NCDOT contract C205076 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. SR-1102 (GILLIS HILL RD) FROM SOUTH OF CELTIC DR TO NORTH OF SR-1112 (STONEY POINT RD). Let by North Carolina DOT on August 19, 2025, Cumberland, Hoke. 5 bids received; low bid $17,747,428 by Highland Paving Co LLC.
- Owner
- North Carolina DOT
- Letting
- 19 AUG 2025
- Pay items
- 207
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Highland Paving Co LLC | $17,747,428 | Low |
| 2 | W C English Incorporated | $18,323,698 | +3.0% |
| 3 | Branch Civil Inc | $18,325,585 | +3.0% |
| 4 | FSC II LLC DBA Fred Smith Company | $18,434,335 | +4.0% |
| 5 | Barnhill Contracting Company | $19,093,658 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Highland Paving Co LLC | 2. W C English Incorporated | 3. Branch Civil Inc | 4. FSC II LLC DBA Fred Smith Company | 5. Barnhill Contracting Company |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $889,000 | $916,000 | $896,043 | $915,000 | $954,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $150,000 | $149,000 | $223,000 | $200,000 | $205,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $3,481,413 | $2,236,350 | $1,675,050 | $3,245,000 | $3,487,500 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $0.01 | $0.01 | $8,100.00 | $5,000.00 | $1.00 |
| 0005 | Undercut excavation (0057000000-E) | CY | 1,000 | $21.00 | $17.00 | $16.00 | $50.00 | $55.00 |
| 0006 | Drainage ditch excavation (0134000000-E) | CY | 40 | $18.00 | $18.65 | $28.75 | $25.00 | $35.00 |
| 0007 | Select granular material, class III (0194000000-E) | CY | 900 | $32.00 | $22.00 | $35.00 | $20.00 | $35.00 |
| 0008 | Geotextile for soil stabilization (0196000000-E) | SY | 800 | $4.50 | $3.65 | $4.90 | $4.00 | $6.00 |
| 0009 | Temporary shoring (0199000000-E) | SF | 1,980 | $100.00 | $105.00 | $113.50 | $97.00 | $100.00 |
| 0010 | Rock plating (0223000000-E) | SY | 500 | $122.00 | $75.14 | $185.00 | $127.00 | $143.00 |
| 0011 | Generic grading item (TON) - class IV aggregate stabilization (0255000000-E) | TON | 200 | $62.00 | $43.60 | $65.50 | $44.00 | $55.25 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 580 | $53.00 | $45.40 | $98.25 | $50.00 | $64.00 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 1,810 | $3.50 | $3.68 | $4.85 | $4.00 | $3.50 |
| 0014 | 15" drainage pipe (0335200000-E) | LF | 184 | $62.00 | $65.10 | $90.75 | $93.75 | $62.00 |
| 0015 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 2,532 | $81.00 | $85.05 | $109.50 | $88.00 | $81.00 |
| 0016 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,132 | $97.00 | $101.85 | $133.50 | $103.00 | $97.00 |
| 0017 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 320 | $128.00 | $134.40 | $181.00 | $128.00 | $128.00 |
| 0018 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 76 | $170.00 | $178.50 | $267.50 | $200.00 | $170.00 |
| 0019 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 32 | $220.00 | $231.00 | $350.50 | $266.00 | $220.00 |
| 0020 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 168 | $300.00 | $315.00 | $454.50 | $290.00 | $300.00 |
| 0021 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 652 | $88.00 | $92.40 | $129.50 | $88.00 | $88.00 |
| 0022 | **" RC pipe culv class V - (24") (0449000000-E) | LF | 96 | $141.00 | $148.05 | $273.00 | $140.00 | $141.00 |
| 0023 | **" RC pipe culv class V - (30") (0449000000-E) | LF | 76 | $190.00 | $199.50 | $305.00 | $200.00 | $190.00 |
| 0024 | **" RC pipe culv class V - (42") (0449000000-E) | LF | 160 | $340.00 | $357.00 | $481.00 | $350.00 | $340.00 |
| 0025 | Pipe removal (0995000000-E) | LF | 582 | $46.00 | $36.75 | $62.50 | $25.00 | $57.00 |
| 0026 | Shallow undercut (1099500000-E) | CY | 3,500 | $23.00 | $21.07 | $23.50 | $28.00 | $29.00 |
| 0027 | Class IV subgrade stabilization (1099700000-E) | TON | 7,940 | $52.00 | $42.80 | $65.50 | $37.00 | $52.00 |
| 0028 | Geotextile for subgrade stabilization (1112000000-E) | SY | 12,450 | $5.40 | $6.39 | $5.75 | $3.00 | $5.25 |
| 0029 | Aggregate base course (1121000000-E) | TON | 270 | $60.00 | $60.08 | $75.25 | $54.00 | $67.00 |
| 0030 | Incidental stone base (1220000000-E) | TON | 200 | $60.00 | $54.00 | $76.25 | $70.00 | $63.00 |
| 0031 | Prime coat (1275000000-E) | GAL | 256 | $9.00 | $15.75 | $17.25 | $6.00 | $9.75 |
| 0032 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 12,790 | $6.00 | $10.76 | $5.10 | $7.00 | $7.00 |
| 0033 | Milln asphalt PVMT ***** - ***** - (0" to 3") (1308000000-E) | SY | 780 | $12.20 | $15.69 | $11.00 | $13.00 | $19.00 |
| 0034 | Incidental milling (1330000000-E) | SY | 1,000 | $12.20 | $16.01 | $11.00 | $13.00 | $25.00 |
| 0035 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 9,600 | $75.65 | $86.10 | $93.75 | $94.00 | $97.00 |
| 0036 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 8,100 | $80.30 | $91.35 | $99.50 | $93.00 | $90.00 |
| 0037 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 3,000 | $84.00 | $91.35 | $99.50 | $84.00 | $115.00 |
| 0038 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 5,300 | $73.00 | $78.75 | $85.75 | $93.00 | $89.00 |
| 0039 | Asphalt binder for plant mix (1575000000-E) | TON | 1,340 | $555.00 | $630.00 | $687.00 | $650.00 | $586.00 |
| 0040 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 245 | $260.00 | $193.90 | $425.00 | $135.00 | $325.00 |
| 0041 | Subdrain excavation (2022000000-E) | CY | 650 | $35.00 | $36.75 | $34.50 | $35.00 | $35.00 |
| 0042 | Geotextile for subsurface drains (2026000000-E) | SY | 2,900 | $12.00 | $12.60 | $3.45 | $5.00 | $12.00 |
| 0043 | Subdrain coarse aggregate (2036000000-E) | CY | 487 | $85.00 | $89.25 | $110.50 | $70.00 | $85.00 |
| 0044 | 6" perforated subdrain pipe (2044000000-E) | LF | 2,900 | $17.00 | $17.85 | $15.00 | $10.00 | $17.00 |
| 0045 | Subdrain pipe outlet (2070000000-N) | EACH | 6 | $400.00 | $420.00 | $358.50 | $500.00 | $400.00 |
| 0046 | 6" outlet pipe (2077000000-E) | LF | 36 | $40.00 | $42.00 | $40.25 | $50.00 | $40.00 |
| 0047 | Endwalls (2209000000-E) | CY | 14 | $1,550.00 | $1,627.50 | $2,940.00 | $3,130.00 | $1,550.00 |
