NCDOT letting results, June 17, 2025

14 contracts let by North Carolina DOT on June 17, 2025, $125,991,120 in low bids, a median of 4 bidders per contract.

Owner
North Carolina DOT
Contracts
14
Low bids, total
$125,991,120
Data through
20 OCT 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
C205037GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #280067 AND #280068 OVER SR-1192 ON US-29/US-70Davidson5Smith-Rowe, LLC$21,685,505$22,574,471+4.0%NCDOT
C204798GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND BRIDGE PRESERVATION. NC-62 FROM SR-1154 (KERSEY VALLEY RD) TO SR-1162 (WEANT RDGuilford4Triangle Grading & Paving Inc$18,699,763$21,485,000+15%NCDOT
C205015GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40Haywood8Zachry Construction Corporation$18,127,601$19,455,885+7.0%NCDOT
C205041GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY)Forsyth8Smith-Rowe, LLC$13,453,482$13,504,1480.0%NCDOT
C205016GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109Davidson9Apac - Atlantic, Inc. Thompson Arthur Division$7,680,854$8,016,452+4.0%NCDOT
C205108MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 42 SECTIONS OF SECONDARY ROADSRutherford2Blythe Construction Inc$7,442,923$7,707,176+4.0%NCDOT
C205107MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF US-221 AND FIRE DEPARTMENT PARKING LOTMcdowell, Rutherford1Apac Atlantic Inc Asheville Division$7,186,288NCDOT
C205097MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 51 SECTIONS OF SECONDARY ROADSBuncombe3French Broad Paving Inc$6,085,293$6,879,513+13%NCDOT
C205110MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-41, 1 SECTION OF NC-55, AND 1 SECTION OF SECONDARY ROADSampson2Barnhill Contracting Company$5,243,980$5,271,921+1.0%NCDOT
C205109MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-87, 1 SECTION OF NC-133, AND 3 SECTIONS OF SECONDARY ROADSBrunswick4S T Wooten Corporation$5,227,022$5,464,350+5.0%NCDOT
C205101GRADING, MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, AND 2 SECTIONS OF SECONDARY ROADSPender4S T Wooten Corporation$4,612,280$4,804,452+4.0%NCDOT
C204898GRADING, DRAINAGE, PAVING, AND CULVERT. BUSINESS PARK ACCESS ROAD FROM FUJI DIOSYTH BIOTECHNOLOGIES TO BUMGARDNER ROAD EXTWake5Cardinal Civil Contracting LLC$4,509,744$4,642,464+3.0%NCDOT
C204454BRIDGE REHABILITATION. BRIDGE #76 OVER SR-3556 ON US-25, AND BRIDGES #53 & #278 OVER FRENCH BROAD RIVER ON NC-146 & SR-1348Buncombe7Freyssinet Inc$4,121,385$4,343,000+5.0%NCDOT
C205014BRIDGE PRESERVATION. BRIDGE #500608 OVER NEUSE RIVER ON SR-1923 AND BRIDGE #500042 OVER I-95 ON US-70Johnston3American Civil Constructors West Coast LLC$1,915,000$2,398,648+25%NCDOT
NCDOT contracts let on June 17, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy