCDOT bid record
Highland Paving Co LLC submitted 82 bids on North Carolina DOT contracts in the data, from 21 MAY 2013 to 16 JUN 2026, and was the low bidder on 25 of them (30%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $316,716,529
- Latest bid
- 16 JUN 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 7 | 4 | 57% |
| 2014 | 4 | 2 | 50% |
| 2015 | 10 | 3 | 30% |
| 2016 | 5 | 1 | 20% |
| 2017 | 1 | 0 | 0% |
| 2018 | 7 | 3 | 43% |
| 2019 | 2 | 0 | 0% |
| 2020 | 6 | 0 | 0% |
| 2021 | 4 | 2 | 50% |
| 2022 | 5 | 2 | 40% |
| 2023 | 6 | 2 | 33% |
| 2024 | 10 | 1 | 10% |
| 2025 | 9 | 2 | 22% |
| 2026 | 6 | 3 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Cumberland | 15 | 9 | 60% |
| Brunswick | 13 | 5 | 38% |
| Pender | 7 | 0 | 0% |
| Moore | 5 | 0 | 0% |
| Columbus | 4 | 2 | 50% |
| Lee | 4 | 1 | 25% |
| Bladen, Columbus | 4 | 1 | 25% |
| Sampson | 3 | 0 | 0% |
| New Hanover | 3 | 0 | 0% |
| Cumberland, Harnett | 3 | 0 | 0% |
| Harnett | 3 | 1 | 33% |
| Wake | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 74 | 61 (82%) | $120.00 | $135.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 60 | 45 (75%) | $0.52 | $0.75 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 59 | 44 (75%) | $0.16 | $0.27 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 53 | 44 (83%) | $1.80 | $2.25 |
| Inductive loop sawcut | 7444000000-E | LF | 50 | 43 (86%) | $6.47 | $7.25 |
| Thermoplastic pavement marking lines (12", 90 mils) | 4700000000-E | LF | 50 | 41 (82%) | $2.50 | $3.05 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 46 | 37 (80%) | $3.75 | $3.50 |
| Permanent raised pavement markers | 4900000000-N | EACH | 46 | 36 (78%) | $5.00 | $10.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 50 | 31 (62%) | $50.00 | $50.00 |
| Matting for erosion control | 6036000000-E | SY | 47 | 31 (66%) | $2.00 | $1.75 |
| Junction box (standard size) | 7324000000-N | EACH | 37 | 30 (81%) | $258.00 | $362.22 |
| Paint pavement marking lines (8") | 4820000000-E | LF | 38 | 29 (76%) | $0.65 | $0.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Barnhill Contracting Company | 69 | 39 of 69 |
| S T Wooten Corporation | 44 | 34 of 44 |
| FSC II LLC DBA Fred Smith Company | 28 | 18 of 28 |
| Johnson Brothers Utility & Paving Company, Inc. | 5 | 3 of 5 |
| Branch Civil Inc | 5 | 1 of 5 |
| King Asphalt Inc | 5 | 3 of 5 |
| Bmco Construction, Inc. | 4 | 1 of 4 |
| Johnson Bros. Utility & Paving Company, Inc. | 4 | 2 of 4 |
| Balfour Beatty Infrastructure Inc | 3 | 3 of 3 |
| W C English Incorporated | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JUN 2026 | C205212 | Pender | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, 9 SECTIONS OF SECONDARY ROADS, AND 6 SECTIONS OF TOWN ROADS | 4 of 4 | $4,718,475 | +16% |
| 16 JUN 2026 | C204970 | Brunswick | GRADING, DRAINAGE, PAVING, AND SIGNALS. NEW ROUTE FROM 0.5 MILES EAST OF BRUNSWICK COUNTY LINE TO 1.5 MILES EAST OF BRUNSWICK COUNTY LINE ON | 3 of 7 | $8,411,806 | +7.0% |
| 19 MAY 2026 | C205199 | Brunswick | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 3 SECTIONS OF NC-133, AND 19 SECTIONS OF SECONDARY ROADS | 1 of 4 | $5,140,451 | Low, 2.0% under the second |
| 19 MAY 2026 | C205187 | Cumberland | GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, AND PAVING, SIGNALS, AND STRUCTURES., GRADING, DRAINAGE, AND PAVI | 1 of 4 | $15,507,762 | Low, 3.0% under the second |
| 17 FEB 2026 | C205036 | Robeson | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1997 (FAYETTEVILLE RD) FROM FARRINGDOM ST TO EAST 22ND ST | 2 of 4 | $43,468,914 | +11% |