| 0048 | Pipe collars (2253000000-E) | CY | 0.66 | $3,000.00 | $3,150.00 | $2,820.00 | $3,500.00 | $3,000.00 |
| 0049 | Masonry drainage structures (2286000000-N) | EACH | 60 | $2,885.00 | $3,029.25 | $5,320.00 | $4,750.00 | $3,410.00 |
| 0050 | Masonry drainage structures (2308000000-E) | LF | 6.40 | $790.00 | $829.50 | $242.50 | $600.00 | $790.00 |
| 0051 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 5 | $1,410.00 | $1,139.25 | $1,430.00 | $1,129.00 | $1,610.00 |
| 0052 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $2,925.00 | $2,730.00 | $1,320.00 | $1,950.00 | $3,125.00 |
| 0053 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 18 | $1,335.00 | $1,060.50 | $1,300.00 | $1,055.00 | $1,535.00 |
| 0054 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 5 | $1,575.00 | $1,312.50 | $1,680.00 | $1,220.00 | $1,775.00 |
| 0055 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 19 | $1,575.00 | $1,312.50 | $1,650.00 | $1,265.00 | $1,775.00 |
| 0056 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 9 | $1,575.00 | $1,312.50 | $1,650.00 | $1,265.00 | $1,775.00 |
| 0057 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $1,175.00 | $892.50 | $1,030.00 | $895.00 | $1,375.00 |
| 0058 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 2 | $1,250.00 | $1,732.50 | $1,320.00 | $2,450.00 | $850.00 |
| 0059 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 2,570 | $33.65 | $34.90 | $43.75 | $38.00 | $33.65 |
| 0060 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 4,300 | $25.75 | $30.70 | $32.50 | $30.00 | $25.75 |
| 0061 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 9,150 | $28.35 | $32.79 | $39.25 | $26.00 | $28.35 |
| 0062 | Concrete valley gutter (2580000000-E) | LF | 580 | $28.35 | $34.90 | $55.25 | $28.00 | $28.35 |
| 0063 | 4" concrete sidewalk (2591000000-E) | SY | 4,900 | $54.42 | $60.10 | $66.50 | $52.00 | $54.42 |
| 0064 | Concrete curb ramps (2605000000-N) | EACH | 6 | $2,150.00 | $2,257.50 | $3,180.00 | $2,150.00 | $2,250.00 |
| 0065 | 6" concrete driveway (2612000000-E) | SY | 880 | $92.39 | $73.75 | $110.50 | $81.25 | $92.39 |
| 0066 | 4" concrete paved ditch (2619000000-E) | SY | 130 | $110.00 | $60.00 | $174.00 | $65.00 | $110.00 |
| 0067 | 5" monolithic concrete islands (surface mounted) (2647000000-E) | SY | 340 | $60.00 | $63.00 | $111.00 | $75.00 | $78.50 |
| 0068 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 270 | $125.00 | $94.75 | $197.00 | $160.00 | $210.00 |
| 0069 | Adjustment of catch basins (2800000000-N) | EACH | 1 | $1,550.00 | $1,575.00 | $2,650.00 | $1,250.00 | $1,500.00 |
| 0070 | Steel beam guardrail (3030000000-E) | LF | 525 | $28.00 | $29.95 | $31.75 | $28.00 | $28.00 |
| 0071 | Steel beam guardrail, shop curved (3045000000-E) | LF | 50 | $28.50 | $29.93 | $32.50 | $28.50 | $28.50 |
| 0072 | Additional guardrail posts (3150000000-N) | EACH | 5 | $11.00 | $11.75 | $12.50 | $11.00 | $11.00 |
| 0073 | Guardrail end units, type at-1 (3195000000-N) | EACH | 1 | $800.00 | $840.00 | $909.00 | $800.00 | $800.00 |
