NCDOT letting results, June 17, 2025
14 contracts let by North Carolina DOT on June 17, 2025, $125,991,120 in low bids, a median of 4 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 14
- Low bids, total
- $125,991,120
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C205037 | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #280067 AND #280068 OVER SR-1192 ON US-29/US-70 | Davidson | 5 | Smith-Rowe, LLC | $21,685,505 | $22,574,471 | +4.0% | NCDOT |
| C204798 | GRADING, DRAINAGE, PAVING, AND SIGNALS., GRADING, DRAINAGE, PAVING, SIGNALS, AND BRIDGE PRESERVATION. NC-62 FROM SR-1154 (KERSEY VALLEY RD) TO SR-1162 (WEANT RD | Guilford | 4 | Triangle Grading & Paving Inc | $18,699,763 | $21,485,000 | +15% | NCDOT |
| C205015 | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40 | Haywood | 8 | Zachry Construction Corporation | $18,127,601 | $19,455,885 | +7.0% | NCDOT |
| C205041 | GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY) | Forsyth | 8 | Smith-Rowe, LLC | $13,453,482 | $13,504,148 | 0.0% | NCDOT |
| C205016 | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | Davidson | 9 | Apac - Atlantic, Inc. Thompson Arthur Division | $7,680,854 | $8,016,452 | +4.0% | NCDOT |
| C205108 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 42 SECTIONS OF SECONDARY ROADS | Rutherford | 2 | Blythe Construction Inc | $7,442,923 | $7,707,176 | +4.0% | NCDOT |
| C205107 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF US-221 AND FIRE DEPARTMENT PARKING LOT | Mcdowell, Rutherford | 1 | Apac Atlantic Inc Asheville Division | $7,186,288 | NCDOT | ||
| C205097 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 51 SECTIONS OF SECONDARY ROADS | Buncombe | 3 | French Broad Paving Inc | $6,085,293 | $6,879,513 | +13% | NCDOT |
| C205110 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-41, 1 SECTION OF NC-55, AND 1 SECTION OF SECONDARY ROAD | Sampson | 2 | Barnhill Contracting Company | $5,243,980 | $5,271,921 | +1.0% | NCDOT |
| C205109 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-87, 1 SECTION OF NC-133, AND 3 SECTIONS OF SECONDARY ROADS | Brunswick | 4 | S T Wooten Corporation | $5,227,022 | $5,464,350 | +5.0% | NCDOT |
| C205101 | GRADING, MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421, AND 2 SECTIONS OF SECONDARY ROADS | Pender | 4 | S T Wooten Corporation | $4,612,280 | $4,804,452 | +4.0% | NCDOT |
| C204898 | GRADING, DRAINAGE, PAVING, AND CULVERT. BUSINESS PARK ACCESS ROAD FROM FUJI DIOSYTH BIOTECHNOLOGIES TO BUMGARDNER ROAD EXT | Wake | 5 | Cardinal Civil Contracting LLC | $4,509,744 | $4,642,464 | +3.0% | NCDOT |
| C204454 | BRIDGE REHABILITATION. BRIDGE #76 OVER SR-3556 ON US-25, AND BRIDGES #53 & #278 OVER FRENCH BROAD RIVER ON NC-146 & SR-1348 | Buncombe | 7 | Freyssinet Inc | $4,121,385 | $4,343,000 | +5.0% | NCDOT |
| C205014 | BRIDGE PRESERVATION. BRIDGE #500608 OVER NEUSE RIVER ON SR-1923 AND BRIDGE #500042 OVER I-95 ON US-70 | Johnston | 3 | American Civil Constructors West Coast LLC | $1,915,000 | $2,398,648 | +25% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.