| 20 JAN 2026 | C205163 | Lee | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF PRIMARY ROADS, AND 14 SECTIONS OF SECONDARY ROADS | 1 of 3 | $3,073,927 | Low, 2.0% under the second |
| 18 NOV 2025 | C205155 | Moore | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-705, 1 SECTION OF NC-24W, AND 15 SECTIONS OF SECONDARY ROADS | 2 of 3 | $4,106,127 | +1.0% |
| 21 OCT 2025 | C205137 | Lee | MILLING AND RESURFACING. 1 SECTION OF US-1, 1 SECTION OF US-421, AND 6 RAMPS | 3 of 4 | $3,951,940 | +11% |
| 19 AUG 2025 | C205076 | Cumberland, Hoke | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUC | 1 of 5 | $17,747,428 | Low, 3.0% under the second |
| 15 JUL 2025 | C205073 | Brunswick | GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTIONS AT US-17 AND US-17 BUSINESS NORTH AND SOUTH OF SHALLOTTE | 1 of 2 | $25,693,279 | Low, 10% under the second |
| 17 JUN 2025 | C205101 | Pender | GRADING, MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, AND 2 SECTIONS OF SECONDARY ROADS | 4 of 4 | $5,339,991 | +16% |
| 17 JUN 2025 | C205109 | Brunswick | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-87, 1 SECTION OF NC-133, AND 3 SECTIONS OF SECONDARY ROADS | 4 of 4 | $5,925,447 | +13% |
| 18 MAR 2025 | C204797 | Cumberland | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-401 (RAEFORD RD) FROM EAST OF NC-162 (BUNCE RD) TO EAST OF BRIGHTON RD | 3 of 3 | $55,308,495 | +14% |
| 18 FEB 2025 | C204994 | Columbus | DRAINAGE, PAVEMENT REHABILITATION AND BRIDGE REHABILITATION. US-74 (FUTURE I-74) FROM 0.11 MILES EAST OF US-701 BUSINESS TO 0.17 MILES WEST | 3 of 3 | $28,451,000 | +24% |
| 21 JAN 2025 | C204760 | Cumberland | GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALL. SR-1112 FROM WEST OF SR-1115 TO NC-59 & SR-1115 FROM SOUTH OF WALLACE ST TO NC-59 | 2 of 5 | $23,534,776 | +9.0% |
| 17 DEC 2024 | C204988 | Cumberland | GRADING, DRAINAGE, PAVING, SIGNALS, AND WALLS. SR-1003 (CAMDEN RD) FROM PROPOSED FAYETTEVILLE OUTER LOOP TO WEST OF SR-1112 (ROCKFISH RD) | 1 of 4 | $20,241,371 | Low, 2.0% under the second |
| 17 DEC 2024 | C205008 | Chatham | MILLING AND RESURFACING. 1 SECTION OF US-1 N WITH 6 RAMPS, 1 SECTION OF US-64 BUSINESS, AND 1 SECTION OF NC-42 | 3 of 4 | $3,946,996 | +9.0% |
| 19 NOV 2024 | C204942 | New Hanover | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-2048 (GORDON RD) FROM US-17 (MARKET ST) TO I-40 | 4 of 5 | $56,900,001 | +12% |
| 19 NOV 2024 | C205000 | Wake | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF NC-42, AND 14 SECTIONS OF SECONDARY ROADS | 3 of 4 | $2,644,615 | +5.0% |
| 19 NOV 2024 | C204997 | Moore | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-1, 2 SECTIONS OF NC-24, 2 SECTIONS OF NC-690, AND 8 SECTIONS OF SECONDARY | 4 of 4 | $7,113,703 | +41% |
| 19 NOV 2024 | C205002 | Lee | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-15, 1 SECTION OF US-421, 1 SECTION OF NC-87, AND 12 SECTIONS OF SECONDARY | 3 of 4 | $4,257,517 | +10% |
| 18 JUN 2024 | C204964 | Brunswick | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-87, AND 8 SECTIONS OF SECONDARY ROADS | 4 of 4 | $4,682,913 | +17% |
| 18 JUN 2024 | C204965 | Sampson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-50 AND NC-55, AND 10 SECTIONS OF SECONDARY ROADS | 5 of 5 | $5,024,947 | +22% |
| 18 JUN 2024 | C204951 | Hoke, Cumberland | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 6 NON-SYSTEM ROADS | 3 of 3 | $13,180,011 | +10% |
| 20 FEB 2024 | C204912 | Columbus | PAVEMENT REHABILITATION AND BRIDGE PRESERVATION. US-74 (FUTURE I-74) FROM WEST OF NC-214 TO WEST OF SR-1824 (WATER TANK ROAD) | 2 of 3 | $9,552,927 | +9.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.