| 0074 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 3 | $850.00 | $892.50 | $966.00 | $850.00 | $850.00 |
| 0075 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $3,250.00 | $3,412.50 | $3,690.00 | $3,250.00 | $3,250.00 |
| 0076 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 1 | $2,500.00 | $2,730.00 | $2,840.00 | $2,500.00 | $2,500.00 |
| 0077 | Rip rap, class I (3628000000-E) | TON | 520 | $115.00 | $72.11 | $115.50 | $98.00 | $112.00 |
| 0078 | Rip rap, class B (3649000000-E) | TON | 349 | $99.00 | $70.00 | $134.00 | $98.00 | $112.00 |
| 0079 | Geotextile for drainage (3656000000-E) | SY | 2,165 | $4.30 | $3.10 | $2.85 | $3.00 | $4.50 |
| 0080 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 240 | $8.50 | $8.50 | $8.70 | $7.25 | $7.95 |
| 0081 | Sign erection, type E (4102000000-N) | EACH | 24 | $208.65 | $204.75 | $255.50 | $85.00 | $195.00 |
| 0082 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 6 | $321.00 | $315.00 | $284.00 | $95.00 | $300.00 |
| 0083 | Disposal of sign system, U-channel (4155000000-N) | EACH | 20 | $10.70 | $10.50 | $17.00 | $15.00 | $10.00 |
| 0084 | Disposal of support, U-channel (4192000000-N) | EACH | 4 | $10.70 | $10.50 | $17.00 | $25.00 | $10.00 |
| 0085 | Work zone signs (stationary) (4400000000-E) | SF | 184 | $9.90 | $9.71 | $9.20 | $10.00 | $9.25 |
| 0086 | Work zone signs (portable) (4405000000-E) | SF | 296 | $14.00 | $9.00 | $10.50 | $36.00 | $15.00 |
| 0087 | Work zone signs (barricade mounted) (4410000000-E) | SF | 46 | $9.60 | $9.60 | $11.00 | $20.00 | $8.95 |
| 0088 | Flashing arrow board (4415000000-N) | EACH | 2 | $2,350.00 | $2,060.43 | $3,400.00 | $500.00 | $2,195.00 |
| 0089 | Portable changeable message sign (4420000000-N) | EACH | 2 | $9,000.00 | $4,748.85 | $9,240.00 | $2,000.00 | $8,395.00 |
| 0090 | Drums (4430000000-N) | EACH | 190 | $70.00 | $70.00 | $90.75 | $60.00 | $43.00 |
| 0091 | Barricades (type III) (4445000000-E) | LF | 88 | $34.00 | $23.55 | $49.50 | $30.00 | $22.00 |
| 0092 | Flagger (4455000000-N) | DAY | 656 | $450.00 | $447.70 | $341.00 | $700.00 | $525.00 |
| 0093 | Temporary crash cushions (4465000000-N) | EACH | 2 | $10,900 | $10,500 | $10,500 | $12,500 | $6,500.00 |
| 0094 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 4 | $3,100.00 | $7,875.00 | $3,500.00 | $6,000.00 | $2,500.00 |
| 0095 | TMA (4480000000-N) | EACH | 2 | $20,000 | $6,165.85 | $44,990 | $4,000.00 | $42,500 |
| 0096 | Portable concrete barrier (anchored) (4490000000-E) | LF | 387 | $74.00 | $73.50 | $96.25 | $70.00 | $125.00 |
| 0097 | Remove & reset portable concrete barrier (anchored) (4505000000-E) | LF | 676 | $25.00 | $73.50 | $56.00 | $40.00 | $35.00 |
| 0098 | Temporary raised pavement markers (4650000000-N) | EACH | 1,235 | $7.54 | $6.25 | $6.75 | $7.54 | $7.54 |
| 0099 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 31,799 | $0.50 | $0.58 | $0.60 | $0.50 | $0.50 |
| 0100 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 615 | $2.42 | $3.36 | $3.65 | $2.42 | $2.42 |
| 0101 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,139 | $15.00 | $8.51 | $9.10 | $15.00 | $15.00 |
| 0102 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 67 | $126.50 | $128.10 | $138.50 | $126.50 | $126.50 |
| 0103 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 29 | $260.00 | $253.05 | $274.00 | $260.00 | $260.00 |
| 0104 | Paint pavement marking lines (4") (4810000000-E) | LF | 160,094 | $0.22 | $0.18 | $0.20 | $0.22 | $0.22 |
| 0105 | Paint pavement marking lines (8") (4820000000-E) | LF | 5,466 | $0.71 | $1.47 | $1.60 | $0.71 | $0.71 |
| 0106 | Paint pavement marking lines (24") (4835000000-E) | LF | 856 | $7.88 | $2.63 | $2.85 | $7.88 | $7.88 |
| 0107 | Paint pavement marking symbol (4845000000-N) | EACH | 176 | $75.00 | $46.20 | $50.00 | $75.00 | $75.00 |
| 0108 | Removal of pavement marking lines (4") (4850000000-E) | LF | 103,113 | $0.15 | $0.12 | $0.15 | $0.15 | $0.15 |
| 0109 | Removal of pavement marking lines (8") (4860000000-E) | LF | 3,120 | $0.86 | $0.97 | $1.10 | $0.86 | $0.86 |
| 0110 | Removal of pavement marking lines (24") (4870000000-E) | LF | 409 | $8.23 | $3.68 | $4.00 | $8.23 | $8.23 |
| 0111 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 80 | $52.60 | $18.90 | $20.50 | $52.60 | $52.60 |
| 0112 | Permanent raised pavement markers (4900000000-N) | EACH | 689 | $7.54 | $5.09 | $5.50 | $7.54 | $7.54 |
| 0113 | Portable lighting (5255000000-N) | LS | 1 | $85,000 | $286,350 | $95,590 | $400,000 | $198,000 |
| 0114 | 2" water line (5325200000-E) | LF | 131 | $50.00 | $78.75 | $63.50 | $61.00 | $75.00 |
| 0115 | 8" water line (5325800000-E) | LF | 3,111 | $105.00 | $150.15 | $132.00 | $104.00 | $143.00 |
| 0116 | 12" water line (5326200000-E) | LF | 858 | $130.00 | $183.75 | $190.00 | $138.00 | $175.00 |
| 0117 | 16" water line (5326600000-E) | LF | 5,672 | $205.00 | $241.50 | $243.50 | $220.00 | $230.00 |
| 0118 | 20" water line (5327000000-E) | LF | 262 | $250.00 | $157.50 | $107.50 | $177.00 | $150.00 |
| 0119 | DI H2O pipe fittings (5329000000-E) | LB | 24,628 | $16.00 | $19.95 | $19.75 | $16.00 | $19.00 |
| 0120 | 2" valve (5536000000-E) | EACH | 1 | $2,000.00 | $1,837.50 | $2,600.00 | $2,200.00 | $1,750.00 |
| 0121 | 6" valve (5540000000-E) | EACH | 13 | $2,700.00 | $2,520.00 | $3,580.00 | $3,100.00 | $2,400.00 |
| 0122 | 8" valve (5546000000-E) | EACH | 9 | $3,700.00 | $3,412.50 | $4,970.00 | $4,200.00 | $3,250.00 |
| 0123 | 12" valve (5558000000-E) | EACH | 2 | $6,300.00 | $6,037.50 | $8,500.00 | $7,200.00 | $5,750.00 |
| 0124 | 16" valve (5558600000-E) | EACH | 7 | $15,000 | $14,674 | $20,230 | $12,350 | $13,975 |
| 0125 | **" tapping sleeve & valve - (2") (5571000000-E) | EACH | 1 | $3,500.00 | $4,200.00 | $4,870.00 | $5,600.00 | $4,000.00 |
| 0126 | 8" tapping sleeve & valve (5571800000-E) | EACH | 1 | $6,300.00 | $10,605 | $18,500 | $16,000 | $10,100 |
| 0127 | 16" tapping sleeve & valve (5572600000-E) | EACH | 1 | $41,000 | $39,060 | $50,300 | $41,000 | $37,200 |
| 0128 | **" comb air valve - (2") (5590000000-E) | EACH | 3 | $16,000 | $19,688 | $14,450 | $16,500 | $18,750 |
| 0129 | Relocate water meter (5648000000-N) | EACH | 2 | $1,200.00 | $3,150.00 | $3,125.00 | $4,200.00 | $3,000.00 |
| 0130 | Fire hydrant (5666000000-N) | EACH | 13 | $6,300.00 | $8,400.00 | $8,975.00 | $7,500.00 | $8,000.00 |
| 0131 | Relocate fire hydrant (5672000000-N) | EACH | 1 | $3,500.00 | $7,875.00 | $4,830.00 | $5,400.00 | $7,500.00 |
| 0132 | Fire hydrant leg (5673000000-E) | LF | 130 | $70.00 | $73.50 | $145.50 | $70.00 | $70.00 |
| 0133 | Water service line (<2") (5686500000-E) | LF | 13 | $50.00 | $42.00 | $133.50 | $175.00 | $40.00 |
| 0134 | 8" sanitary gravity sewer (5691300000-E) | LF | 901 | $250.00 | $262.50 | $209.00 | $187.00 | $250.00 |
| 0135 | 12" sanitary gravity sewer (5691500000-E) | LF | 233 | $350.00 | $367.50 | $332.00 | $190.00 | $350.00 |
| 0136 | Sanitary sewer clean-out (5768000000-N) | EACH | 1 | $1,500.00 | $2,625.00 | $6,150.85 | $2,400.00 | $2,500.00 |
| 0137 | Sewer service line (5768500000-E) | LF | 8 | $100.00 | $157.50 | $365.50 | $360.00 | $150.00 |
| 0138 | 4' dia utility manhole (5775000000-E) | EACH | 10 | $5,000.00 | $7,140.00 | $11,085 | $17,500 | $6,800.00 |
| 0139 | Utility manhole wall 4' dia (5781000000-E) | LF | 52.30 | $400.00 | $682.50 | $1,060.00 | $600.00 | $650.00 |
| 0140 | Abandon **" utility pipe - (2") (5798000000-E) | LF | 65 | $25.00 | $10.50 | $16.25 | $35.00 | $10.00 |
| 0141 | Abandon 8" utility pipe (5801000000-E) | LF | 2,720 | $30.00 | $13.65 | $18.75 | $11.00 | $13.00 |
| 0142 | Abandon 12" utility pipe (5804000000-E) | LF | 621 | $40.00 | $25.20 | $36.00 | $18.00 | $24.00 |
| 0143 | Abandon 16" utility pipe (5810000000-E) | LF | 4,550 | $45.00 | $32.55 | $25.50 | $26.00 | $31.00 |
| 0144 | Remove fire hydrant (5815500000-N) | EACH | 6 | $2,500.00 | $1,575.00 | $3,600.00 | $2,700.00 | $1,500.00 |
| 0145 | 6" encasement pipe (5835400000-E) | LF | 81 | $85.00 | $131.25 | $129.50 | $125.00 | $125.00 |
| 0146 | 16" encasement pipe (5835700000-E) | LF | 34 | $350.00 | $210.00 | $194.00 | $300.00 | $200.00 |
| 0147 | 24" encasement pipe (5836000000-E) | LF | 452 | $325.00 | $288.75 | $287.00 | $320.00 | $275.00 |
| 0148 | 30" encasement pipe (5836200000-E) | LF | 78 | $450.00 | $367.50 | $330.00 | $380.00 | $350.00 |
| 0149 | 36" encasement pipe (5836400000-E) | LF | 236 | $525.00 | $446.25 | $387.00 | $390.00 | $425.00 |
| 0150 | Bore & jack **" - (24") (5872500000-E) | LF | 289 | $750.00 | $519.75 | $683.00 | $550.00 | $975.00 |
| 0151 | Bore & jack **" - (36") (5872500000-E) | LF | 121 | $1,300.00 | $640.50 | $879.00 | $780.00 | $1,900.00 |
| 0152 | Direct drill **" - (20") (5872600000-E) | LF | 262 | $400.00 | $262.50 | $217.00 | $225.00 | $250.00 |
| 0153 | Temporary silt fence (6000000000-E) | LF | 14,240 | $2.60 | $2.73 | $2.85 | $2.60 | $2.60 |
| 0154 | Stone for erosion control, class A (6006000000-E) | TON | 320 | $99.00 | $67.00 | $101.00 | $85.00 | $109.00 |
| 0155 | Stone for erosion control, class B (6009000000-E) | TON | 930 | $99.00 | $68.58 | $116.00 | $70.00 | $109.00 |
| 0156 | Sediment control stone (6012000000-E) | TON | 895 | $63.00 | $59.60 | $93.00 | $65.00 | $75.00 |
| 0157 | Temporary mulching (6015000000-E) | ACRE | 19 | $1,675.00 | $1,758.75 | $1,360.00 | $1,675.00 | $1,675.00 |
| 0158 | Seed for temporary seeding (6018000000-E) | LB | 1,000 | $3.00 | $3.20 | $3.40 | $3.00 | $3.00 |
| 0159 | Fertilizer for temporary seeding (6021000000-E) | TON | 4.50 | $850.00 | $892.50 | $1,360.00 | $850.00 | $850.00 |
| 0160 | Temporary slope drains (6024000000-E) | LF | 345 | $25.00 | $14.40 | $46.50 | $15.00 | $20.00 |
| 0161 | Safety fence (6029000000-E) | LF | 1,660 | $2.20 | $2.31 | $2.25 | $2.20 | $2.20 |
| 0162 | Silt excavation (6030000000-E) | CY | 1,270 | $9.00 | $0.01 | $9.35 | $25.00 | $20.00 |
| 0163 | Matting for erosion control (6036000000-E) | SY | 14,360 | $1.50 | $1.58 | $1.70 | $1.50 | $1.50 |
| 0164 | Coir fiber mat (6037000000-E) | SY | 100 | $6.00 | $6.35 | $5.70 | $12.00 | $6.00 |
| 0165 | 1/4" hardware cloth (6042000000-E) | LF | 2,445 | $4.00 | $4.20 | $4.25 | $4.00 | $4.00 |
| 0166 | Special stilling basins (6070000000-N) | EACH | 4 | $870.00 | $1,198.80 | $1,110.00 | $1,500.00 | $1,650.00 |
| 0167 | Flocculant (6071002000-E) | LB | 1,980 | $10.00 | $18.70 | $10.25 | $3.00 | $8.00 |
| 0168 | Coir fiber wattle (6071012000-E) | LF | 5,900 | $9.75 | $10.24 | $16.00 | $9.75 | $9.75 |
| 0169 | Coir fiber baffle (6071030000-E) | LF | 70 | $9.75 | $10.24 | $11.25 | $10.00 | $9.75 |
| 0170 | Seeding and mulching (6084000000-E) | ACRE | 15 | $2,525.00 | $2,651.25 | $2,810.00 | $2,000.00 | $2,525.00 |
| 0171 | Mowing (6087000000-E) | ACRE | 15 | $250.00 | $262.50 | $227.00 | $250.00 | $250.00 |
| 0172 | Seed for repair seeding (6090000000-E) | LB | 200 | $10.00 | $10.50 | $6.55 | $10.00 | $10.00 |
| 0173 | Fertilizer for repair seeding (6093000000-E) | TON | 0.75 | $850.00 | $892.51 | $1,360.00 | $900.00 | $850.00 |
| 0174 | Seed for supplemental seeding (6096000000-E) | LB | 325 | $8.00 | $8.40 | $6.25 | $8.00 | $8.00 |
| 0175 | Fertilizer topdressing (6108000000-E) | TON | 9.75 | $1,200.00 | $1,260.00 | $1,310.00 | $700.00 | $1,200.00 |
| 0176 | Impervious dike (6111000000-E) | LF | 500 | $75.00 | $78.75 | $85.25 | $100.00 | $75.00 |
| 0177 | Specialized hand mowing (6114500000-N) | MHR | 10 | $200.00 | $210.00 | $142.00 | $250.00 | $200.00 |
| 0178 | Response for erosion control (6117000000-N) | EACH | 100 | $1.00 | $1.05 | $284.00 | $1.00 | $1.00 |
| 0179 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,250.00 | $3,087.66 | $2,350.00 | $1,000.00 | $2,500.00 |
| 0180 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 360 | $150.00 | $182.78 | $230.50 | $100.00 | $100.00 |
| 0181 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 120 | $200.00 | $294.86 | $230.50 | $200.00 | $240.00 |
| 0182 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $1,250.00 | $294.86 | $608.00 | $1,250.00 | $1,500.00 |
| 0183 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 2 (6141000000-E) | SY | 50 | $8.33 | $105.00 | $22.75 | $12.00 | $10.00 |
| 0184 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 8 | $1,250.00 | $1,312.50 | $1,700.00 | $1,250.00 | $1,250.00 |
| 0185 | Signal cable (7060000000-E) | LF | 6,050 | $5.75 | $6.04 | $5.75 | $5.75 | $5.75 |
| 0186 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 22 | $1,300.00 | $1,365.00 | $1,570.00 | $1,300.00 | $1,300.00 |
| 0187 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 9 | $1,500.00 | $1,575.00 | $1,890.00 | $1,500.00 | $1,500.00 |
| 0188 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 2 | $1,750.00 | $1,837.50 | $2,520.00 | $1,750.00 | $1,750.00 |
| 0189 | Messenger cable (3/8") (7264000000-E) | LF | 990 | $5.00 | $5.25 | $10.25 | $5.00 | $5.00 |
| 0190 | Junction box (standard size) (7324000000-N) | EACH | 3 | $950.00 | $997.50 | $855.00 | $950.00 | $950.00 |
| 0191 | Wood pole (7360000000-N) | EACH | 2 | $2,000.00 | $2,100.00 | $2,640.00 | $2,000.00 | $2,000.00 |
| 0192 | Guy assembly (7372000000-N) | EACH | 4 | $950.00 | $997.50 | $1,070.00 | $950.00 | $950.00 |
| 0193 | Lead-in cable (14-2) (7456100000-E) | LF | 2,125 | $2.85 | $2.99 | $3.45 | $2.85 | $2.85 |
| 0194 | Metal strain signal pole (7576000000-N) | EACH | 2 | $24,500 | $25,725 | $22,380 | $24,500 | $24,500 |
| 0195 | Soil test (7613000000-N) | EACH | 2 | $4,500.00 | $4,725.00 | $3,420.00 | $4,500.00 | $4,500.00 |
| 0196 | Drilled pier foundation (7614100000-E) | CY | 20 | $2,250.00 | $2,362.50 | $2,520.00 | $2,250.00 | $2,250.00 |
| 0197 | Metal strain pole design (7630000000-N) | EACH | 2 | $200.00 | $210.00 | $137.50 | $200.00 | $200.00 |
| 0198 | Sign for signals (7636000000-N) | EACH | 9 | $450.00 | $472.50 | $774.50 | $450.00 | $450.00 |
| 0199 | Type II pedestal with foundation (7642200000-N) | EACH | 8 | $4,500.00 | $4,725.00 | $4,030.00 | $4,500.00 | $4,500.00 |
| 0200 | Generic signal item (EA) - 2070LX controller (7980000000-N) | EACH | 3 | $7,500.00 | $7,875.00 | $6,310.00 | $7,500.00 | $7,500.00 |
| 0201 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 8 | $12,000 | $12,600 | $17,220 | $12,000 | $12,000 |
| 0202 | Remv exist STR ****** culv (402) - (25+46.30 -LB-) (8056000000-N) | LS | 1 | $15,575 | $316,000 | $17,700 | $7,500.00 | $1,575.00 |
| 0203 | Box culv excav @ ******** - (25+46.30 -LB-) (8130000000-N) | LS | 1 | $164,700 | $504,000 | $170,430 | $200,000 | $150,000 |
| 0204 | Foundation conditioning material, box culvert (8133000000-E) | TON | 409 | $85.00 | $89.00 | $96.50 | $80.00 | $85.00 |
| 0205 | Class A concrete (culvert) (8196000000-E) | CY | 633.50 | $700.00 | $735.00 | $795.50 | $1,100.00 | $700.00 |
| 0206 | Reinforcing steel (culvert) (8245000000-E) | LB | 97,354 | $2.50 | $2.63 | $2.85 | $2.30 | $2.50 |
| 0207 | Soldier pile retaining walls (8802014000-E) | SF | 1,600 | $464.00 | $676.00 | $515.00 | $420.00 | $453.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of August 19, 2025. Compiled by Mirage Metrics.